ba6701aa-465f-4e90-b997-59c63b4ca263
284644
Αναγγελία Λειτουργίας Ιδιωτικού Κέντρου Τεχνικού Ελέγχου Οχημάτων (ΙΚΤΕΟ)
At a glance
Points of service
Points of Single Contact (ΚΕΠ – EKE),
Regional units, Regional Directorates for Transport and Communication
Number of required documents
Description
This procedure concerns the announcement of the operation of a private Centre for the Technical Inspection of Vehicles. It refers to natural persons and legal entities.
Basic information
Authority/Public body’s Unit responsible for the institutional framework of the procedure
ΔΙΕΥΘΥΝΣΗ ΤΕΧΝΙΚΟΥ ΕΛΕΓΧΟΥ ΚΑΙ ΕΓΚΑΤΑΣΤΑΣΕΩΝ ΕΞΥΠΗΡΕΤΗΣΗΣ ΟΧΗΜΑΤΩΝ
Authority responsible for the provision of the procedure
Service / organizational unit of a authority entity
Department of Technical Inspection of Vehicles
Related
Means of redress or appeal:
Other
administrative recourse
Output & Results
Output
Document Production
Other information
Official title
Announcement of the Operation of A Private Centre for the Technical Inspection of Vehicles (CTIV)
Languages supported
Greek, English
Ways of provision
Establishment
Categories
Trigger (submission method)
Application (digital)
ΔΔ
3
0
0
0
7
1
Φορέας:MINISTRY OF INFRASTRUCTURE AND TRANSPORTATION"Φορέας:MINISTRY OF INFRASTRUCTURE AND TRANSPORTATION" is not a number.
No
3.5
3.5
ΔΙΕΥΘΥΝΣΗ ΤΕΧΝΙΚΟΥ ΕΛΕΓΧΟΥ ΚΑΙ ΕΓΚΑΤΑΣΤΑΣΕΩΝ ΕΞΥΠΗΡΕΤΗΣΗΣ ΟΧΗΜΑΤΩΝ"ΔΙΕΥΘΥΝΣΗ ΤΕΧΝΙΚΟΥ ΕΛΕΓΧΟΥ ΚΑΙ ΕΓΚΑΤΑΣΤΑΣΕΩΝ ΕΞΥΠΗΡΕΤΗΣΗΣ ΟΧΗΜΑΤΩΝ" is not a number.
MINISTRY OF INFRASTRUCTURE AND TRANSPORTATION"MINISTRY OF INFRASTRUCTURE AND TRANSPORTATION" is not a number.
Regional units"Regional units" is not a number.
EU-GO
Supporting document
This procedure concerns the announcement of the operation of a private Centre for the Technical Inspection of Vehicles
2500
12000
22
,,
Template:Process nace
Template:Process sdg
1
Possession of passwords to enter software
The applicant shall have a TAXISnet username and password
No
No
2
Administrative
Submission of application – Solemn Declaration about the commencement of operation of the business
No
No
3
Submission of the building permit prescribed in the institutional framework, and of the documents proving the ownership or possession of the plot used by the private CTIV.
No
No
4
Applicants shall possess building, electromechanical and other installations in accordance with the requirements of the institutional framework.
No
No
5
Technical
They shall possess mechanical equipment in accordance with the requirements of the institutional framework.
No
No
6
Technical
They shall possess a fire safety system in accordance with the provisions in force.
No
No
7
Technical
They shall possess an IT system in accordance with the specifications of MD 24966/2840/2011
No
No
8
Technical
They shall possess a certification by an appropriately accredited body in accordance with Standard ISO 9001.
No
No
1
Administrative Fee:
For light vehicles, heave vehicles, and motocycles: 12.000€
For light and heavy vehicles: 10.000€
For light vehicles and motocycles: 8.000€
For light vehicles: 5.000€
For motocycles: 2.500€
For heave vehicles: 7.500€
2500 € - 12000 €
No
1
Application – Solemn Declaration
Application – Solemn Declaration
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Application"Application" is not a number.
2
Receipt of payment of administrative fee
Receipt of payment of administrative fee
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
3
For legal persons: Statutes and legalisation documents and data relative to the establishment of the company.
For legal persons: Statutes and legalisation documents and data relative to the establishment of the company.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities
No
Legal documents from legal entities"Legal documents from legal entities" is not a number.
4
For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: A Solemn Declaration of the Natural Person or of the legal representative of the Legal Person about the possession of the plot where the private CTIV will operate.
For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: A Solemn Declaration of the Natural Person or of the legal representative of the Legal Person about the possession of the plot where the private CTIV will operate.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Solemn Declaration"Solemn Declaration" is not a number.
