(4 intermediate revisions by the same user not shown) |
Line 1: |
Line 1: |
| {{process | | {{process |
| |process_official_title=Interim (active) fire protection certificate | | |process_official_title=Interim (active) fire protection certificate |
− | |process_alternative_titles=Issue of a temporary (active) fire protection certificate | + | |process_alternative_titles=Issue of a temporary (active) fire protection certificate, Issue of a temporary fire safety certificate, Issue of a temporary fire safety certificate |
− | Issue of a temporary fire safety certificate, Issue of a temporary fire safety certificate | |
| |process_description=The procedure concerns the issue of a temporary (active) fire protection certificate. | | |process_description=The procedure concerns the issue of a temporary (active) fire protection certificate. |
| |process_org_owner_is_private=No | | |process_org_owner_is_private=No |
Line 11: |
Line 10: |
| *b) fall within the scope of Article 1(2.1) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but for which deviations from the passive fire protection study description have been identified, which affect aspects of the active fire protection study (Annex B). | | *b) fall within the scope of Article 1(2.1) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but for which deviations from the passive fire protection study description have been identified, which affect aspects of the active fire protection study (Annex B). |
| *c) fall within the scope of Article 1(2.2) and (2.3) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but which have not fully implemented their obligations with regard to integrated structural fire protection features. | | *c) fall within the scope of Article 1(2.2) and (2.3) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but which have not fully implemented their obligations with regard to integrated structural fire protection features. |
− | *Unless otherwise stipulated by fire department or special fire protection provisions, the duration of the temporary (active) fire protection certificate may not exceed six (6) months.
| + | |
− | *Undertakings and facilities that have already been granted a temporary (active) fire protection certificate do not have the right to seek reissue.
| + | Unless otherwise stipulated by fire department or special fire protection provisions, the duration of the temporary (active) fire protection certificate may not exceed six (6) months. |
− | *A prerequisite for the granting of a temporary (active) fire protection certificate is completion of the remaining fire protection measures and the installation of equipment provided for in the respective study. This certificate shall also specify any additional or increased fire protection measures and equipment required by the fire department and the deadlines by which they must be completed.
| + | |
− | *As of entry into force of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), paragraph 63 of Joint Ministerial Decision No 3021/19/6/1986 ‘Limitation of certificates and other supporting documents required by the current provisions for the processing of citizens’ cases by public sector services’ is no longer applicable (Government Gazette, Series II, No 847).
| + | Undertakings and facilities that have already been granted a temporary (active) fire protection certificate do not have the right to seek reissue. |
| + | |
| + | A prerequisite for the granting of a temporary (active) fire protection certificate is completion of the remaining fire protection measures and the installation of equipment provided for in the respective study. This certificate shall also specify any additional or increased fire protection measures and equipment required by the fire department and the deadlines by which they must be completed. |
| + | |
| + | As of entry into force of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), paragraph 63 of Joint Ministerial Decision No 3021/19/6/1986 ‘Limitation of certificates and other supporting documents required by the current provisions for the processing of citizens’ cases by public sector services’ is no longer applicable (Government Gazette, Series II, No 847). |
| |process_deadline_duration=P50D | | |process_deadline_duration=P50D |
| |process_evidence_identification_type=Other | | |process_evidence_identification_type=Other |
Line 25: |
Line 28: |
| |process_validity_duration_set=Defined | | |process_validity_duration_set=Defined |
| |process_validity_duration=P6M | | |process_validity_duration=P6M |
− | |process_source=EU-GO (support), gov.gr
| |
| |process_provided_to=Engineers | | |process_provided_to=Engineers |
| |process_tax_type=Approvals,Audits,Notifications | | |process_tax_type=Approvals,Audits,Notifications |
− | |process_life_events=Business establishment and operation,Operation of gas and energy stations,Operation of repair and maintenance services for motor vehicles,Operation of vehicle service establishments,Retail trade - Wholesale,Pharmacy operation,Pharmacy operation | + | |process_life_events=Licences and compliance,Liberal professions,Health professionals |
