2cd9a12b-24bd-450f-b114-726c0a2ba98d
980523
Γνωστοποίηση Έναρξης Λειτουργίας Εργαστηρίου Εμφιάλωσης Οίνων και Αρωματισμένων Οίνων
At a glance
Points of service
Regions
Number of required documents
Estimated Time (digitally)
Description
This procedure concerns the commencement of operation of a workshop for bottling wines and aromatised wines by a natural or a legal person. It is aimed at citizens, businesses and legal entities.
Basic information
Competent body
MINISTRY OF DEVELOPMENT
Authority/Public body’s Unit responsible for the institutional framework of the procedure
,
Application
Application Type
Notification/Announcement
Submission by:
Submitted by the applicant (digital)
Submitted by:
Legal entities, Persons
Title
Notification of Commencement of operation of a workshop for bottling wines and aromatised wines through the ‘notify business’ website
What you will need
Means of authentication, identification and signature
Identification with TAXISnet codes
Related
Means of redress or appeal:
Other
Not applicable to notifications
Rules concerning a lack of reply from the competent authority and the legal consequences for the use:
NACE
- 11.02 Manufacture of wine from grape
Output & Results
Output
Document Production
Other information
Official title
Notification of Commencement of Operation of a Workshop for Bottling Wines and Aromatised Wines
Languages supported
English, Greek
Ways of provision
Establishment
Categories
Trigger
Notification/Announcement
Trigger (submission method)
Application (digital)
N1
ΔΔ
0
1
0
49073
No
1
1
Identification with TAXISnet codes
471712, 364812
11.02
9603
Framers, SDG
Supporting document
This procedure concerns the commencement of operation of a workshop for bottling wines and aromatised wines by a natural or a legal person. It is aimed at citizens, businesses and legal entities.
300.00
5100.00
4
2
0
}}
}}
2 hours}}
1 hour
1 hour
,
1
Company law
Business formation (individual, corporate)
- For company establishment see the link below
No
No
2
Possession of passwords to enter software
The applicant shall have a TAXISnet username and password.
No
No
3
Administrative
During the operation of the activity, the operator shall keep on-site at the installation a file with the required updated documents, to be pre-sented to the competent authorities
No
No
1
Fee in favor of the State (the proof of payment is being kept on-site at the installation in the relevant file).
100 €
Cost Calculation
One-off
Method of Payment
Bank cashier, Digital (web banking)
Type of Cost
Administrative Fee (not provided by e-paravolo webpage)
No
2
For the submission of the notification, the deposit of an administrative fee of 100€ is required and an administrative fee of an amount equal to 30% of the administrative fee for the authorisation of the installation.
Administrative fees for granting an installation authorisation:
i. For activities requiring mechanical equipment of a value up to three hundred thousand (300.000) euros and installed power up to 200 KW, an administrative fee of two hundred (200) euros shall be paid.
ii. For activities requiring mechanical equipment of a value up to six hundred thousand (600.000) euros and installed power up to 400 KW, an administrative fee of three hundred (300) euros shall be paid.
iii. For activities requiring mechanical equipment of a value up to one million (1.000.000) euros and installed power up to 1.000 KW, an ad-ministrative fee of four hundred (400) euros shall be paid.
iv. For activities requiring mechanical equipment of a value up to two million (2.000.000) euros and installed power up to 2.000 KW, an ad-ministrative fee of five hundred (500) euros shall be paid.
v. For activities requiring mechanical equipment of a value up to three million (3.000.000) euros and installed power up to 4.000 KW, an ad-ministrative fee of six hundred (600) euros shall be paid.
vi. For activities requiring mechanical equipment of a value superior to three million (3.000.000) euros and consuming over 4.000 KW of power, an administrative fee amounting to zero point three per thousand (0,3‰) of the value of the mechanical equipment and not exceed-ing five thousand (5.000) euros.
These administrative fees are also payable in every case of granting the authorisation of an installation, extension or modernisation, the amount being calculated upon the basis of the value and power of the mechanical equipment of the extension or modernisation.
