| Line 5: |
Line 5: |
| | |process_org_owner_is_private=No | | |process_org_owner_is_private=No |
| | |process_org_owner=49073 | | |process_org_owner=49073 |
| − | |process_provision_org_owner_directory=604578, 471712 | + | |process_provision_org_owner_directory=471712, 604578 |
| | |process_provision_org_group=5587 | | |process_provision_org_group=5587 |
| | |process_provision_org_directory=Directorate of Development of the relevant Regional Unit | | |process_provision_org_directory=Directorate of Development of the relevant Regional Unit |
| Line 78: |
Line 78: |
| | |process_evidence_submission_type=Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post) | | |process_evidence_submission_type=Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_description=Acknowledgement of land use by the relevant Building Agency, together with the submitted topography used for its issue. | + | |process_evidence_description=A certificate of land use from the competent building agency, accompanied by the topographic diagram used to issue the certificate. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 88: |
Line 88: |
| | |process_evidence_submission_type=Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post) | | |process_evidence_submission_type=Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_description=Decision approving Environmental Terms (A.E.P.O.) | + | |process_evidence_description=Decision approving environmental conditions (AEPO). |
| | |process_evidence_related_process=Decision approving environmental conditions (DAEC) for sub-category A projects/activities | | |process_evidence_related_process=Decision approving environmental conditions (DAEC) for sub-category A projects/activities |
| − | |process_evidence_note=The justification is required where the size of the storage and distribution centre is such that it is classified in category A1 or A2 of the environmental classification as determined in accordance with the decision No. RIS/IFA/171851069 (VRB 841 2022). | + | |process_evidence_note=This supporting document is required when the size of the warehousing and distribution centre is such that it is classified under environmental classification category A1 or A2, as per Decision ΥΠΕΝ/ΔΙΠΑ/17185/1069 (Government Gazette, Series II, No 841/2022). |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
83c95437-591e-485f-ab78-b775096efc80
596318
Αδειοδότηση Εγκαταστάσεων Εφοδιαστικής (Κέντρα Αποθήκευσης και Διανομής)
At a glance
Points of service
Regional units, Directorate of Development of the relevant Regional Unit
Digital provision points
- The service is not provided digitally
Number of required documents
Description
This procedure concerns the licensing of logistics facilities (Storage and Distribution Centres), in accordance with the applicable institutional framework.
Basic information
Competent body
MINISTRY OF DEVELOPMENT
Authority/Public body’s Unit responsible for the institutional framework of the procedure
,
Service / organizational unit of a authority entity
Directorate of Development of the relevant Regional Unit
Application
Application Type
Application / Solemn Declaration
Submission by:
Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Title
Application for the
a) granting of establishment approval
b) notification of operation
Notes:
The application must be submitted together with the questionnaire set out in Annex II to Joint Ministerial Decision Φ.61/5542/72 concerning: ‘Defining the procedure for the establishment and operation of storage and distribution centres, in accordance with Article 48K of Law 4442/2016 (Government Gazette, Series I, No 230), and other related matters (Government Gazette, Series II, No 62/2018) to the Permitting Authority’.
What you will need
Means of authentication, identification and signature
Digital signature, Identification document, Identification with TAXISnet codes
Related
Means of redress or appeal:
Hierarchical appeal"Hierarchical appeal" is not in the list (Judicial redress, Hierarchical appeal/recourse, Administrative appeal, Other, Preliminary appeal, Appeal, Prior Hearing) of allowed values for the "Process sdg resource" property., Judicial appeal"Judicial appeal" is not in the list (Judicial redress, Hierarchical appeal/recourse, Administrative appeal, Other, Preliminary appeal, Appeal, Prior Hearing) of allowed values for the "Process sdg resource" property.
Output & Results
Output
Administrative Act
Other information
Alternative titles
Licensing of commercial warehouses, licensing of wholesale warehouses
Official title
Licensing of logistics facilities (storage and distribution centres)
Languages supported
Greek, English
Registries updated
Μητρώο γνωστοποιήσεων εγκατάστασης και λειτουργίας οικονομικών δραστηριοτήτων, άρθρο 14, ν. 4442/2016
Categories
Trigger
Applied for, Notification/Announcement
Trigger (submission method)
Application (handwritten), email
N1
ΔΔ
3
8
0
0
11
0
49073
No
693060
691860
Indefinite
Digital signature, Identification document, Identification with TAXISnet codes
471712, 604578
334329
5587
Supporting document
This procedure concerns the licensing of logistics facilities (Storage and Distribution Centres), in accordance with the applicable institutional framework.
