|
|
| Line 40: |
Line 40: |
| | |process_evidence_cost_total_number=7 | | |process_evidence_cost_total_number=7 |
| | |process_evidence_prerequisite_total_number=1 | | |process_evidence_prerequisite_total_number=1 |
| − | |process_evidence_total_number=26 | + | |process_evidence_total_number=25 |
| | |process_evidence_step_total_number=4 | | |process_evidence_step_total_number=4 |
| | |process_evidence_step_digital_total_number=0 | | |process_evidence_step_digital_total_number=0 |
| Line 234: |
Line 234: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Drawings/studies by an engineer/architect | | |process_evidence_type=Drawings/studies by an engineer/architect |
| Line 244: |
Line 244: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Persons | | |process_evidence_owner=Persons |
| | |process_evidence_type=Solemn Declaration | | |process_evidence_type=Solemn Declaration |
| Line 259: |
Line 259: |
| | |process_evidence_alternative_of_selector=3 | | |process_evidence_alternative_of_selector=3 |
| | |process_evidence_alternative_of=3 | | |process_evidence_alternative_of=3 |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities | | |process_evidence_owner=Legal entities |
| | |process_evidence_type=Solemn Declaration | | |process_evidence_type=Solemn Declaration |
| Line 286: |
Line 286: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Drawings/studies by an engineer/architect | | |process_evidence_type=Drawings/studies by an engineer/architect |
| Line 296: |
Line 296: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Drawings/studies by an engineer/architect | | |process_evidence_type=Drawings/studies by an engineer/architect |
| Line 306: |
Line 306: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Drawings/studies by an engineer/architect | | |process_evidence_type=Drawings/studies by an engineer/architect |
| Line 316: |
Line 316: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Report | | |process_evidence_type=Report |
| Line 326: |
Line 326: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Declaration | | |process_evidence_type=Declaration |
| Line 336: |
Line 336: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Opinion | | |process_evidence_type=Opinion |
| Line 346: |
Line 346: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Application | | |process_evidence_type=Application |
| Line 356: |
Line 356: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Certificate | | |process_evidence_type=Certificate |
| Line 366: |
Line 366: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Βuilding permit | | |process_evidence_type=Βuilding permit |
| Line 377: |
Line 377: |
| | |process_evidence_prerequisite=Building | | |process_evidence_prerequisite=Building |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Permit | | |process_evidence_type=Permit |
| Line 408: |
Line 408: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual) | + | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Solemn Declaration | | |process_evidence_type=Solemn Declaration |
| − | |process_evidence_description=Solemn declaration of the installer of the system of inputs-outputs of liquid fuels and responsible statement of the Engineer, according to the provisions of JMD Φ2-1617 / 2010 (Β` 1980) as in force, submitted within thirty (30) working days from the issuance of the operating license. In case they are not submitted within the above period, the issued permit is revokedι. | + | |process_evidence_description=Solemn declaration of the installer of the system of inputs-outputs of liquid fuels and responsible statement of the Engineer. |
| | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/upeuthune-delose-kai-exousiodotese/ekdose-upeuthunes-deloses | | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/upeuthune-delose-kai-exousiodotese/ekdose-upeuthunes-deloses |
| − | |process_evidence_note=For the Operating Licence | + | |process_evidence_note=Solemn declaration, according to the provisions of JMD Φ2-1617 / 2010 (Β` 1980) as in force, submitted within thirty (30) working days from the issuance of the operating license. In case they are not submitted within the above period, the issued permit is revoked. |
| | + | For the Operating Licence. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 419: |
Line 420: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual) | + | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Certification | + | |process_evidence_type=Certificate |
| − | |process_evidence_description=ATEX explosion proof certificates for pumps, distributors, level gauges and other equipment | + | |process_evidence_description=ATEX explosion proof certificates for pumps, distributors, level gauges and other equipment. |
| − | |process_evidence_note=For the Operating Licence | + | |process_evidence_note=For the Operating Licence. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 429: |
Line 430: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual) | + | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Certification | + | |process_evidence_type=Certificate |
| | |process_evidence_description=Certificate of compliance from an accredited body of metal and / or plastic fuel tanks, in accordance with the provisions of the requested study, the applicable provisions and national or European standards and regulations. | | |process_evidence_description=Certificate of compliance from an accredited body of metal and / or plastic fuel tanks, in accordance with the provisions of the requested study, the applicable provisions and national or European standards and regulations. |
| − | |process_evidence_note=For the Operating Licence | + | |process_evidence_note=For the Operating Licence. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 439: |
Line 440: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual) | + | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Certification | + | |process_evidence_type=Certificate |
| | |process_evidence_description=Certificate of compliance for the electrical installations (strong currents, weak, ground, lighting), according to applicable standards and regulations. | | |process_evidence_description=Certificate of compliance for the electrical installations (strong currents, weak, ground, lighting), according to applicable standards and regulations. |
| − | |process_evidence_note=For the Operating Licence | + | |process_evidence_note=For the Operating Licence. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 449: |
Line 450: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual) | + | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Solemn Declaration | | |process_evidence_type=Solemn Declaration |
| Line 458: |
Line 459: |
| | - All the craftsmen, foremen, assistants involved, who were used for the construction of the gas station, have - where provided by the existing legislation - the required licenses or certificates of declaration of profession in accordance with the relevant national or European standards | | - All the craftsmen, foremen, assistants involved, who were used for the construction of the gas station, have - where provided by the existing legislation - the required licenses or certificates of declaration of profession in accordance with the relevant national or European standards |
| | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/upeuthune-delose-kai-exousiodotese/ekdose-upeuthunes-deloses | | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/upeuthune-delose-kai-exousiodotese/ekdose-upeuthunes-deloses |
| − | |process_evidence_note=For the Operating Licence | + | |process_evidence_note=For the Operating Licence. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 464: |
Line 465: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual) | + | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Solemn Declaration | | |process_evidence_type=Solemn Declaration |
| − | |process_evidence_description=Solemn declaration for assuming the duties of Head of Operation of a gas station, according to the provisions of article 24 of law 4439/2016 (A` 222). | + | |process_evidence_description=Solemn declaration for assuming the duties of Head of Operation of a gas station, according to the provisions of article 24 of law 4439/2016 (A΄ 222). |
| | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/upeuthune-delose-kai-exousiodotese/ekdose-upeuthunes-deloses | | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/upeuthune-delose-kai-exousiodotese/ekdose-upeuthunes-deloses |
| − | |process_evidence_note=For the Operating Licence | + | |process_evidence_note=For the Operating Licence. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 475: |
Line 476: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual) | + | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Certificate | + | |process_evidence_type=Certification |
| − | |process_evidence_description=Certificate of training, from an appropriate educational structure, that the operator of the service station or the natural person designated by him/her, knows the use of firefighting equipment and fire protection equipment. | + | |process_evidence_description=Certification of training, from an appropriate educational structure, that the operator of the service station or the natural person designated by him/her, knows the use of firefighting equipment and fire protection equipment. |
| − | |process_evidence_note=For the Operating Licence | + | |process_evidence_note=For the Operating Licence. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 485: |
Line 486: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| − | |process_evidence_submission_type=Submitted by the applicant (manual) | + | |process_evidence_submission_type=Submitted by the applicant (manual), Submitted by the applicant (digital) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| | |process_evidence_type=Solemn Declaration | | |process_evidence_type=Solemn Declaration |
| − | |process_evidence_description=Solemn Declaration of the applicant (natural person or legal representative), prepared in accordance with the provisions of article 8 of Law 1599/1986, in which it is responsibly stated that the staff of the service station knows the use of the available fire protection means, the actions they must take in case of emergency, the use of equipment for the prevention and control of marine pollution from petroleum products, as well as the actions to be taken in case of leakage into the sea | + | |process_evidence_description=Solemn Declaration of the applicant (natural person or legal representative), prepared in accordance with the provisions of article 8 of Law 1599/1986, in which it is responsibly stated that the staff of the service station knows the use of the available fire protection means, the actions they must take in case of emergency, the use of equipment for the prevention and control of marine pollution from petroleum products, as well as the actions to be taken in case of leakage into the sea. |
| | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/upeuthune-delose-kai-exousiodotese/ekdose-upeuthunes-deloses | | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/upeuthune-delose-kai-exousiodotese/ekdose-upeuthunes-deloses |
| − | |process_evidence_note=For the Operating Licence | + | |process_evidence_note=For the Operating Licence. |
| | }} | | }} |
| | {{process evidences | | {{process evidences |
| Line 498: |
Line 499: |
| | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) | | |process_evidence_submission_type=Submitted by the applicant (digital), Submitted by the applicant (manual) |
| | |process_evidence_type=Drawings/studies by an engineer/architect | | |process_evidence_type=Drawings/studies by an engineer/architect |
| − | |process_evidence_description=Technical file for the construction of the gas station, which includes at least the following | + | |process_evidence_description=Technical file for the construction of the gas station, which includes at least the following: |
| − | - All certificates of compliance regarding the equipment, electrical installations, tanks and piping used for the construction of the "port gas sta-tion" are in accordance with applicable national and European standards and regulations. | + | - All certificates of compliance regarding the equipment, electrical installations, tanks and piping used for the construction of the "port gas station" are in accordance with applicable national and European standards and regulations. |
| | - Contract with a licensed waste management body, in accordance with the provisions in force | | - Contract with a licensed waste management body, in accordance with the provisions in force |
| | - Copies of the radiographic inspections of the tanks as well as the non-destructive inspections of the tanks, in the case of existing underground fuel tanks, which document compliance with applicable European Standards and Practices, as well as the hydraulic test certificate | | - Copies of the radiographic inspections of the tanks as well as the non-destructive inspections of the tanks, in the case of existing underground fuel tanks, which document compliance with applicable European Standards and Practices, as well as the hydraulic test certificate |
| | - The preventive equipment maintenance program. | | - The preventive equipment maintenance program. |
| − | |process_evidence_note=For the Operating Licence | + | |process_evidence_note=For the Operating Licence. |
| − | }}
| |
| − | {{process evidences
| |
| − | |process_evidence_num_id=27
| |
| − | |process_evidence_is_under_prerequisite=No
| |
| − | |process_evidence_alternative=No
| |
| − | |process_evidence_submission_type=Submitted by the applicant (manual)
| |
| − | |process_evidence_owner=Legal entities, Persons
| |
| − | |process_evidence_type=report
| |
| − | |process_evidence_identification_type=Identification document
| |
| − | |process_evidence_description=A technical report/description of the changes
| |
| − | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/kataggelies
| |
| − | |process_evidence_note=For the Amendment of the Licence
| |
| | }} | | }} |
| | {{process rules | | {{process rules |