|
|
| Line 3: |
Line 3: |
| | |process_alternative_titles=Announcement of commencement of operation of Truck Stations, for loading and unloading of goods, Type A, without Fuel Pumps, including the Announcement of Change/Amendment of these Facilities. | | |process_alternative_titles=Announcement of commencement of operation of Truck Stations, for loading and unloading of goods, Type A, without Fuel Pumps, including the Announcement of Change/Amendment of these Facilities. |
| | Certificate of legal operation of truck stations for the loading and unloading of goods (Car Freight Stations) without the installation of fuel pumps. | | Certificate of legal operation of truck stations for the loading and unloading of goods (Car Freight Stations) without the installation of fuel pumps. |
| − | |process_description=The procedure concerns the announcement of the commencement of operations of truck stations for loading-unloading goods or for temporary storage of goods, of type A (with a usable surface from 250 sq.m. to 800 sq.m. as defined in Article 9 (par. 3.1) of Law 79/2004, without installation of fuel pumps, as well as the announcement of possible changes/modifications of these installations. Through these procedures, the Certificate of Lawful Operation is issued (Circular No. 13929/929/11.3.2014), provided that all legal requirements are met. | + | |process_description=The procedure concerns the announcement of operation of truck stations for loading-unloading goods or for temporary storage of goods, of type A (with a usable surface from 250 sq.m. to 800 sq.m. as defined in Article 9 (par. 3.1) of Law 79/2004, without installation of fuel pumps, as well as the announcement of possible changes/modifications of these installations. Through these procedures, the Certificate of Lawful Operation is issued (Circular No. 13929/929/11.3.2014), provided that all legal requirements are met. |
| | |process_org_owner_is_private=No | | |process_org_owner_is_private=No |
| | |process_org_owner=33281 | | |process_org_owner=33281 |
| | |process_provision_org_owner_directory=164608 | | |process_provision_org_owner_directory=164608 |
| − | |process_provision_org_group=7135, 5587 | + | |process_provision_org_group=5587, 7135 |
| | |process_provision_org_directory=Transport and Communications Services of the relevant Regional Unit. | | |process_provision_org_directory=Transport and Communications Services of the relevant Regional Unit. |
| | |process_remarks=The operation of these stations is subject to the confirmation of a statutory operation (as defined in Circular No. 13929/11.3.2014 for the announcement of commencement of service facilities in accordance with the provisions of Law 3919/2011), provided that all legal conditions are met. | | |process_remarks=The operation of these stations is subject to the confirmation of a statutory operation (as defined in Circular No. 13929/11.3.2014 for the announcement of commencement of service facilities in accordance with the provisions of Law 3919/2011), provided that all legal conditions are met. |
| Line 102: |
Line 102: |
| | |process_evidence_submission_type=Submitted by the applicant (in person or by post) | | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_description=The topographical chart of the area, on two copies, on a scale of 1:500, considered by the relevant urban service, as regards the permissible use of the station and the conditions of construction by the relevant urban service, showing the existing uses in a zone of 100 metres (m) perimeter of the station's plot or field. | + | |process_evidence_description=The topographical chart of the area, in two copies, on a scale of 1:500, validated by the relevant urban planning service, as regards the permissible use of the station and the conditions of construction by the relevant urban service, showing the existing uses in a zone of 100 metres (m) perimeter of the stations plot or field. |
| − | |process_evidence_note=If the station operates in an area outside an approved city plan, on a national or provincial road, the topography must be considered by the relevant Office of the relevant P.E. with the observation that the conditions and conditions for the approval of the traffic connection of the station to the road are met, in accordance with the conditions of Article 24 of the P.E. 465/1970, as applicable. | + | |process_evidence_note=If the station operates in an area outside an approved city plan, on a national or provincial road, the topography must be considered by the relevant Office of the relevant Regional Unit with the observation that the terms and conditions for the approval of the traffic connection of the station to the road are met, in accordance with the conditions of Article 24 of R.D. 465/1970, as applicable. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 112: |
Line 112: |
| | |process_evidence_submission_type=Submitted by the applicant (in person or by post) | | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_description=Approval of the traffic connection of the station | + | |process_evidence_description=Approval of the traffic connection of the station. |
| − | |process_evidence_note=In accordance with Article 11 (c) and 15 (c) of d.d. 795/2004 (A 62), if the station is established in an area outside an approved town plan, its traffic connection with national or district routes shall be constructed in accordance with the terms and conditions of number 465/1970 bd., as applicable. In the case of stations established in areas within an approved town plan, its traffic connection shall be formed in accordance with Article 11 (cf. 2 and 3), of d.d. 79/2004 (A’62), as applicable. | + | |process_evidence_note=In accordance with Article 11 (c) and 15 (c) of PD 795/2004 (A 62), if the station is established in an area outside an approved town plan, its traffic connection with national or district routes shall be constructed in accordance with the terms and conditions of RD 465/1970 , as applicable. |