200.00
5000.00
8
13
1
60 days
,,,,,,,,,
1
Possession of passwords to enter software
The Activity Code Number (KAD) holder submits a Notification of Operation via the notifybusiness app using their personal Taxisnet codes.
No
No
1
Administrative fees as per Decision οικ.14684/914/Φ.15 concerning ‘Determining the administrative fees of Article 28(4) of Law 3982/2011 and the remuneration of inspectors’ (Government Gazette, Series II, No 3533/2012)
200 € - 5000 €
Cost Calculation
One-off
Method of Payment
Bank cashier
Type of Cost
Administrative Fee (not provided by e-paravolo webpage)
No
1
Questionnaire of ANNEX II to Joint Ministerial Decision Φ.61/5542/72 on: ‘defining the procedure for the establishment and operation of storage and distribution centres, in accordance with Article 48K of Law 4442/2016 (Government Gazette, Series I, No 230), and other related matters’ (Government Gazette, Series II, No 62/2018)
Questionnaire
Questionnaire of ANNEX II to Joint Ministerial Decision Φ.61/5542/72 on: ‘defining the procedure for the establishment and operation of storage and distribution centres, in accordance with Article 48K of Law 4442/2016 (Government Gazette, Series I, No 230), and other related matters’ (Government Gazette, Series II, No 62/2018)
Submission by:
Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Notes:
The questionnaire also constitutes the application to the public administration.
Document submitted under requirements:
No
No
6947
2
A certificate of land use from the competent building agency, accompanied by the topographic diagram used to issue the certificate.
Certificate
A certificate of land use from the competent building agency, accompanied by the topographic diagram used to issue the certificate.
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Document submitted under requirements:
No
No
9703
3
Decision approving environmental conditions (AEPO).
Rule
Decision approving environmental conditions (AEPO).
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Relevant Procedure:
Decision approving environmental conditions (DAEC) for sub-category A projects/activities
Notes:
This supporting document is required when the size of the warehousing and distribution centre is such that it is classified under environmental classification category A1 or A2, as per Decision ΥΠΕΝ/ΔΙΠΑ/17185/1069 (Government Gazette, Series II, No 841/2022).
Document submitted under requirements:
Yes
Document’s requirement:
Environmental
No
1127
4
Decision setting environmental commitments standards
Rule
Decision setting environmental commitments standards
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Notes:
This justification is an alternative to GFCF where the size of the Storage and Distribution Centre is such that it is classified in category B of the environmental classification as determined by the decision No. YPEN/DIFA/17185-1069/2022 (B'841).
Document submitted under requirements:
Yes
Document’s requirement:
Environmental
Alternative document of:
3
Yes
1127
5
Summary Technical Description of Installations, signed by the legally responsible engineer
Drawings / studies by an engineer / architect
Summary Technical Description of Installations, signed by the legally responsible engineer
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Notes:
Summary Technical Description of Installations, signed by the legally responsible engineer, containing: * Topographic chart showing the buildings and the necessary marking information and traffic regulations within the property. * Activity description (type of stored goods, flow diagram of operations, etc.).
Document submitted under requirements:
No
No
5768
6
Responsible Statement by law engineer that the building has been built in accordance with its building permit and any arrangements and legalities thereof
Solemn Declaration
Responsible Statement by law engineer that the building has been built in accordance with its building permit and any arrangements and legalities thereof
Relevant link:
https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Persons
Relevant Procedure:
Solemn declaration and electronic solemn declaration
Notes:
When the Center for Storage and Distribution will operate in an existing building, a declaration competent under law to the effect that the building has been built in accordance with its building permit and any arrangements and the studies accompanying them, that it maintains static competence for its operation as a C.E.D., that no new building licence is required, settle or legalisation is required for its operation as a C.E.D. In the responsible Statement also the number of building permits, as well as the regularisation and legalisations. It is also established that: 1. the construction of the Centre for Storage and Distribution and the in-house buildings and electromechanical installations within it, as well as any specific installations thereof, have been implemented, in accordance with the drawings and technical reports accompanying the approval of the installation where available, 2. the static adequacy for the operation of the building as a C.D.A. is not required, as well as any specific installations of the C.D.D.