The proof of payment is being kept on-site at the installation in the relevant file
200 € - 5000 €
Cost Calculation
Quantitative
Method of Payment
Bank cashier, Digital (web banking)
Type of Cost
Administrative Fee (not provided by e-paravolo webpage)
No
1
Installation permit (if required)
Certificate from town planning
Installation permit (if required)
Submission by:
Keep within business establishment
Submitted by:
Legal entities, Persons
Document submitted under requirements:
Yes
Document’s requirement:
Administrative
No
4558
2
Brief technical description of the installation, signed by the legally competent engineer, containing:
- Land surveyor’s diagram showing the building installations and the necessary signalling and traffic regulation information within the plot.
- Description of the activity (production process, type of raw materials used and products produced, flow chart of work performed, etc.)
- Floor plan with indicative placement of the machines on it and a list of the machines with the indication of their power. The place-ment information is to be provided in order to facilitate controls and any deviations in the presentation of their placement on the floor plan is not subject to sanction, as long as there is no safety issue.
Drawings / studies by an engineer / architect
Brief technical description of the installation, signed by the legally competent engineer, containing:
- Land surveyor’s diagram showing the building installations and the necessary signalling and traffic regulation information within the plot.
- Description of the activity (production process, type of raw materials used and products produced, flow chart of work performed, etc.)
- Floor plan with indicative placement of the machines on it and a list of the machines with the indication of their power. The place-ment information is to be provided in order to facilitate controls and any deviations in the presentation of their placement on the floor plan is not subject to sanction, as long as there is no safety issue.
Submission by:
Keep within business establishment
Submitted by:
Legal entities, Persons
Document submitted under requirements:
No
No
5768
3
Solemn declaration of a legally competent engineer certifying the static adequacy and the industrial-craft use of the building, that no new building permit or regularisation or legalisation of the building installation is required, that the installation of the mechanical equipment took place in a main use area (not an auxiliary or shared one) and that it is in accordance with the technical description of the installation (previous supporting document), with explicit reference to the date of its stamping.
Solemn Declaration
Solemn declaration of a legally competent engineer certifying the static adequacy and the industrial-craft use of the building, that no new building permit or regularisation or legalisation of the building installation is required, that the installation of the mechanical equipment took place in a main use area (not an auxiliary or shared one) and that it is in accordance with the technical description of the installation (previous supporting document), with explicit reference to the date of its stamping.
Relevant link:
https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
Submission by:
Keep within business establishment
Submitted by:
Legal entities, Persons
Relevant Procedure:
Solemn declaration and electronic solemn declaration
Document submitted under requirements:
No
No
7320
4
Decision of Approval of Environmental Terms (AEPO) or decision of inclusion in Model Environmental Commitments (PPD).
Rule
Decision of Approval of Environmental Terms (AEPO) or decision of inclusion in Model Environmental Commitments (PPD).
Submission by:
Keep within business establishment
Submitted by:
Legal entities, Persons
Document submitted under requirements:
No
No
1127
5
Building permit, with all the accompanying studies and drawings, including any regularisations, arrangements or legalisations of arbitrary constructions, as well as the related attestations of payment of fines..
Official document
Building permit, with all the accompanying studies and drawings, including any regularisations, arrangements or legalisations of arbitrary constructions, as well as the related attestations of payment of fines..
Submission by:
Keep within business establishment
Submitted by:
Legal entities, Persons
Document submitted under requirements:
No
No
6440
6
Special supporting documents (required on a case by case basis):
- Solemn declaration of undertaking the supervision, operation and maintenance of the unit by its owner and the legally competent engineer respectively, when the total driving power of the unit exceeds 59 kW (80HP), or a maintenance contract of the mechanical equipment by the manufacturer assuming the responsibility of the operation of the mechanical equipment.
- Fire Safety Certificate from the competent Fire Department in accordance with the joint ministerial decision F15/ oik.1589/ 104/2006 (B90), if required. If the unit includes an installation of liquid fuels or LPG for the operational needs of the units, the provisions of the joint ministerial decision of 28-6-1991 (GG 578B/ 1991) and the ministerial decision D3/ 14858/1993 (B 477) apply re-spectively.
- Valid certificate of control for the LPG tanks of the unit, according to the ministerial decision D3/ 14858/1993 (B 477), article 3.3.13, if required.
