|
|
(5 intermediate revisions by 2 users not shown) |
Line 1: |
Line 1: |
| {{process | | {{process |
− | |process_uuid=f465c484-24b8-4c94-8842-55e387744025
| |
− | |process_id=290500
| |
| |process_official_title=Notification of Commencement of Operation of a Factory or Winery for the Manufacture of Concentrated Grape Must | | |process_official_title=Notification of Commencement of Operation of a Factory or Winery for the Manufacture of Concentrated Grape Must |
| |process_description=This procedure concerns the commencement of operation of a factory or winery for the manufacture of concentrated grape must by a natural or legal person. It is aimed at citizens, businesses and legal entities. | | |process_description=This procedure concerns the commencement of operation of a factory or winery for the manufacture of concentrated grape must by a natural or legal person. It is aimed at citizens, businesses and legal entities. |
| |process_org_owner_is_private=No | | |process_org_owner_is_private=No |
| |process_org_owner=49073 | | |process_org_owner=49073 |
− | |process_provision_org_owner_directory=604578, 471712 | + | |process_provision_org_owner_directory=471712, 604578 |
| |process_provision_org_group=9603 | | |process_provision_org_group=9603 |
| |process_provision_org_directory=Regional Directorates for Development | | |process_provision_org_directory=Regional Directorates for Development |
− | |process_estimated_implementation_duration=7200 | + | |process_estimated_implementation_duration_max=PT2H |
| |process_provided_language=English, Greek | | |process_provided_language=English, Greek |
| |process_border_provision=Establishment | | |process_border_provision=Establishment |
Line 20: |
Line 18: |
| |process_output_type=Digital document production | | |process_output_type=Digital document production |
| |process_source=Framers, SDG | | |process_source=Framers, SDG |
− | |process_provided_to=Businesses,Citizens,Legal Entities | + | |process_provided_to=Legal Entities,Food companies |
| |process_tax_type=Notifications | | |process_tax_type=Notifications |
| |process_life_events=Farming businesses | | |process_life_events=Farming businesses |
Line 28: |
Line 26: |
| |process_total_duration_steps_min=1 | | |process_total_duration_steps_min=1 |
| |process_total_duration_steps_max=1 | | |process_total_duration_steps_max=1 |
− | |process_total_duration_steps_digital_min=90000 | + | |process_total_duration_steps_digital_min=7200 |
− | |process_total_duration_steps_digital_max=435600 | + | |process_total_duration_steps_digital_max=7200 |
| |process_cost_min=300.00 | | |process_cost_min=300.00 |
| |process_cost_max=5100.00 | | |process_cost_max=5100.00 |
Line 47: |
Line 45: |
| |process_application_description=Νotification of commencement of operation of a factory or winery for the manufacture of concentrated grape must through the ‘notify business’ site. | | |process_application_description=Νotification of commencement of operation of a factory or winery for the manufacture of concentrated grape must through the ‘notify business’ site. |
| |process_application_related_url=https://notifybusiness.gov.gr/assets/index.html | | |process_application_related_url=https://notifybusiness.gov.gr/assets/index.html |
| + | |process_uuid=f465c484-24b8-4c94-8842-55e387744025 |
| + | |process_id=290500 |
| + | |process_estimated_implementation_duration=7200 |
| }} | | }} |
| {{process conditions | | {{process conditions |
Line 190: |
Line 191: |
| |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| |process_evidence_description=Solemn declaration of a legally competent engineer certifying the static adequacy and the industrial-craft use of the building, that no new building permit or regularisation or legalisation of the building installation is required, that the installation of the mechanical equipment took place in a main use area (not an auxiliary or shared one) and that it is in accordance with the technical description of the installation (previous supporting document), with explicit reference to the date of its stamping. | | |process_evidence_description=Solemn declaration of a legally competent engineer certifying the static adequacy and the industrial-craft use of the building, that no new building permit or regularisation or legalisation of the building installation is required, that the installation of the mechanical equipment took place in a main use area (not an auxiliary or shared one) and that it is in accordance with the technical description of the installation (previous supporting document), with explicit reference to the date of its stamping. |
− | |process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration | + | |process_evidence_related_process=Solemn declaration and electronic solemn declaration |
| |process_evidence_related_url=https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses | | |process_evidence_related_url=https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses |
| }} | | }} |
Line 213: |
Line 214: |
| {{process evidences | | {{process evidences |
| |process_evidence_num_id=7 | | |process_evidence_num_id=7 |
− | |process_evidence_type=7475 | + | |process_evidence_type=9102 |
| |process_evidence_is_under_prerequisite=Yes | | |process_evidence_is_under_prerequisite=Yes |
| |process_evidence_prerequisite=Environmental, Health, Technical, Urban planning | | |process_evidence_prerequisite=Environmental, Health, Technical, Urban planning |
Line 220: |
Line 221: |
| |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| |process_evidence_description=Special supporting documents (required on a case by case basis): | | |process_evidence_description=Special supporting documents (required on a case by case basis): |
| + | |
| - Solemn declaration of undertaking the supervision, operation and maintenance of the unit by its owner and the legally competent engineer respectively, when the total driving power of the unit exceeds 59 kW (80HP), or a maintenance contract of the mechanical equipment by the manufacturer assuming the responsibility of the operation of the mechanical equipment. | | - Solemn declaration of undertaking the supervision, operation and maintenance of the unit by its owner and the legally competent engineer respectively, when the total driving power of the unit exceeds 59 kW (80HP), or a maintenance contract of the mechanical equipment by the manufacturer assuming the responsibility of the operation of the mechanical equipment. |
| + | |
