Announcement of the Operation of A Private Centre for the Technical Inspection of Vehicles (CTIV)

From National Registry of Administrative Public Services



ba6701aa-465f-4e90-b997-59c63b4ca263 284644 Αναγγελία Λειτουργίας Ιδιωτικού Κέντρου Τεχνικού Ελέγχου Οχημάτων (ΙΚΤΕΟ)

At a glance

Points of service

Points of Single Contact (ΚΕΠ – EKE), Regional units, Regional Directorates for Transport and Communication

Digital provision points

Number of required documents

20 to 21

Fees

12,000 €

Deadline of completion

3 months

Description

This procedure concerns the announcement of the operation of a private Centre for the Technical Inspection of Vehicles. It refers to natural persons and legal entities.

Basic information

Competent body

Authority/Public body’s Unit responsible for the institutional framework of the procedure

ΔΙΕΥΘΥΝΣΗ ΤΕΧΝΙΚΟΥ ΕΛΕΓΧΟΥ ΚΑΙ ΕΓΚΑΤΑΣΤΑΣΕΩΝ ΕΞΥΠΗΡΕΤΗΣΗΣ ΟΧΗΜΑΤΩΝ

Authority responsible for the provision of the procedure

Service / organizational unit of a authority entity

Department of Technical Inspection of Vehicles

Related links


Last update

24/09/2025

Application




What you will need

    Print

    Requirements

      Fees

        Related

        Means of redress or appeal:

        Other administrative recourse


        Output & Results

        Output

        Document Production

        Steps

          Digital steps

            Other information

            Official title

            Announcement of the Operation of A Private Centre for the Technical Inspection of Vehicles (CTIV)

            Languages supported

            Greek, English

            Ways of provision

            Establishment

            Legislation

              Categories

              Τype of procedure

              Trigger

              Applied for

              Trigger (submission method)

              Application (digital)

              Type

              Outgoing

              End of Process

              Ιndefinite

              ,,


              Template:Process nace Template:Process sdg

            • 1 Possession of passwords to enter software The applicant shall have a TAXISnet username and password

              No No

            • 2 Administrative Submission of application – Solemn Declaration about the commencement of operation of the business

              No No

            • 3 Submission of the building permit prescribed in the institutional framework, and of the documents proving the ownership or possession of the plot used by the private CTIV.

              No No

            • 4 Applicants shall possess building, electromechanical and other installations in accordance with the requirements of the institutional framework.

              No No

            • 5 Technical They shall possess mechanical equipment in accordance with the requirements of the institutional framework.

              No No

            • 6 Technical They shall possess a fire safety system in accordance with the provisions in force.

              No No

            • 7 Technical They shall possess an IT system in accordance with the specifications of MD 24966/2840/2011

              No No

            • 8 Technical They shall possess a certification by an appropriately accredited body in accordance with Standard ISO 9001.

              No No

            • 1 Administrative Fee: For light vehicles, heave vehicles, and motocycles: 12.000€ For light and heavy vehicles: 10.000€ For light vehicles and motocycles: 8.000€ For light vehicles: 5.000€ For motocycles: 2.500€ For heave vehicles: 7.500€ 2500 € - 12000 €



              No

            • 1 Application – Solemn Declaration

              Application – Solemn Declaration

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Application"Application" is not a number.

            • 2 Receipt of payment of administrative fee

              Receipt of payment of administrative fee

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No

            • 3 For legal persons: Statutes and legalisation documents and data relative to the establishment of the company.

              For legal persons: Statutes and legalisation documents and data relative to the establishment of the company.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities



              No Legal documents from legal entities"Legal documents from legal entities" is not a number.

            • 4 For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: A Solemn Declaration of the Natural Person or of the legal representative of the Legal Person about the possession of the plot where the private CTIV will operate.

              For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: A Solemn Declaration of the Natural Person or of the legal representative of the Legal Person about the possession of the plot where the private CTIV will operate.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Solemn Declaration"Solemn Declaration" is not a number.

            • 5 For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: Copies of the ownership titles or of the leasing agreement

              For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: Copies of the ownership titles or of the leasing agreement

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Property titles"Property titles" is not a number.

            • 6 For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: Building permit, validated by the Urban Planning office about the connection of the property to the utility networks.

