| Line 4: |
Line 4: |
| | |process_org_owner_is_private=No | | |process_org_owner_is_private=No |
| | |process_org_owner=21847 | | |process_org_owner=21847 |
| − | |process_provision_org_owner_directory=718665, 875157 | + | |process_provision_org_owner_directory=875157, 718665 |
| | |process_provision_org_group=8210 | | |process_provision_org_group=8210 |
| | |process_provision_org_directory=DIRECTORATE-GENERAL OF AVIATION ACTIVITIES DIRECTORATE FOR THE SUPERVISION OF AIR NAVIGATION AND AIRPORTS | | |process_provision_org_directory=DIRECTORATE-GENERAL OF AVIATION ACTIVITIES DIRECTORATE FOR THE SUPERVISION OF AIR NAVIGATION AND AIRPORTS |
| Line 346: |
Line 346: |
| | |process_step_exit=No | | |process_step_exit=No |
| | |process_step_child=No | | |process_step_child=No |
| − | |process_step_title=Receipt of application and Processing | + | |process_step_title=Receipt and processing of application |
| | |process_step_official=Competent Department | | |process_step_official=Competent Department |
| | |process_step_implementation=Manual Action | | |process_step_implementation=Manual Action |
| | |process_step_duration_min=P1M | | |process_step_duration_min=P1M |
| | |process_step_duration_max=P2M | | |process_step_duration_max=P2M |
| − | |process_step_description=Receive an application and initial processing of the application; check that all the supporting documents provided for in the application have been submitted. | + | |process_step_description=Receipt and initial processing of the application. Verification that all required supporting documents for the application have been submitted. |
| | }} | | }} |
| | {{process steps | | {{process steps |
| Line 357: |
Line 357: |
| | |process_step_exit=No | | |process_step_exit=No |
| | |process_step_child=No | | |process_step_child=No |
| − | |process_step_title=Question to OHIM and OHIM | + | |process_step_title=Request to the Hellenic National Defence General Staff and the Hellenic Civil Aviation Authority |
| | |process_step_official=Competent Department | | |process_step_official=Competent Department |
| | |process_step_implementation=Manual Action | | |process_step_implementation=Manual Action |
| | |process_step_duration_min=P1M | | |process_step_duration_min=P1M |
| | |process_step_duration_max=P2M | | |process_step_duration_max=P2M |
| − | |process_step_description=A question is drawn up in HRM and HRM for their assent. | + | |process_step_description=Drafting a request to the Hellenic National Defence General Staff and the Hellenic Civil Aviation Authority for their respective approvals. |
| − | |process_step_note=Ref. provision A.D. 19/2009 Art. 6(1) and (4) | + | |process_step_note=Pursuant to Presidential Decree 19/2009, Article 6(1) and Article 4 |
| | }} | | }} |
| | {{process steps | | {{process steps |
| Line 369: |
Line 369: |
| | |process_step_exit=No | | |process_step_exit=No |
| | |process_step_child=No | | |process_step_child=No |
| − | |process_step_title=Verification of the adequacy principle following autopsy | + | |process_step_title=Issuance of a preliminary suitability determination following an on-site inspection |
| | |process_step_official=Competent General Director | | |process_step_official=Competent General Director |
| | |process_step_implementation=Signature | | |process_step_implementation=Signature |
| | |process_step_duration_min=P1M | | |process_step_duration_min=P1M |
| | |process_step_duration_max=P2M | | |process_step_duration_max=P2M |
| − | |process_step_description=It performs autopsy at the site to determine the possibility to build a helical. Version of the adequacy principle. Art. 6(2) B.D. 19/2009. | + | |process_step_description=Conducting an on-site inspection to assess the feasibility of constructing a heliport. Issuance of a preliminary suitability determination. Article 6(2) of Presidential Decree 19/2009. |
| | }} | | }} |
| | {{process steps | | {{process steps |
| Line 380: |
Line 380: |
| | |process_step_exit=No | | |process_step_exit=No |
| | |process_step_child=No | | |process_step_child=No |
| − | |process_step_title=Submission of further supporting documents by the party concerned | + | |process_step_title=Submission of further supporting documents by the applicant |
| | |process_step_official=Action by a natural/legal person | | |process_step_official=Action by a natural/legal person |
| | |process_step_implementation=Manual Action | | |process_step_implementation=Manual Action |
| | |process_step_duration_min=P1M | | |process_step_duration_min=P1M |
| | |process_step_duration_max=P2M | | |process_step_duration_max=P2M |
| − | |process_step_description=(b) detailed, recent topographic chart of the designated area dependant on the national network, scale 1:500 in a range of two hundred and fifty metres (250) of capacity, from the point of reference of the helico to one metre, and altitudes from the mean sea level, in which the physical characteristics and approaches of the helical are captured, the other required facilities and geographical coordinates of the landing and take-off point of the helicitor point (f) and/or the WGS system (fourth Reporting System) in accordance with the correctness of the land and of the eligible areas of use (fourth Reporting System) in accordance with the relevant State aid rules and/or the relevant State aid rules. | + | |process_step_description=In order for the application to be further reviewed, the applicant is required to submit the following supporting documents: |