| - Fire Safety Certificate from the competent Fire Department in accordance with the joint ministerial decision F15/ oik.1589/ 104/2006 (B90), if required. If the unit includes an installation of liquid fuels or LPG for the operational needs of the units, the provisions of the joint ministerial decision of 28-6-1991 (GG 578B/ 1991) and the ministerial decision D3/ 14858/1993 (B 477) apply respectively. | | - Fire Safety Certificate from the competent Fire Department in accordance with the joint ministerial decision F15/ oik.1589/ 104/2006 (B90), if required. If the unit includes an installation of liquid fuels or LPG for the operational needs of the units, the provisions of the joint ministerial decision of 28-6-1991 (GG 578B/ 1991) and the ministerial decision D3/ 14858/1993 (B 477) apply respectively. |
| + | |
| - Valid certificate of control for the LPG tanks of the unit, according to the ministerial decision D3/ 14858/ 1993 (B 477), article 3.3.13, if required. | | - Valid certificate of control for the LPG tanks of the unit, according to the ministerial decision D3/ 14858/ 1993 (B 477), article 3.3.13, if required. |
| + | |
| - Valid acceptance certificate and control certificate for the boilers of the unit, according to articles 5 and 9 of the ministerial decision 10735/ 651/ 2012 (B 2656), if required. | | - Valid acceptance certificate and control certificate for the boilers of the unit, according to articles 5 and 9 of the ministerial decision 10735/ 651/ 2012 (B 2656), if required. |
| + | |
| - Water use permit, in case of use of water from a drilling for artisanal use, if required. | | - Water use permit, in case of use of water from a drilling for artisanal use, if required. |
| + | |
| - Solemn declaration according to the ministerial decision of paragraph 3 of article 3A of law 2244/1994 for the backup power generators of the unit, if required. | | - Solemn declaration according to the ministerial decision of paragraph 3 of article 3A of law 2244/1994 for the backup power generators of the unit, if required. |
| + | |
| - Authorisation to level or interrupt a section of sidewalk, or approval of traffic connection or approval of entry - exit by the competent Service for the maintenance of the road(s) in front of the unit, accompanied by a solemn declaration by a legally competent engineer that the traffic connection or entry-exit of the installation was performed according to the approved plans. | | - Authorisation to level or interrupt a section of sidewalk, or approval of traffic connection or approval of entry - exit by the competent Service for the maintenance of the road(s) in front of the unit, accompanied by a solemn declaration by a legally competent engineer that the traffic connection or entry-exit of the installation was performed according to the approved plans. |
| + | |
| - Licence to use natural gas, if required. | | - Licence to use natural gas, if required. |
| + | |
| - Authorisation for activities of processing food and other products of animal origin, pursuant to Regulations 853/ 2004 (L139) or 183/ 2005 (L35) or 1069/ 2009 (L300). | | - Authorisation for activities of processing food and other products of animal origin, pursuant to Regulations 853/ 2004 (L139) or 183/ 2005 (L35) or 1069/ 2009 (L300). |
| + | |
| - Permit for the construction of a port project and the use of the seashore and beach, if required. | | - Permit for the construction of a port project and the use of the seashore and beach, if required. |
| }} | | }} |
Line 320: |
Line 331: |
| |process_step_digital_implementation=Software action | | |process_step_digital_implementation=Software action |
| |process_step_digital_url=https://notifybusiness.gov.gr/assets/index.html | | |process_step_digital_url=https://notifybusiness.gov.gr/assets/index.html |
− | |process_step_digital_duration_min=3600 | + | |process_step_digital_duration_min=PT1H |
− | |process_step_digital_duration_max=3600 | + | |process_step_digital_duration_max=PT1H |
| |process_step_digital_description=Submission of notification in accordance with article 6 of Law 4442/2016, through the notifybusiness.gov.gr site. | | |process_step_digital_description=Submission of notification in accordance with article 6 of Law 4442/2016, through the notifybusiness.gov.gr site. |
| Each notification submitted automatically receives a document reference (“protocol”) number from the system, as well as a unique declaration number. | | Each notification submitted automatically receives a document reference (“protocol”) number from the system, as well as a unique declaration number. |
Line 333: |
Line 344: |
| |process_step_digital_official=Institutional software | | |process_step_digital_official=Institutional software |
| |process_step_digital_implementation=Data output from software | | |process_step_digital_implementation=Data output from software |
− | |process_step_digital_duration_min=86400 | + | |process_step_digital_duration_min=PT1H |
− | |process_step_digital_duration_max=432000 | + | |process_step_digital_duration_max=PT1H |
| |process_step_digital_description=Until the full activation of the accessibility of all involved authorities, the Development Directorate of the relevant Regional Unit is obliged to forward the notification within five (5) working days, as the case may be, to the competent Fire Service, Health Service, Chemical Service, Veterinary Authority, Water Directorate, Directorate of Agricultural Economy and Veterinary, service of the Labor Inspection Body, regional service of EFET, Building Service, Environmental Service, Surrounding Area, Surrounding Area Transport, and to any other authority at its discretion, in order for them to be informed of the start of operation and to be able to exercise the controls provided by law. | | |process_step_digital_description=Until the full activation of the accessibility of all involved authorities, the Development Directorate of the relevant Regional Unit is obliged to forward the notification within five (5) working days, as the case may be, to the competent Fire Service, Health Service, Chemical Service, Veterinary Authority, Water Directorate, Directorate of Agricultural Economy and Veterinary, service of the Labor Inspection Body, regional service of EFET, Building Service, Environmental Service, Surrounding Area, Surrounding Area Transport, and to any other authority at its discretion, in order for them to be informed of the start of operation and to be able to exercise the controls provided by law. |
| }} | | }} |