              For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: Building permit, validated by the Urban Planning office about the connection of the property to the utility networks.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Certificate from town planning"Certificate from town planning" is not a number.

            • 7 For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Land surveyor’s diagram of the area in triplicate, signed by an engineer and validated by the Urban Planning office. In place of the validation, an attestation from the Urban Planning office may be submitted.

              For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Land surveyor’s diagram of the area in triplicate, signed by an engineer and validated by the Urban Planning office. In place of the validation, an attestation from the Urban Planning office may be submitted.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.

            • 8 For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Approval of traffic connection or entrance-exit by the relevant Technical Service (where required)

              For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Approval of traffic connection or entrance-exit by the relevant Technical Service (where required)

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No

            • 9 For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: detailed technical description of the building facilities, in triplicate

              For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: detailed technical description of the building facilities, in triplicate

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.

            • 10 For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Plan of the general configuration of the private CTIV on a scale of 1:200 or 1:100

              For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Plan of the general configuration of the private CTIV on a scale of 1:200 or 1:100

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.

            • 11 For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Attestation by the competent service about the correct execution of the works for the entrance-exit traffic connection

              For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Attestation by the competent service about the correct execution of the works for the entrance-exit traffic connection

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Certificate"Certificate" is not a number.

            • 12 For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Floor plans of all levels of the private CTIV buildings with all the equipment and two characteristic sections of the buildings, in triplicate.

              For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Floor plans of all levels of the private CTIV buildings with all the equipment and two characteristic sections of the buildings, in triplicate.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.

            • 13 For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Technical description of the electromechanical installations of the private CTIV, in triplicate

              For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Technical description of the electromechanical installations of the private CTIV, in triplicate

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.

            • 14 For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Electromechanical studies and plans of the inspection building and the surrounding area, in triplicate

              For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Electromechanical studies and plans of the inspection building and the surrounding area, in triplicate

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.

            • 15 For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Study of the installation of automatic inspection lines and of the other equipment of the private CTIV, in triplicate, signed by the engineer in charge.

              For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Study of the installation of automatic inspection lines and of the other equipment of the private CTIV, in triplicate, signed by the engineer in charge.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.

            • 16 For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Study of noise level measurement for motorcycles and motorbikes, in triplicate, signed by the engineer in charge.

              For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Study of noise level measurement for motorcycles and motorbikes, in triplicate, signed by the engineer in charge.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.

            • 17 For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Solemn Declaration that the private CTIV was constructed in accordance with the building permit, the plans and other data that have been submitted.

              For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Solemn Declaration that the private CTIV was constructed in accordance with the building permit, the plans and other data that have been submitted.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Solemn Declaration"Solemn Declaration" is not a number.

            • 18 Fire safety certificate

              Fire safety certificate

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Certification"Certification" is not a number.

            • 19 Solemn declaration that the IT system of the private CTIV meets the required specifications.

              Solemn declaration that the IT system of the private CTIV meets the required specifications.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Solemn Declaration"Solemn Declaration" is not a number.

            • 20 Certificate of Quality Management System according to the ISO 9001 Standard.

              Certificate of Quality Management System according to the ISO 9001 Standard.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Certification"Certification" is not a number.

            • 21 Solemn declaration listing the appropriate staffing of the private CTIV.

              Solemn declaration listing the appropriate staffing of the private CTIV.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Solemn Declaration"Solemn Declaration" is not a number.

            • 22 Technical Inspection Card template to be approved.

              Technical Inspection Card template to be approved.

              Submission by: Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.

              Submitted by: Legal entities, Persons



              No Other"Other" is not a number.

            • Circular 27230/288 2012

              Description Εφαρμογή του ν. 3919/2011 στη διαδικασία λειτουργίας των Ι.Κ.Τ.Ε.Ο. Εγκύκλιος Υπουργείου Υποδομών και Μεταφορών, οικ.67157/708/6-9-2019, τροπ. εγκυκλίου 27230/288/2012 (προϋποθέσεις, διαδικασία)