Document submitted under requirements:
Yes
Document’s requirement:
Urban planning
No
7320
7
Responsible Statement of Article 8 of Law 1599/1986, the designer of the establishment of a competent engineer, in which he is declared that he has been submitted to the department responsible for maintenance of the road(s) before the Centre for the Storage and Distribution, a technical study with the A.C. of the application, which fulfils all the legal requirements
Solemn Declaration
Responsible Statement of Article 8 of Law 1599/1986, the designer of the establishment of a competent engineer, in which he is declared that he has been submitted to the department responsible for maintenance of the road(s) before the Centre for the Storage and Distribution, a technical study with the A.C. of the application, which fulfils all the legal requirements
Relevant link:
https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Persons
Relevant Procedure:
Solemn declaration and electronic solemn declaration
Notes:
Responsible Statement of Article 8 of Law 1599/1986, the designer of the establishment of a competent mechanic, in which he is declared to have been submitted to the service responsible for maintenance of the road(s) in front of the Centre for Storage and Distribution, with the A.P., an application, which fulfils all the conditions for granting, (a) either an authorisation for discharging or subtracting the pedestrian-level, in accordance with the terms and conditions of paragraph 2 of Article 10 of Law No.4302/2014, in case the Centre for Storage and Distribution is requested to be established in an area outside an approved city, (b) an authorisation for a traffic connection under the terms and conditions of No. B. 465/1970, if the Centre for Storage and Distribution is requested to be established in an area outside an approved city and that country has an on-site or state-of-site connection with an area which is established in accordance with the requirements of Article 465/19.
Document submitted under requirements:
No
No
7320
8
Installation approval
Approval
Installation approval
Submission by:
Ex officio (manual), Keep within business establishment
Submitted by:
Civil servants
Notes:
The Storage and Distribution Centres, which, irrespective of the existence of mechanical equipment, are classified under subcategories A1 and A2 of Article 1 of Law 4014/2011 (A`209) and the delegated regulatory acts, require approval of an installation as defined in Chapter I of Law 4442/2016.
Document submitted under requirements:
No
No
8880
9
Building licence
Βuilding permit
Building licence
Submission by:
Keep within business establishment
Notes:
Building permit with all the studies and projects accompanying it, including any arrangements, arrangements or legitimisation of arbitrary structures as well as the relevant fine payment attestations.
Document submitted under requirements:
No
No
2243
10
Fire protection certificate
Fire safety certificate
Fire protection certificate
Submission by:
Keep within business establishment
Submitted by:
Persons
Notes:
Certificate (energy) of fire protection issued by the relevant Fire Service in accordance with No 13/2013 (B to 1586) Firefighting Order for the whole installation of the Save and Distribution Centre after the submission of the supporting documents in Annex IV to the CAR referred to in Annex IV
Document submitted under requirements:
No
No
8050
11
Approval of pedestrian-level decaying
Approval
Approval of pedestrian-level decaying
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Persons
Notes:
Approval of sanitary and pedestrian-level deposition by the person responsible for maintenance of the road (or roads) in front of the storage and distribution centre, Service, accompanied by a State responsible under law, that the traffic connection or exit of the plant was carried out in accordance with approved plans.
Document submitted under requirements:
No
No
8880
12
Adoption of a traffic connection
Approval
Adoption of a traffic connection
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Persons
Notes:
Adoption of a traffic connection by the road maintenance officer (or roads) in front of the storage and distribution centre, Service, together with a State responsible under the law of engineer that the traffic connection of the installation was carried out in accordance with approved plans.
Document submitted under requirements:
No
Alternative document of:
11
Yes
8880
13
Input – Output Approval
Approval
Input – Output Approval
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Persons
Notes:
Adoption of entry-out-out-out-of-road maintenance in front of the Storage and Distribution Centre, Service, accompanied by a State responsible under the law of engineer that the entry-out-out-in-in-in-in-in-according to approved plans was carried out.
Document submitted under requirements:
No
Alternative document of:
11
Yes
8880
14
Responsible Statement of delegation and withdrawal of supervision, operation and maintenance
Solemn Declaration
Responsible Statement of delegation and withdrawal of supervision, operation and maintenance
Relevant link:
https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Public bodies
Relevant Procedure:
Solemn declaration and electronic solemn declaration
Notes:
Responsible Statement of the award and withdrawal of supervision, operation and maintenance of the C.E.D. by the holder and the competent engineer, respectively, where the total driving power of the Centre for the Storage and Distribution exceeds 59 kW (80 HP) or maintenance contract for the main activities by the manufacturer with a responsibility for the proper operation of the infrastructure or insurance contract with an identical object.
