|
|
(4 intermediate revisions by 2 users not shown) |
Line 6: |
Line 6: |
| |process_org_owner_is_private=No | | |process_org_owner_is_private=No |
| |process_org_owner=33281 | | |process_org_owner=33281 |
− | |process_provision_org_owner_directory=DIRECTORATE-GENERAL OF TECHNICAL CONTROL AND ESTABLISHMENTS OF VEHICLES (D35)
| |
| |process_provision_org_group=5587 | | |process_provision_org_group=5587 |
− | |process_output_registries=Infrastructural and Electrical Market Operators’ Register
| |
| |process_remarks=The requisite supporting documents shall be submitted for approval to the relevant Regional Directorate for Transport and Communications, which is responsible for building maintenance and electromechanical installations of the terminal station car park or public passenger transit hub in question. | | |process_remarks=The requisite supporting documents shall be submitted for approval to the relevant Regional Directorate for Transport and Communications, which is responsible for building maintenance and electromechanical installations of the terminal station car park or public passenger transit hub in question. |
| With the issue of approval for the installation electric vehicle battery chargers, the relevant Regional Directorate of Transport and Communications shall notify the Technical Inspection and Vehicle Services Facilities Department at the General Directorate for Vehicles and Facilities of the Ministry of Infrastructure and Transport regarding the installation approval for the electric vehicle battery charger, as well as its technical characteristics and specific location. | | With the issue of approval for the installation electric vehicle battery chargers, the relevant Regional Directorate of Transport and Communications shall notify the Technical Inspection and Vehicle Services Facilities Department at the General Directorate for Vehicles and Facilities of the Ministry of Infrastructure and Transport regarding the installation approval for the electric vehicle battery charger, as well as its technical characteristics and specific location. |
| + | |process_estimated_implementation_duration=1296000 |
| |process_evidence_identification_type=Identification document | | |process_evidence_identification_type=Identification document |
| |process_type=Outgoing | | |process_type=Outgoing |
Line 24: |
Line 23: |
| |process_sdg_notes=Approval for the installation of the devices shall be granted within fifteen (15) working days from the date of submission of the relevant application. | | |process_sdg_notes=Approval for the installation of the devices shall be granted within fifteen (15) working days from the date of submission of the relevant application. |
| If a period of fifteen (15) working days elapses without notification of approval or rejection of the application from the licensing authority, the aforementioned requested change shall be deemed to have tacit approval and the interested party shall be considered to have proceeded lawfully with its installation and operation within its business enterprise, with no supplementary restriction. | | If a period of fifteen (15) working days elapses without notification of approval or rejection of the application from the licensing authority, the aforementioned requested change shall be deemed to have tacit approval and the interested party shall be considered to have proceeded lawfully with its installation and operation within its business enterprise, with no supplementary restriction. |
− | |process_total_duration_steps_min=604800 | + | |process_total_duration_steps_min=691200 |
| |process_total_duration_steps_max=1209600 | | |process_total_duration_steps_max=1209600 |
| |process_total_duration_steps_digital_min=0 | | |process_total_duration_steps_digital_min=0 |
− | |process_cost_min=0 | + | |process_cost_min=0.00 |
− | |process_cost_max=0 | + | |process_cost_max=0.00 |
| |process_evidence_cost_guarantee=0 | | |process_evidence_cost_guarantee=0 |
| |process_evidence_cost_total_number=0 | | |process_evidence_cost_total_number=0 |
Line 39: |
Line 38: |
| |process_application_type=Application | | |process_application_type=Application |
| |process_application_submission_type=Submitted by the applicant (in person or by post) | | |process_application_submission_type=Submitted by the applicant (in person or by post) |
− | |process_application_owner=Persons, Legal entities | + | |process_application_owner=Legal entities, Persons |
| |process_application_description=Application for the approval of an electric vehicle charging installation | | |process_application_description=Application for the approval of an electric vehicle charging installation |
− | |process_estimated_implementation_duration=1296000 | + | |process_estimated_implementation_duration_max=P15D |
| }} | | }} |
| {{process conditions | | {{process conditions |
Line 55: |
Line 54: |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
| |process_evidence_submission_type=Submitted by the applicant (in person or by post) | | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
− | |process_evidence_owner=Persons, Legal entities | + | |process_evidence_owner=Legal entities, Persons |