            • Ministerial Decision 7,8 Φ.50/48597/585 2009 1975 Β

              Description Προϋποθέσεις , κτιριακές εγκαταστάσεις, προδιαγραφές, δικαιολογητικά) - Άρθρο 7 (άδεια ίδρυσης) - Άρθρο 8 (άδεια λειτουργίας) Τροποποιήσεις: - ΥΑ 516/58/2014, (ΦΕΚ 73/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά) - ΥΑ 64008/5839/2014, (ΦΕΚ 3102/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά) - ΥΑ 34449/4375/2013, (ΦΕΚ 1730/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά) - ΥΑ 28792/3638/2013, (ΦΕΚ 1454/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά) - ΥΑ 9860/1132/2012, (ΦΕΚ 1469/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά) - ΥΑ 8265/957/2011, (ΦΕΚ 247/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά)


            • Joint Ministerial Decision 16085Φ.700.1 2009 770 Β

              Description Προϋποθέσεις , δικαιολογητικά, πυρασφάλεια


            • Joint Ministerial Decision 51067/6222 2009 2108 Β

              Description Παράβολο Τροποποίηση: - ΚΥΑ Φ.50/67540/8283/2009, (ΦΕΚ 2467/Β), τροπ. ΥΑ ΚΥΑ 51067/6222/2009, (παράβολο)


            • Law 2963 2001 268 Α

              Description Προϋποθέσεις , διαδικασία, δικαιολογητικά Τροποποιήσεις: - Ν.4530/2018, (ΦΕΚ 59/Α), αρ. 54, τροπ. αρ. 34, Ν.2963/2001 (προϋποθέσεις) - Ν.4313/2014, (ΦΕΚ 261/Α), αρ. 21, τροπ. Ν. 3170/2008 αντικατάσταση αρ. 11 (ένταξη στις εγκαταστάσεις χαμηλής όχλησης) - Ν.4146/2013, (ΦΕΚ 90/Α), αρ. 64, τροπ. αρ. 37 Ν.2963/2001 (προϋποθέσεις) - Ν.4070/2012, (ΦΕΚ 82/Α), αρ. 185, τροπ. αρ. 37, Ν.2963/2001 (προϋποθέσεις) - Ν.3897/2010, (ΦΕΚ 208/Α), αρ. 5, τροπ.. αρ. 34, Ν.2963/2001, (προϋποθέσεις) και αρ. 36 (δικαιολογητικά) - Ν.3170/2008, (ΦΕΚ 216/Α), αρ.11, τροπ. αρ. 34, Ν.2963/2001, (ένταξη στις εγκαταστάσεις χαμηλής όχλησης) - Ν.3534/2007, (ΦΕΚ 40/Α), αρ. 16, παρ. 1, τροπ. αρ. 34, Ν.2963/2001, (προϋποθέσεις) και αρ. 36 (δικαιολογητικά) - Ν.3446/2006, (ΦΕΚ 49/Α), αρ. 24, τροπ. αρ. 33, Ν.2963/2001, (ορισμοί)


            • 1 Εκκίνηση διαδικασίας



              No No


            • 2 Υποβολή αίτησης

              Responsible for Implementation Other

              Μethod of Implementation Manual Action

              Description Ο ενδιαφερόμενος υποβάλλει, στο Πρωτόκολλο της Διεύθυνσης Μεταφορών και Επικοινωνιών της οικείας Περιφερειακής Ενότητας αίτηση - υπεύθυνη δήλωση αναγγελίας λειτουργίας ΙΚΤΕΟ συνοδευόμενη με όλα τα απαιτούμενα δικαιολογητικά.

              Yes No


            • 3 Ηλεκτρονική Υποβολή Αίτησης και Δικαιολογητικών


              Μethod of Implementation Software action


              Yes No


            • 4 Πρωτοκόλληση αίτησης

              Responsible for Implementation Competent Employee

              Μethod of Implementation Manual Action

              Description Ο υπάλληλος του Πρωτοκόλλου της Περιφερειακής Ενότητας παραλαμβάνει, πρωτοκολλεί την αίτηση και τη διαβιβάζει στο Τεχνικό Τμήμα.

              No No


            • 5 Έλεγχος πληρότητας και ορθότητας

              Responsible for Implementation Competent Employee

              Μethod of Implementation Manual Action

              Description Ο υπάλληλος του Τεχνικού Τμήματος ελέγχει την πληρότητα και την ορθότητα των δικαιολογητικών. Σε περίπτωση που εντοπιστούν ελλείψεις ενημερώνεται ο ενδιαφερόμενος για την ανάγκη προσκόμισης συμπληρωματικών στοιχείων.