| | + | a) proof that the required land for the construction of a heliport has been secured. The plot of land must be clearly identified, owned by the applicant, granted to the applicant or leased to the applicant; these legal circumstances must be evidenced by dated documents; |
| | + | b) a detailed recent topographic plan of the designated site, referenced to the National Grid, at a scale of 1:500 and covering a radius of two hundred and fifty (250) metres from the heliport reference point, with contour lines at one-metre intervals and elevations referenced to Mean Sea Level, showing the natural features and approach paths of the heliport, the other required facilities and infrastructure, and the geographic coordinates of the centre of the helicopter landing and take-off area in latitude and longitude (WGS 84 reference system, with an accuracy of one second of arc) and in x and y (ΗΑΤΤ and EGSA ’87 reference systems), together with the elevation above Mean Sea Level; |
| | + | c) certificate issued by the competent urban planning authority, forestry authority or Ephorate of Antiquities concerning land use and the classification of the area, respectively; |
| | + | d) a decision on the approval of environmental conditions, issued pursuant to the provisions of Articles 3 and 4 of Law 1650/1986 (Government Gazette, Series I, No 160/1986), as amended by Law 3010/2002 (Government Gazette, Series I, No 91/2002), or a declaration of the SECs, as applicable; |
| | + | e) detailed designs for infrastructure works, building facilities, electromechanical equipment, and other planned installations. The studies referred to in this subparagraph only (4b) shall be submitted for the purpose of verifying their compatibility with the requirements of the Hellenic Civil Aviation Authority. |
| | }} | | }} |
| | {{process steps | | {{process steps |
| Line 391: |
Line 396: |
| | |process_step_exit=No | | |process_step_exit=No |
| | |process_step_child=No | | |process_step_child=No |
| − | |process_step_title=Issue of space suitability certificate | + | |process_step_title=Issuance of a Certificate of Site Suitability |
| | |process_step_official=Competent General Director | | |process_step_official=Competent General Director |
| | |process_step_implementation=Signature | | |process_step_implementation=Signature |
| | |process_step_duration_min=P1M | | |process_step_duration_min=P1M |
| | |process_step_duration_max=P3M | | |process_step_duration_max=P3M |
| − | |process_step_description=Issue of space suitability certificate for the construction of a helical. | + | |process_step_description=Issuance of a Certificate of Site Suitability for the construction of a heliport. |
| − | |process_step_note=The certificate has two years since its issue and concerns the licence for the construction of the helical. Pursuant to Art. 6(4) B.D. 19/2009 | + | |process_step_note=The certificate is valid for two years from the date of issuance and pertains to the heliport construction licence. |
| | + | Pursuant to Article 6(4) of Presidential Decree 19/2009 |
| | }} | | }} |
| | {{process steps | | {{process steps |
| Line 403: |
Line 409: |
| | |process_step_exit=No | | |process_step_exit=No |
| | |process_step_child=No | | |process_step_child=No |
| − | |process_step_title=Final control of the helical | + | |process_step_title=Final inspection of the heliport |
| | |process_step_official=Rank of executives | | |process_step_official=Rank of executives |
| | |process_step_implementation=Inspection | | |process_step_implementation=Inspection |
| | |process_step_duration_min=P1D | | |process_step_duration_min=P1D |
| | |process_step_duration_max=P2D | | |process_step_duration_max=P2D |
| − | |process_step_description=Final control of the helical after the completion of the work. | + | |process_step_description=Final inspection of the heliport following the completion of its construction. Pursuant to Article 10 of Presidential Decree 19/2009. |
| | }} | | }} |
| | {{process steps | | {{process steps |
| Line 414: |
Line 420: |
| | |process_step_exit=Yes | | |process_step_exit=Yes |
| | |process_step_child=No | | |process_step_child=No |
| − | |process_step_title=Issue of an authorisation to establish and operate a helical | + | |process_step_title=Issuance of a licence for setting up and operating a heliport |
| | |process_step_official=Competent General Director | | |process_step_official=Competent General Director |
| | |process_step_implementation=Signature | | |process_step_implementation=Signature |
| | |process_step_duration_min=P1M | | |process_step_duration_min=P1M |
| | |process_step_duration_max=P2M | | |process_step_duration_max=P2M |
| − | |process_step_description=Authentication of a helical installation and operation permit. | + | |process_step_description=Issuance of a licence for setting up and operating a heliport. |
| − | |process_step_note=Following the successful construction of the helical and completion of all the earlier stages, the decision to set up and operate the helical is adopted by the Civil Aviation Authority. | + | |process_step_note=Following the successful construction of the heliport and the completion of all the preceding stages, the Hellenic Civil Aviation Authority issues the Decision on setting up and operating the heliport. Pursuant to Article 11 of Presidential Decree 19/2009 |
| | }} | | }} |