5
For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: Copies of the ownership titles or of the leasing agreement
For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: Copies of the ownership titles or of the leasing agreement
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Property titles"Property titles" is not a number.
6
For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: Building permit, validated by the Urban Planning office about the connection of the property to the utility networks.
For the building permit prescribed in accordance with the institutional framework, and the documents proving the ownership or possession of the plot for the private CTIV facilities: Building permit, validated by the Urban Planning office about the connection of the property to the utility networks.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Certificate from town planning"Certificate from town planning" is not a number.
7
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Land surveyor’s diagram of the area in triplicate, signed by an engineer and validated by the Urban Planning office. In place of the validation, an attestation from the Urban Planning office may be submitted.
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Land surveyor’s diagram of the area in triplicate, signed by an engineer and validated by the Urban Planning office. In place of the validation, an attestation from the Urban Planning office may be submitted.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.
8
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Approval of traffic connection or entrance-exit by the relevant Technical Service (where required)
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Approval of traffic connection or entrance-exit by the relevant Technical Service (where required)
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
9
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: detailed technical description of the building facilities, in triplicate
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: detailed technical description of the building facilities, in triplicate
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.
10
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Plan of the general configuration of the private CTIV on a scale of 1:200 or 1:100
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Plan of the general configuration of the private CTIV on a scale of 1:200 or 1:100
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.
11
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Attestation by the competent service about the correct execution of the works for the entrance-exit traffic connection
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Attestation by the competent service about the correct execution of the works for the entrance-exit traffic connection
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Certificate"Certificate" is not a number.
12
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Floor plans of all levels of the private CTIV buildings with all the equipment and two characteristic sections of the buildings, in triplicate.
For the possession of building, electromechanical and other installations in accordance with the requirements of the institutional framework: Floor plans of all levels of the private CTIV buildings with all the equipment and two characteristic sections of the buildings, in triplicate.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.
13
For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Technical description of the electromechanical installations of the private CTIV, in triplicate
For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Technical description of the electromechanical installations of the private CTIV, in triplicate
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.
14
For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Electromechanical studies and plans of the inspection building and the surrounding area, in triplicate
For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Electromechanical studies and plans of the inspection building and the surrounding area, in triplicate
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.
15
For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Study of the installation of automatic inspection lines and of the other equipment of the private CTIV, in triplicate, signed by the engineer in charge.
For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Study of the installation of automatic inspection lines and of the other equipment of the private CTIV, in triplicate, signed by the engineer in charge.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.
16
For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Study of noise level measurement for motorcycles and motorbikes, in triplicate, signed by the engineer in charge.
For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Study of noise level measurement for motorcycles and motorbikes, in triplicate, signed by the engineer in charge.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Drawings/studies by an engineer/architect"Drawings/studies by an engineer/architect" is not a number.
17
For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Solemn Declaration that the private CTIV was constructed in accordance with the building permit, the plans and other data that have been submitted.
For the possession of mechanical equipment in accordance with the requirements of the institutional framework: Solemn Declaration that the private CTIV was constructed in accordance with the building permit, the plans and other data that have been submitted.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Solemn Declaration"Solemn Declaration" is not a number.
18
Fire safety certificate
Fire safety certificate
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Certification"Certification" is not a number.
19
Solemn declaration that the IT system of the private CTIV meets the required specifications.
Solemn declaration that the IT system of the private CTIV meets the required specifications.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Solemn Declaration"Solemn Declaration" is not a number.
20
Certificate of Quality Management System according to the ISO 9001 Standard.
Certificate of Quality Management System according to the ISO 9001 Standard.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Certification"Certification" is not a number.
21
Solemn declaration listing the appropriate staffing of the private CTIV.
Solemn declaration listing the appropriate staffing of the private CTIV.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Solemn Declaration"Solemn Declaration" is not a number.
22
Technical Inspection Card template to be approved.
Technical Inspection Card template to be approved.
Submission by:
Submitted by the applicant (manual)"Submitted by the applicant (manual)" is not in the list (Ex officio (manual), Ex officio (digital), Presented by the applicant, Submitted by the applicant (digital), Keep within business establishment, Presented by the applicant (email), Submitted by the applicant (in person or by post), Demonstration via gov.gr Wallet, Submitted by the applicant (by courier only), Submitted by the applicant (in person)) of allowed values for the "Process evidence submission type" property.
Submitted by:
Legal entities, Persons
No
Other"Other" is not a number.
Circular
27230/288
2012
Description
Εφαρμογή του ν. 3919/2011 στη διαδικασία λειτουργίας των Ι.Κ.Τ.Ε.Ο.
