|
|
(6 intermediate revisions by 2 users not shown) |
Line 7: |
Line 7: |
| |process_org_owner=33281 | | |process_org_owner=33281 |
| |process_provision_org_owner_directory=164608 | | |process_provision_org_owner_directory=164608 |
− | |process_provision_org_group=5587, 7135 | + | |process_provision_org_group=5587, 7135, 7135, 5587 |
| |process_provision_org_directory=Transport and Communications Services of the relevant Regional Unit. | | |process_provision_org_directory=Transport and Communications Services of the relevant Regional Unit. |
| |process_remarks=The operation of these stations is subject to the confirmation of a statutory operation (as defined in Circular No. 13929/11.3.2014 for the announcement of commencement of service facilities in accordance with the provisions of Law 3919/2011), provided that all legal conditions are met. | | |process_remarks=The operation of these stations is subject to the confirmation of a statutory operation (as defined in Circular No. 13929/11.3.2014 for the announcement of commencement of service facilities in accordance with the provisions of Law 3919/2011), provided that all legal conditions are met. |
Line 20: |
Line 20: |
| |process_usage=Supporting document | | |process_usage=Supporting document |
| |process_output_type=Administrative Act | | |process_output_type=Administrative Act |
− | |process_source=EU-GO, Framers, SDG | + | |process_source=EU-GO |
− | |process_provided_to=Businesses,Citizens,Legal Entities | + | |process_provided_to=Businesses |
| |process_tax_type=Announcements,Certificates | | |process_tax_type=Announcements,Certificates |
− | |process_life_events=Licences and compliance,Transport | + | |process_life_events=Licences and compliance |
| |process_sdg_resource=Other | | |process_sdg_resource=Other |
| |process_sdg_resource_other=Special administrative appeals - Applications for treatment (Article 227 of Law 3852/2010) | | |process_sdg_resource_other=Special administrative appeals - Applications for treatment (Article 227 of Law 3852/2010) |
Line 97: |
Line 97: |
| {{process evidences | | {{process evidences |
| |process_evidence_num_id=1 | | |process_evidence_num_id=1 |
− | |process_evidence_type=5768 | + | |process_evidence_type=6851 |
| |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
Line 128: |
Line 128: |
| {{process evidences | | {{process evidences |
| |process_evidence_num_id=4 | | |process_evidence_num_id=4 |
− | |process_evidence_type=5768 | + | |process_evidence_type=3879 |
| |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
Line 135: |
Line 135: |
| |process_evidence_description=Architectural drawings in two copies | | |process_evidence_description=Architectural drawings in two copies |
| |process_evidence_note=The architectural drawings relate to: | | |process_evidence_note=The architectural drawings relate to: |
− | (a) plan views of all levels and sites or buildings which make up the Station (i.e. office, cargo and luggage warehouses, any washing room); | + | |
− | (b) indicative sections of the above buildings. | + | *(a) plan views of all levels and sites or buildings which make up the Station (i.e. office, cargo and luggage warehouses, any washing room); |
− | (c) Main aspects of the above buildings. | + | *(b) indicative sections of the above buildings. |
− | (d) General layout plan of all the building facilities of the Station, showing the entrances to the Station, access corridors, docks, parking areas and generally the whole operating layout of the Station. | + | *(c) Main aspects of the above buildings. |
| + | *(d) General layout plan of all the building facilities of the Station, showing the entrances to the Station, access corridors, docks, parking areas and generally the whole operating layout of the Station. |
| }} | | }} |
| {{process evidences | | {{process evidences |
Line 149: |
Line 150: |
| |process_evidence_description=Electrical drawings in two copies | | |process_evidence_description=Electrical drawings in two copies |
| |process_evidence_note=The electromechanical (E/M) relates to: | | |process_evidence_note=The electromechanical (E/M) relates to: |
− | I. Complete electrical designs of buildings, with tables, cables, switches, power supply, microphone installations (if provided) which are accompanied by a complete technical description and specific computation issue. | + | *I. Complete electrical designs of buildings, with tables, cables, switches, power supply, microphone installations (if provided) which are accompanied by a complete technical description and specific computation issue. |
− | II. Complete ventilation drawings of the warehouse area accompanied by a full technical description and a separate calculation booklet. | + | *II. Complete ventilation drawings of the warehouse area accompanied by a full technical description and a separate calculation booklet. |
− | III. A complete electrical lighting plan of the surrounding area of the station, including the construction details of the cable routing, the laying of the lighting columns on the ground or the fixing of the luminaires to walls, any manholes and connecting mounds, accompanied by a full technical description and a separate set of calculations. | + | *III. A complete electrical lighting plan of the surrounding area of the station, including the construction details of the cable routing, the laying of the lighting columns on the ground or the fixing of the luminaires to walls, any manholes and connecting mounds, accompanied by a full technical description and a separate set of calculations. |
− | IV. A complete water supply and sewerage drawing of the surrounding area, showing the respective networks and their route, the water companys meter, the location of the connection of the sewerage network to the city network, any necessary waste collectors, septic tanks, cesspools or watertight tanks and/or biological treatment. This plan shall include the same or be accompanied by detailed drawings of the manholes, pipes, water supplies and waste collectors. | + | *IV. A complete water supply and sewerage drawing of the surrounding area, showing the respective networks and their route, the water companys meter, the location of the connection of the sewerage network to the city network, any necessary waste collectors, septic tanks, cesspools or watertight tanks and/or biological treatment. This plan shall include the same or be accompanied by detailed drawings of the manholes, pipes, water supplies and waste collectors. |
| }} | | }} |
| {{process evidences | | {{process evidences |
Line 186: |
Line 187: |
| {{process evidences | | {{process evidences |
| |process_evidence_num_id=9 | | |process_evidence_num_id=9 |
− | |process_evidence_type=8619 | + | |process_evidence_type=8050 |
| |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| |process_evidence_alternative=No | | |process_evidence_alternative=No |
Line 202: |
Line 203: |
| |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| |process_evidence_description=Solemn Declaration of the overseeing engineer. | | |process_evidence_description=Solemn Declaration of the overseeing engineer. |
− | |process_evidence_related_process=265882
| |
| |process_evidence_note=In the Head of Statement, the engineer states that ‘the construction of the plant and the electromechanical installations were carried out in accordance with the approved designs and technical regulations and that the conditions and limitations of d.d. 79/2004 have been complied with when the work was supervised’. | | |process_evidence_note=In the Head of Statement, the engineer states that ‘the construction of the plant and the electromechanical installations were carried out in accordance with the approved designs and technical regulations and that the conditions and limitations of d.d. 79/2004 have been complied with when the work was supervised’. |
| }} | | }} |
Line 427: |
Line 427: |
| |process_step_implementation=Manual Action | | |process_step_implementation=Manual Action |
| |process_step_description=After the approval of the requested implemented changes and/or facilities, a new Certificate of Lawful Operation is issued, if after the examination and control of the above documents, it is established that all the terms and conditions of activity provided by the legislation in force for their approval are met. | | |process_step_description=After the approval of the requested implemented changes and/or facilities, a new Certificate of Lawful Operation is issued, if after the examination and control of the above documents, it is established that all the terms and conditions of activity provided by the legislation in force for their approval are met. |
− | }}
| |
− | {{process provision digital locations
| |
− | |process_provision_digital_location_title=EUGO portal (only information)
| |
− | |process_provision_digital_location_url=https://eugo.gov.gr/en/services/146dd407-1967-4726-88e3-9e99dcc2b798/
| |
| }} | | }} |
| {{process useful links | | {{process useful links |