| |process_evidence_description=A floor plan, in four (4) copies, signed by the competent engineer, of appropriate scale depending on the size of the installation, which must show the other building and electromechanical installations of the parking facility as well as the installation locations of the electric vehicle battery chargers, in order to ensure their harmonious and safe joint presence in the same space as well as their simultaneous proper and combined operation. | | |process_evidence_description=A floor plan, in four (4) copies, signed by the competent engineer, of appropriate scale depending on the size of the installation, which must show the other building and electromechanical installations of the parking facility as well as the installation locations of the electric vehicle battery chargers, in order to ensure their harmonious and safe joint presence in the same space as well as their simultaneous proper and combined operation. |
| }} | | }} |
Line 64: |
Line 63: |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
| |process_evidence_submission_type=Submitted by the applicant (in person or by post) | | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
− | |process_evidence_owner=Persons, Legal entities | + | |process_evidence_owner=Legal entities, Persons |
| |process_evidence_description=An EU Declaration of Conformity from the electric vehicle battery charger manufacturer pursuant to Article 15 of Joint Ministerial Decision No 51157/ΔΤΒΝ1129/17-5-2016 ‘Adaptation of Greek legislation to Directive 2014/35/EU of the European Parliament and of the Council of 26 February 2014, on the harmonisation of the laws of the Member States relating to the making available on the market of electrical equipment designed for use within certain voltage limits’ (Government Gazette Series II No 1425). | | |process_evidence_description=An EU Declaration of Conformity from the electric vehicle battery charger manufacturer pursuant to Article 15 of Joint Ministerial Decision No 51157/ΔΤΒΝ1129/17-5-2016 ‘Adaptation of Greek legislation to Directive 2014/35/EU of the European Parliament and of the Council of 26 February 2014, on the harmonisation of the laws of the Member States relating to the making available on the market of electrical equipment designed for use within certain voltage limits’ (Government Gazette Series II No 1425). |
| }} | | }} |
Line 73: |
Line 72: |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
| |process_evidence_submission_type=Submitted by the applicant (in person or by post) | | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
− | |process_evidence_owner=Persons, Legal entities | + | |process_evidence_owner=Legal entities, Persons |
| |process_evidence_description=A solemn declaration from a licensed electrical installer, with Electrical Installation Delivery Report, and details of the Electrical Installation Inspection Protocol in accordance with ELOT HD 3 84, pursuant to the provisions of Ministerial Decision No Φ.50/503/168/19-3-2011 (Government Gazette Series II No 844), as in force, in the case of new or existing electrical installations. | | |process_evidence_description=A solemn declaration from a licensed electrical installer, with Electrical Installation Delivery Report, and details of the Electrical Installation Inspection Protocol in accordance with ELOT HD 3 84, pursuant to the provisions of Ministerial Decision No Φ.50/503/168/19-3-2011 (Government Gazette Series II No 844), as in force, in the case of new or existing electrical installations. |
− | |process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration | + | |process_evidence_related_process=Solemn declaration and electronic solemn declaration |
| |process_evidence_related_url=https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses | | |process_evidence_related_url=https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses |
| }} | | }} |
| {{process evidences | | {{process evidences |
| |process_evidence_num_id=4 | | |process_evidence_num_id=4 |
− | |process_evidence_type=6866 | + | |process_evidence_type=2244 |
| |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
| |process_evidence_submission_type=Submitted by the applicant (in person or by post) | | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
− | |process_evidence_owner=Persons, Legal entities | + | |process_evidence_owner=Legal entities, Persons |
| |process_evidence_description=Proof of notification to HEDNO SA of a photocopy of the supporting documentation ‘Solemn declaration by a licensed electrical installer, with Electrical Installation Delivery Report, and details of the Electrical Installation Suitability Inspection Protocol in accordance with ELOT HD 3 84, pursuant to the provisions of Ministerial Decision No Φ.50/503/168/19-3-2011, Government Gazette Series II No 844), as in force, in the case of new or existing electrical installations’. | | |process_evidence_description=Proof of notification to HEDNO SA of a photocopy of the supporting documentation ‘Solemn declaration by a licensed electrical installer, with Electrical Installation Delivery Report, and details of the Electrical Installation Suitability Inspection Protocol in accordance with ELOT HD 3 84, pursuant to the provisions of Ministerial Decision No Φ.50/503/168/19-3-2011, Government Gazette Series II No 844), as in force, in the case of new or existing electrical installations’. |
| }} | | }} |