Document submitted under requirements:
Yes
Document’s requirement:
Technical
No
7320
15
Licence to build a port project and use a sayalou and beach
Permit
Licence to build a port project and use a sayalou and beach
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Notes:
Licence to build a port project and use a sayalou and beach
Document submitted under requirements:
Yes
Document’s requirement:
Of Circumstance
No
4627
16
Hydraulic test certificate for steam boilers or steam generators of the installation as well as a receipt certificate
Certification
Hydraulic test certificate for steam boilers or steam generators of the installation as well as a receipt certificate
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Notes:
A plumbing certificate for the steam boilers or steam generators of the installation as well as a receipt certificate under the Ministerial Decision provided for in Article 14(3) of Law 3853/2010 (A’90), if required.
Document submitted under requirements:
Yes
Document’s requirement:
Technical
No
8619
17
Check certificate of entry into force of LPG tanks
Certification
Check certificate of entry into force of LPG tanks
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Notes:
Control certificate of entry into force of LPG tanks according to the HR D3/14858/1993 (LPD 477B/1993), Article 3.3.13 as applicable, if applicable.
Document submitted under requirements:
Yes
Document’s requirement:
Technical
No
8619
18
Water usage permit in case of use of water by drilling for craft use.
Permit
Water usage permit in case of use of water by drilling for craft use.
Document submitted under requirements:
Yes
Document’s requirement:
Technical
No
4627
19
Power generator’s licence
Permit
Power generator’s licence
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Notes:
Authorisation for power generator pairs in case of existence and/or use.
Document submitted under requirements:
Yes
Document’s requirement:
Technical
No
4627
20
Authorisation to use natural gas in case of use of natural gas
Permit
Authorisation to use natural gas in case of use of natural gas
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Notes:
If necessary.
Document submitted under requirements:
Yes
Document’s requirement:
Technical
No
4627
21
Approval of the competent Veterinary Directorate
Approval
Approval of the competent Veterinary Directorate
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Notes:
If necessary.
Document submitted under requirements:
Yes
Document’s requirement:
Technical
No
8880
22
Liquid fuels service authorisation for private use
Permit
Liquid fuels service authorisation for private use
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Notes:
Liquid fuels service licensed for the supply of motor vehicles with liquid fuels, in accordance with the provisions of B.D. 465/1970 (A'150) or D.C. 1224/1981 (A'303), as applicable in the installation.
Document submitted under requirements:
Yes
Document’s requirement:
Technical
No
4627
23
Liquid gas (LPG) or mixed LPG (LPG) and liquid fuels
Permit
Liquid gas (LPG) or mixed LPG (LPG) and liquid fuels
Submission by:
Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post)
Submitted by:
Legal entities, Persons
Relevant Procedure:
Authorisation for the operation of an LPG or mixed gas service station in case of concession of establishment
Notes:
LPG or mixed LPG and private liquid fuels licensed in accordance with the provisions of A.D. 595/1984 (A'214) as applicable.
Document submitted under requirements:
Yes
Document’s requirement:
Technical
No
4627
24
Gaseous or mixed pneumatic gas (CNG or LNG) service authorisation
Permit
No
4627
25
Operational Disclosure Proof
Notification
No
3140
Ministerial Decision
Φ.61/5542/72/2018
2018
62
Β
Law
4302/2014
2014
225
Α
Law
ΚΕΦΑΛΑΙΟ Ι
4442/2016
2016
230
Α
Law
159-164
4512
2018
5
Α
Law
19, 20,21, 22, 24,25,26,27,28
3982
2011
3982
Α
Law
22 παρ. 1,2 , 48 παρ.1, 2 και 99
4605
2019
52
Α
Description
To harmonize Greek legislation with Directive (EU) 2016/943 of the European Parliament and of the Council of 8 June 2016 on the protection of know-how and business information which has not been disclosed (commercial secrecy) from the illegal acquisition, use and disclosure of such information (OJ L 157, 15.6.2016) - Measures to speed up the work of the Ministry of Economy and Development and other provisions.
Legal references
https://www.et.gr/api/DownloadFeksApi/?fek pdf=20190100052
Law
59 παρ. 1 και 2
4609
2019
67
Α
Law
33 και 67
4712
2020
146
Α
Description
Market Control Unit, regulation of economic activity, treatment of illegal trade, fines for the trafficking and marketing of counterfeit/false products, regulation of issues for industry, private investment, public-private partnerships, research, innovation and the Hellenic Chamber of Economics and other provisions.