| | + | In the case of stations established in areas within an approved town plan, its traffic connection shall be formed in accordance with Article 11 (cf. 2 and 3), of RD 79/2004 (A’62), as applicable. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 122: |
Line 123: |
| | |process_evidence_submission_type=Submitted by the applicant (in person or by post) | | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_description=Documentary consent to the correct construction of the approved traffic connection | + | |process_evidence_description=Written consent to the proper construction of the approved traffic connection. |
| − | |process_evidence_note=Written consent shall be obtained by means of a declaration by the responsible engineer. | + | |process_evidence_note=The written consent shall be obtained by means of a solemn declaration by the competent engineer. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 133: |
Line 134: |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_description=Architectural drawings in two copies | | |process_evidence_description=Architectural drawings in two copies |
| − | |process_evidence_note=The architectural designs relate to: (a) all the levels of the premises or buildings which make up the Station (i.e. office, cargo and luggage warehouses, any washing room); (b) indicative sections of the above buildings. (c) Main aspects of the above buildings. (d) General layout plan of all the building facilities of the Station, showing the entrances to the Station, access corridors, docks, parking areas and generally the whole operating layout of the Station. | + | |process_evidence_note=The architectural drawings relate to: |
| | + | (a) plan views of all levels and sites or buildings which make up the Station (i.e. office, cargo and luggage warehouses, any washing room); |
| | + | (b) indicative sections of the above buildings. |
| | + | (c) Main aspects of the above buildings. |
| | + | (d) General layout plan of all the building facilities of the Station, showing the entrances to the Station, access corridors, docks, parking areas and generally the whole operating layout of the Station. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 143: |
Line 148: |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_description=Electrical drawings in two copies | | |process_evidence_description=Electrical drawings in two copies |
| − | |process_evidence_note=The electromechanical (E/M) relates to: I. Complete electrical designs of buildings, with tables, cables, switches, flowors, microphone installations (if provided) which are accompanied by a complete technical description and specific computation issue. | + | |process_evidence_note=The electromechanical (E/M) relates to: |
| | + | I. Complete electrical designs of buildings, with tables, cables, switches, power supply, microphone installations (if provided) which are accompanied by a complete technical description and specific computation issue. |
| | + | II. Complete ventilation drawings of the warehouse area accompanied by a full technical description and a separate calculation booklet. |
| | + | III. A complete electrical lighting plan of the surrounding area of the station, including the construction details of the cable routing, the laying of the lighting columns on the ground or the fixing of the luminaires to walls, any manholes and connecting mounds, accompanied by a full technical description and a separate set of calculations. |
| | + | IV. A complete water supply and sewerage drawing of the surrounding area, showing the respective networks and their route, the water companys meter, the location of the connection of the sewerage network to the city network, any necessary waste collectors, septic tanks, cesspools or watertight tanks and/or biological treatment. This plan shall include the same or be accompanied by detailed drawings of the manholes, pipes, water supplies and waste collectors. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 162: |
Line 171: |
| | |process_evidence_submission_type=Submitted by the applicant (in person or by post) | | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_description=General technical report of the engineer on two copies | + | |process_evidence_description=General technical report of the engineer ιn two copies. |
| − | |process_evidence_note=The Engineer's General Technical Report aims to identify the design auditor for the plant structure, the type to which it belongs, the key elements taken into account in the design, the basic components of the buildings and summarize the corresponding electromechanical installations. If the plant has laundry and/or lubricants, then the Report includes the corresponding chapters, as defined in Section 6 of the MODEL III of No 13929/929/11.3.2014 of the Circular. The facilities with washing machines and/or lubricants must have the corresponding Operating Disclosure and comply with the terms and conditions of the Ministerial Decision No 56926/23 (Guideline B/23/1023). | + | |process_evidence_note=The Engineers General Technical Report aims to identify the design auditor for the plant structure, the type to which it belongs, the key elements taken into account in the design, the basic components of the buildings and summarize the corresponding electromechanical installations. If the plant has a washing machine and/or lubricants, then the Report includes the corresponding chapters, as defined in Section 6 of the MODEL III of circular oik.13929/929/11.3.2014. The facilities with washing machines and/or lubricants must have the corresponding Operating Disclosure and comply with the terms and conditions of the Ministerial Decision No 56926/23 (Guideline B/23/1023). |
| | }} | | }} |
| | {{process evidences | | {{process evidences |