              No No


            • 6 Ενημέρωση ενδιαφερόμενου για ελλειπή στοιχεία

              Responsible for Implementation Competent Employee

              Μethod of Implementation Manual Action

              Description Σε περίπτωση που δεν πληρούνται οι προϋποθέσεις χορήγησης της βεβαίωσης νόμιμης λειτουργίας ο αρμόδιος υπάλληλος συντάσσει και αποστέλλει στον ενδιαφερόμενο ενημερωτική επιστολή.

              No No


            • 7 Διαβίβαση αίτησης

              Responsible for Implementation Competent Employee

              Μethod of Implementation Manual Action

              Description Σε περίπτωση που πληρούνται οι προϋποθέσεις, η αίτηση διαβιβάζεται σε κλιμάκιο ελέγχου για τη διενέργεια αυτοψίας.

              No No


            • 8 Αυτοψία - Σύνταξη έκθεσης

              Responsible for Implementation Other

              Μethod of Implementation Check"Check" is not in the list (Software action, Signature, Manual Action, Digital signature, Action of the executive / co-competent body, Inspection, Citizen action) of allowed values for the "Process step implementation" property.

              Description Το κλιμάκιο ελέγχου διενεργεί αυτοψία και συντάσσει σχετική έκθεση, την οποία διαβιβάζει στο Τεχνικό Τμήμα.

              No No


            • 9 Έκθεση ελέγχου - Απόρριψη

              Responsible for Implementation Competent Employee

              Μethod of Implementation Manual Action

              Description Το Τεχνικό Τμήμα παραλαμβάνει την έκθεση ελέγχου. Σε περίπτωση απόρριψης αποστέλλεται στον ενδιαφερόμενο ενημερωτική επιστολή με τους λόγους απόρριψης.

              No No


            • 10 Σχέδιο απόφασης - Έγκριση

              Responsible for Implementation Competent Employee

              Μethod of Implementation Manual Action

              Description Σε περίπτωση έγκρισης συντάσσεται σχέδιο απόφασης και προωθείται προς υπογραφή από τον Προϊστάμενο του Τεχνικού Τμήματος

              No No


            • 11 Υπογραφή βεβαίωσης νόμιμης λειτουργίας

              Responsible for Implementation Responsible Head of Department

              Μethod of Implementation Signature

              Description Η βεβαίωση νόμιμης λειτουργίας υπογράφεται από τον Προϊστάμενο του Τμήματος και προωθείται προς υπογραφή στον Προϊστάμενο της Διεύθυνσης Μεταφορώνκαι Επικοινωνιών της Περιφερειακής Ενότητας.

              No No


            • 12 Υπογραφή βεβαίωσης νόμιμης λειτουργίας

              Responsible for Implementation Competent Director

              Μethod of Implementation Signature

              Description Η βεβαίωση νόμιμης λειτουργίας υπογράφεται από τον Προϊστάμενο της Διεύθυνσης Μεταφορών και Επικοινωνιών Περιφερειακής Ενότητας και προωθείται προς υπογραφή στον Αντιπεριφερειάρχη.

              No No


            • 13 Υπογραφή βεβαίωσης νόμιμης λειτουργίας

              Responsible for Implementation Other

              Μethod of Implementation Signature

              Description Η βεβαίωση νόμιμης λειτουργίας υπογράφεται από τον Αντιπεριφερειάρχη ή τον Προϊστάμενο της Διεύθυνσης Μεταφορών και Επικοινωνιών της Περιφέρειας και επιστρέφεται στο Τεχνικό Τμήμα.

              No No


            • 14 Αποστολή και κοινοποίηση βεβαίωσης

              Responsible for Implementation Competent Employee

              Μethod of Implementation Manual Action

              Description Ο υπάλληλος του αρμόδιου Τμήματος αποστέλλει /παραδίδει την βεβαίωση νόμιμης λειτουργίας στον ενδιαφερόμενο και την κοινοποιεί στις Διευθύνσεις Τεχνικού Ελέγχου Οχημάτων (Δ.Τ.Ε.Ο.), Οργάνωσης & Πληροφορικής (Δ.Ο.Π.) του Υπουργείου Υποδομών και Μεταφορών, καθώς και στην οικεία Αστυνομική Αρχή και Πυροσβεστική Υπηρεσία.

              No Yes