Legal references
https://www.et.gr/api/DownloadFeksApi/?fek pdf=20200100146
Law
28, 29, 69, 96
4796
2021
63
Α
Description
Simplify the framework for the exercise of economic activities of Ministries of Development and Investment, Work and Social Affairs, Maritime and Island Policy, Infrastructure and Transport, arrangements for the transfer to the Industrial Property Organisation of Trademarks responsibilities, other provisions for strengthening development and other urgent arrangements.
Legal references
https://www.et.gr/api/DownloadFeksApi/?fek pdf=20210100063
Ministerial Decision
Φ.61/οικ.696/1/2018
2018
18
Β
Ministerial Decision
79983/58/2017
2017
4103
Β
Description
Definitions of the modalities and modalities for the manufacture of inputs and costs, single or separate, including the terms for the abstraction and construction of a pedestrian route for storage and distribution centres established in areas within an approved city plan
Legal references
https://www.et.gr/api/DownloadFeksApi/?fek pdf=20170204103
1
Application received - Protocol
Responsible for Implementation
Competent Directorate
Μethod of Implementation
Manual Action
Description
The person concerned shall submit an application to the licensing authority of the CAR. This application shall include the completion of the questionnaire in Annex II to No F. 61/5542/72/2018 (B' 62).
Notes
The interested party granting the approval of the installation of the Storage and Distribution Centre (if required) or to submit an operating notification and to obtain documented information on the procedure and supporting documents shall submit to the Competent Authority a completed Questionnaire in Annex II.
No
No
2
Evaluation of Questionnaire data
Responsible for Implementation
Competent Directorate
Μethod of Implementation
Inspection
No
No
3
Reply of the Service on the Questionnaire
Responsible for Implementation
Competent Directorate
Μethod of Implementation
Manual Action
Description
Following the submission of the questionnaire, the interested party, either following the reply of the Competent Authority on the Questionnaire, or on its own responsibility, shall submit the supporting documents and dossiers (studies, drawings, etc.), to the Competent Authority and requesting the authorisation of an establishment by the Competent Authority (if required) or submit an Opening Communication.The Competent Authority shall, within seven (7) working days, submit the above questionnaire specifying the classification, nuance and supporting documents required by the Competent Authority referred to in Articles 3 and 7 of the Questionnaire (VEC B62/2018) to grant the authorisation and the functioning of the Centre for Storage and Distribution. Following the submission of the questionnaire, the person concerned shall, either following the reply of the Competent Authority to the Questionnaire, either on his or his own responsibility, submit the supporting documents and applications to the Competent Authority.
No
No
4
Installation approval and notification of operation is required
Responsible for Implementation
Competent Directorate
Μethod of Implementation
Manual Action
Description
This procedure shall apply where, after the reply of the service, approval of an installation and notification of an operation is established.
Yes
No
5
Concentration of supporting documents for the installation
Responsible for Implementation
Competent Directorate
Μethod of Implementation
Manual Action
Description
The supporting documents specified in step 3 shall be collected.
Yes
No
6
Approval of an installation
Responsible for Implementation
Deputy Regional Governor
Μethod of Implementation
Signature
Description
Within 60 days of the submission of the application and the necessary supporting documents, the issue of the approval of an installation should be completed.
Yes
No
7
Concentration of supporting documents for the operation
Responsible for Implementation
Competent Directorate
Μethod of Implementation
Manual Action
Description
The supporting documents specified in step 3 shall be collected.
Yes
No
8
Operational Notification Submission
Responsible for Implementation
Other
Μethod of Implementation
Software action
Description
At the gathering of the supporting documents, the CAR body shall submit an Operational Notice.
Notes
Submission of Operational Disclosure through the application of notify business (https://www.notify business.gov.gr/assets/index.html)
Yes
Yes
9
No installation approval is required and only operational notification is required
Description
This procedure shall be followed when it is determined after step 3 that no installation approval is required and only an operating notification is required.
Yes
No
10
Concentration of supporting documents for the operation
Responsible for Implementation
Other
Μethod of Implementation
Manual Action
Description
The supporting documents specified in step 3 shall be collected.
Yes
No
11
Operational Notification Submission
Responsible for Implementation
Other
Μethod of Implementation
Software action
Description
By gathering the supporting documents, the CAR body shall submit Operational Notice through the application of non-EU business (https://www.notifybusiness.gov.gr/assets/index.html).
Yes
Yes
Authorisation of Storage and Distribution Centres (K.A.D.)
Operation Notification