Εγκύκλιος Υπουργείου Υποδομών και Μεταφορών, οικ.67157/708/6-9-2019, τροπ. εγκυκλίου 27230/288/2012 (προϋποθέσεις, διαδικασία)
Ministerial Decision
7,8
Φ.50/48597/585
2009
1975
Β
Description
Προϋποθέσεις , κτιριακές εγκαταστάσεις, προδιαγραφές, δικαιολογητικά)
- Άρθρο 7 (άδεια ίδρυσης)
- Άρθρο 8 (άδεια λειτουργίας)
Τροποποιήσεις:
- ΥΑ 516/58/2014, (ΦΕΚ 73/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά)
- ΥΑ 64008/5839/2014, (ΦΕΚ 3102/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά)
- ΥΑ 34449/4375/2013, (ΦΕΚ 1730/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά)
- ΥΑ 28792/3638/2013, (ΦΕΚ 1454/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά)
- ΥΑ 9860/1132/2012, (ΦΕΚ 1469/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά)
- ΥΑ 8265/957/2011, (ΦΕΚ 247/Β), τροπ. ΥΑ Φ.50/48597/585/2009, (προϋποθέσεις, δικαιολογητικά)
Joint Ministerial Decision
16085Φ.700.1
2009
770
Β
Description
Προϋποθέσεις , δικαιολογητικά, πυρασφάλεια
Joint Ministerial Decision
51067/6222
2009
2108
Β
Description
Παράβολο
Τροποποίηση:
- ΚΥΑ Φ.50/67540/8283/2009, (ΦΕΚ 2467/Β), τροπ. ΥΑ ΚΥΑ 51067/6222/2009, (παράβολο)
Law
2963
2001
268
Α
Description
Προϋποθέσεις , διαδικασία, δικαιολογητικά
Τροποποιήσεις:
- Ν.4530/2018, (ΦΕΚ 59/Α), αρ. 54, τροπ. αρ. 34, Ν.2963/2001 (προϋποθέσεις)
- Ν.4313/2014, (ΦΕΚ 261/Α), αρ. 21, τροπ. Ν. 3170/2008 αντικατάσταση αρ. 11 (ένταξη στις εγκαταστάσεις χαμηλής όχλησης)
- Ν.4146/2013, (ΦΕΚ 90/Α), αρ. 64, τροπ. αρ. 37 Ν.2963/2001 (προϋποθέσεις)
- Ν.4070/2012, (ΦΕΚ 82/Α), αρ. 185, τροπ. αρ. 37, Ν.2963/2001 (προϋποθέσεις)
- Ν.3897/2010, (ΦΕΚ 208/Α), αρ. 5, τροπ.. αρ. 34, Ν.2963/2001, (προϋποθέσεις) και αρ. 36 (δικαιολογητικά)
- Ν.3170/2008, (ΦΕΚ 216/Α), αρ.11, τροπ. αρ. 34, Ν.2963/2001, (ένταξη στις εγκαταστάσεις χαμηλής όχλησης)
- Ν.3534/2007, (ΦΕΚ 40/Α), αρ. 16, παρ. 1, τροπ. αρ. 34, Ν.2963/2001, (προϋποθέσεις) και αρ. 36 (δικαιολογητικά)
- Ν.3446/2006, (ΦΕΚ 49/Α), αρ. 24, τροπ. αρ. 33, Ν.2963/2001, (ορισμοί)
1
Εκκίνηση διαδικασίας
No
No
2
Υποβολή αίτησης
Responsible for Implementation
Other
Μethod of Implementation
Manual Action
Description
Ο ενδιαφερόμενος υποβάλλει, στο Πρωτόκολλο της Διεύθυνσης Μεταφορών και Επικοινωνιών της οικείας Περιφερειακής Ενότητας αίτηση - υπεύθυνη δήλωση αναγγελίας λειτουργίας ΙΚΤΕΟ συνοδευόμενη με όλα τα απαιτούμενα δικαιολογητικά.
Yes
No
3
Ηλεκτρονική Υποβολή Αίτησης και Δικαιολογητικών
Μethod of Implementation
Software action
Yes
No
4
Πρωτοκόλληση αίτησης
Responsible for Implementation
Competent Employee
Μethod of Implementation
Manual Action
Description
Ο υπάλληλος του Πρωτοκόλλου της Περιφερειακής Ενότητας παραλαμβάνει, πρωτοκολλεί την αίτηση και τη διαβιβάζει στο Τεχνικό Τμήμα.