- Valid acceptance certificate and control certificate for the boilers of the unit, according to articles 5 and 9 of the ministerial decision 10735/651/2012 (B 2656), if required.
- Water use permit, in case of use of water from a drilling for artisanal use, if required.
- Solemn declaration according to the ministerial decision of paragraph 3 of article 3A of law 2244/1994 for the backup power generators of the unit, if required.
- Authorisation to level or interrupt a section of sidewalk, or approval of traffic connection or approval of entry - exit by the competent Service for the maintenance of the road(s) in front of the unit, accompanied by a solemn declaration by a legally competent engineer that the traffic connection or entry - exit of the installation was performed according to the approved plans.
- Licence to use natural gas, if required.
- Authorisation for activities of processing food and other products of animal origin, pursuant to Regulations 853/2004 (L139) or 183/2005 (L35) or 1069/2009 (L300).
- Permit for the construction of a port project and the use of the seashore and beach, if required.
Additional supporting documents
Special supporting documents (required on a case by case basis):
- Solemn declaration of undertaking the supervision, operation and maintenance of the unit by its owner and the legally competent engineer respectively, when the total driving power of the unit exceeds 59 kW (80HP), or a maintenance contract of the mechanical equipment by the manufacturer assuming the responsibility of the operation of the mechanical equipment.
- Fire Safety Certificate from the competent Fire Department in accordance with the joint ministerial decision F15/ oik.1589/ 104/2006 (B90), if required. If the unit includes an installation of liquid fuels or LPG for the operational needs of the units, the provisions of the joint ministerial decision of 28-6-1991 (GG 578B/ 1991) and the ministerial decision D3/ 14858/1993 (B 477) apply re-spectively.
- Valid certificate of control for the LPG tanks of the unit, according to the ministerial decision D3/ 14858/1993 (B 477), article 3.3.13, if required.
- Valid acceptance certificate and control certificate for the boilers of the unit, according to articles 5 and 9 of the ministerial decision 10735/651/2012 (B 2656), if required.
- Water use permit, in case of use of water from a drilling for artisanal use, if required.
- Solemn declaration according to the ministerial decision of paragraph 3 of article 3A of law 2244/1994 for the backup power generators of the unit, if required.
- Authorisation to level or interrupt a section of sidewalk, or approval of traffic connection or approval of entry - exit by the competent Service for the maintenance of the road(s) in front of the unit, accompanied by a solemn declaration by a legally competent engineer that the traffic connection or entry - exit of the installation was performed according to the approved plans.
- Licence to use natural gas, if required.
- Authorisation for activities of processing food and other products of animal origin, pursuant to Regulations 853/2004 (L139) or 183/2005 (L35) or 1069/2009 (L300).
- Permit for the construction of a port project and the use of the seashore and beach, if required.
Submission by:
Keep within business establishment
Submitted by:
Legal entities, Persons
Document submitted under requirements:
Yes
Document’s requirement:
Administrative
No
9102
Law
11, 17, 25
4442
2016
230
Α
Law
2
4336
2015
94
Α
Ministerial Decision
1
64618/856/Φ15
2018
2278
Β
Ministerial Decision
5045/116550
2015
2323
Β
Ministerial Decision
483/35/Φ.15
2012
158
Β
Description
Delineation of type, required documents and process for installing and operating manufacturing activities of Law Ν. 3982/2011 (GG Α΄143), and of modification and renewal of permits along with the deadline for transfer or technical rebuilding.
Legal references
https://www.et.gr/api/DownloadFeksApi/?fek pdf=20120200158
1
Submission of notification
Responsible for Implementation
Institutional software
Μethod of Implementation
Software action
Link
https://notifybusiness.gov.gr/assets/index.html
Description
Submission of notification in accordance with article 6 of Law 4442/2016, through the notifybusiness.gov.gr site.
Each notification submitted automatically receives a document reference (protocol) number from the system, as well as a unique declaration number.
The interested party receives from the system a receipt for the submission of the notification , to be included in the file kept at the installation.
No
No
Cookies help us deliver our services. By using our services, you agree to our use of cookies.