| |process_sdg_notes=To revoke, amend or cancel the administrative act, the interested party may submit an application for remedy by administrative appeal, in accordance with the provisions of Article 24 of Law 2690/1999 (Government Gazette, Series I, No 45), as currently in force. The issuance of temporary (active) fire protection certificates and other administrative fire protection acts are governed by Law 2690/1999. | | |process_sdg_notes=To revoke, amend or cancel the administrative act, the interested party may submit an application for remedy by administrative appeal, in accordance with the provisions of Article 24 of Law 2690/1999 (Government Gazette, Series I, No 45), as currently in force. The issuance of temporary (active) fire protection certificates and other administrative fire protection acts are governed by Law 2690/1999. |
| |process_total_duration_steps_min=180 | | |process_total_duration_steps_min=180 |
Line 44: |
Line 46: |
| |process_evidence_step_total_number=0 | | |process_evidence_step_total_number=0 |
| |process_evidence_step_digital_total_number=0 | | |process_evidence_step_digital_total_number=0 |
| + | |process_source=EU-GO (support), gov.gr |
| + | |process_govgr_codes=16870 |
| + | |process_govgr_full_info=16870 |
| |process_application_type=Application | | |process_application_type=Application |
| |process_application_submission_type=Submitted by the applicant (digital) | | |process_application_submission_type=Submitted by the applicant (digital) |
Line 204: |
Line 209: |
| {{process evidences | | {{process evidences |
| |process_evidence_num_id=6 | | |process_evidence_num_id=6 |
− | |process_evidence_type=6866 | + | |process_evidence_type=7320 |
| |process_evidence_is_under_prerequisite=Yes | | |process_evidence_is_under_prerequisite=Yes |
| |process_evidence_prerequisite=Technical, Use | | |process_evidence_prerequisite=Technical, Use |
Line 211: |
Line 216: |
| |process_evidence_owner=Persons | | |process_evidence_owner=Persons |
| |process_evidence_description=Copy of a sworn declaration submitted to the ‘E-Licences’ information system to obtain issue of a building permit, or to the information system for the processing of declarations for unauthorised buildings, or a hard copy from the printout file of the competent building service indicating the proper execution of plans for a category I, II or III LPG installation, in accordance with Article 3(3.1.2.4) of Joint Ministerial Decision 31856/2003 (Government Gazette, Series II, No 1257). | | |process_evidence_description=Copy of a sworn declaration submitted to the ‘E-Licences’ information system to obtain issue of a building permit, or to the information system for the processing of declarations for unauthorised buildings, or a hard copy from the printout file of the competent building service indicating the proper execution of plans for a category I, II or III LPG installation, in accordance with Article 3(3.1.2.4) of Joint Ministerial Decision 31856/2003 (Government Gazette, Series II, No 1257). |
| + | |process_evidence_related_process=Solemn declaration and electronic solemn declaration |
| + | |process_evidence_related_url=https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses |
| |process_evidence_note=supporting document (required in certain cases) as per Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) for the issue of a temporary (active) fire protection certificate with or without on-site inspection. | | |process_evidence_note=supporting document (required in certain cases) as per Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) for the issue of a temporary (active) fire protection certificate with or without on-site inspection. |
| FOOTNOTES: | | FOOTNOTES: |
Line 370: |
Line 377: |
| |process_step_description=Where the result of the on-the-spot check of the establishment by the designated verifier is unnecessarily or remarks, then the Head of the Office or the Local Branch of Preventive and Repressive Fire Safety Department shall approve in total the application ‘Edition of a temporary certificate of (active) fire protection’ and issue it by selecting a ‘Prevention’ which acquires a unique electronic key. | | |process_step_description=Where the result of the on-the-spot check of the establishment by the designated verifier is unnecessarily or remarks, then the Head of the Office or the Local Branch of Preventive and Repressive Fire Safety Department shall approve in total the application ‘Edition of a temporary certificate of (active) fire protection’ and issue it by selecting a ‘Prevention’ which acquires a unique electronic key. |
| |process_step_note=Co-ordinator: TECHNICAL CONTACT: https://web.tee.gr/e-adeies/egkriseis-py/ | | |process_step_note=Co-ordinator: TECHNICAL CONTACT: https://web.tee.gr/e-adeies/egkriseis-py/ |
− | }}
| |
− | {{process provision digital locations
| |
− | |process_provision_digital_location_title=(Active) fire protection approvals and certificates (e-adeies)
| |
− | |process_provision_digital_location_url=https://www.gov.gr/en/ipiresies/epikheirematike-drasterioteta/adeiodoteseis-kai-summorphose/egkriseis-kai-pistopoietika-energetikes-puroprostasias-e-adeies
| |
| }} | | }} |
| {{process useful links | | {{process useful links |