No
No
5
Έλεγχος πληρότητας και ορθότητας
Responsible for Implementation
Competent Employee
Μethod of Implementation
Manual Action
Description
Ο υπάλληλος του Τεχνικού Τμήματος ελέγχει την πληρότητα και την ορθότητα των δικαιολογητικών. Σε περίπτωση που εντοπιστούν ελλείψεις ενημερώνεται ο ενδιαφερόμενος για την ανάγκη προσκόμισης συμπληρωματικών στοιχείων.
No
No
6
Ενημέρωση ενδιαφερόμενου για ελλειπή στοιχεία
Responsible for Implementation
Competent Employee
Μethod of Implementation
Manual Action
Description
Σε περίπτωση που δεν πληρούνται οι προϋποθέσεις χορήγησης της βεβαίωσης νόμιμης λειτουργίας ο αρμόδιος υπάλληλος συντάσσει και αποστέλλει στον ενδιαφερόμενο ενημερωτική επιστολή.
No
No
7
Διαβίβαση αίτησης
Responsible for Implementation
Competent Employee
Μethod of Implementation
Manual Action
Description
Σε περίπτωση που πληρούνται οι προϋποθέσεις, η αίτηση διαβιβάζεται σε κλιμάκιο ελέγχου για τη διενέργεια αυτοψίας.
No
No
8
Αυτοψία - Σύνταξη έκθεσης
Responsible for Implementation
Other
Μethod of Implementation
Check"Check" is not in the list (Software action, Signature, Manual Action, Digital signature, Action of the executive / co-competent body, Inspection, Citizen action) of allowed values for the "Process step implementation" property.
Description
Το κλιμάκιο ελέγχου διενεργεί αυτοψία και συντάσσει σχετική έκθεση, την οποία διαβιβάζει στο Τεχνικό Τμήμα.
No
No
9
Έκθεση ελέγχου - Απόρριψη
Responsible for Implementation
Competent Employee
Μethod of Implementation
Manual Action
Description
Το Τεχνικό Τμήμα παραλαμβάνει την έκθεση ελέγχου. Σε περίπτωση απόρριψης αποστέλλεται στον ενδιαφερόμενο ενημερωτική επιστολή με τους λόγους απόρριψης.
No
No
10
Σχέδιο απόφασης - Έγκριση
Responsible for Implementation
Competent Employee
Μethod of Implementation
Manual Action
Description
Σε περίπτωση έγκρισης συντάσσεται σχέδιο απόφασης και προωθείται προς υπογραφή από τον Προϊστάμενο του Τεχνικού Τμήματος
No
No
11
Υπογραφή βεβαίωσης νόμιμης λειτουργίας
Responsible for Implementation
Responsible Head of Department
Μethod of Implementation
Signature
Description
Η βεβαίωση νόμιμης λειτουργίας υπογράφεται από τον Προϊστάμενο του Τμήματος και προωθείται προς υπογραφή στον Προϊστάμενο της Διεύθυνσης Μεταφορώνκαι Επικοινωνιών της Περιφερειακής Ενότητας.
No
No
12
Υπογραφή βεβαίωσης νόμιμης λειτουργίας
Responsible for Implementation
Competent Director
Μethod of Implementation
Signature
Description
Η βεβαίωση νόμιμης λειτουργίας υπογράφεται από τον Προϊστάμενο της Διεύθυνσης Μεταφορών και Επικοινωνιών Περιφερειακής Ενότητας και προωθείται προς υπογραφή στον Αντιπεριφερειάρχη.
No
No
13
Υπογραφή βεβαίωσης νόμιμης λειτουργίας
Responsible for Implementation
Other
Μethod of Implementation
Signature
Description
Η βεβαίωση νόμιμης λειτουργίας υπογράφεται από τον Αντιπεριφερειάρχη ή τον Προϊστάμενο της Διεύθυνσης Μεταφορών και Επικοινωνιών της Περιφέρειας και επιστρέφεται στο Τεχνικό Τμήμα.
No
No
14
Αποστολή και κοινοποίηση βεβαίωσης
Responsible for Implementation
Competent Employee
Μethod of Implementation
Manual Action
Description
Ο υπάλληλος του αρμόδιου Τμήματος αποστέλλει /παραδίδει την βεβαίωση νόμιμης λειτουργίας στον ενδιαφερόμενο και την κοινοποιεί στις Διευθύνσεις Τεχνικού Ελέγχου Οχημάτων (Δ.Τ.Ε.Ο.), Οργάνωσης & Πληροφορικής (Δ.Ο.Π.) του Υπουργείου Υποδομών και Μεταφορών, καθώς και στην οικεία Αστυνομική Αρχή και Πυροσβεστική Υπηρεσία.
No
Yes
Cookies help us deliver our services. By using our services, you agree to our use of cookies.