Difference between revisions of "ΔΔ:Preliminary approval of a building permit"

From National Registry of Administrative Public Services
 
(11 intermediate revisions by 5 users not shown)
Line 1: Line 1:
 
{{process
 
{{process
|process_uuid=faec43d5-29e3-4c14-ae07-9c9dbb7f427b
 
|process_id=893653
 
 
|process_official_title=Preliminary approval of a building permit
 
|process_official_title=Preliminary approval of a building permit
 
|process_alternative_titles=Preliminary approval of building permit / revision permit
 
|process_alternative_titles=Preliminary approval of building permit / revision permit
Line 10: Line 8:
 
|process_provision_org_group=1461
 
|process_provision_org_group=1461
 
|process_remarks=The period of validity of the preliminary approval of the revision permit may not exceed the period of validity of the revision permit. By way of exception, if relating to modification of street and building lines or amendment of buildable areas in communal areas, as well as in cases of subsequent inclusion of the area under a cultural heritage or nature protection status, the preliminary approval shall certify the right to build, only at the time of its issue.
 
|process_remarks=The period of validity of the preliminary approval of the revision permit may not exceed the period of validity of the revision permit. By way of exception, if relating to modification of street and building lines or amendment of buildable areas in communal areas, as well as in cases of subsequent inclusion of the area under a cultural heritage or nature protection status, the preliminary approval shall certify the right to build, only at the time of its issue.
|process_deadline_duration=15552000
+
|process_deadline_duration=P6M
 
|process_provided_language=Greek
 
|process_provided_language=Greek
 
|process_evidence_identification_type=Other
 
|process_evidence_identification_type=Other
Line 19: Line 17:
 
|process_usage=Supporting document
 
|process_usage=Supporting document
 
|process_output_type=Administrative Act
 
|process_output_type=Administrative Act
|process_validity_duration=31104000
+
|process_validity_duration_set=Defined
 +
|process_validity_duration=P1Y
 
|process_source=EU-GO (support), Framers
 
|process_source=EU-GO (support), Framers
|process_provided_to=Engineers,Public Bodies,Engineers
+
|process_provided_to=Public Bodies,Engineers
 
|process_tax_type=Applications,Attestations,Decisions
 
|process_tax_type=Applications,Attestations,Decisions
|process_life_events=Building permits - engineers
+
|process_life_events=Licences and compliance
 
|process_sdg_resource=Hierarchical appeal/recourse
 
|process_sdg_resource=Hierarchical appeal/recourse
 
|process_sdg_lack_of_response_rule=Other
 
|process_sdg_lack_of_response_rule=Other
 
|process_sdg_lack_of_response_rule_other=The appeal must be filed within a time limit of thirty (30) days from the notification or otherwise-obtained full knowledge of the act by the applicant by registering it with the City Planning Agency that issued the contested act.
 
|process_sdg_lack_of_response_rule_other=The appeal must be filed within a time limit of thirty (30) days from the notification or otherwise-obtained full knowledge of the act by the applicant by registering it with the City Planning Agency that issued the contested act.
 
|process_sdg_notes=Pursuant to Article 23 of Law 4495/17, the Regional Councils for Urban Planning Issues and Disputes review the administrative appeals against enforceable acts or omissions of City Planning Agencies, which are issued during the issuance procedure of the preliminary approvals of building permits.
 
|process_sdg_notes=Pursuant to Article 23 of Law 4495/17, the Regional Councils for Urban Planning Issues and Disputes review the administrative appeals against enforceable acts or omissions of City Planning Agencies, which are issued during the issuance procedure of the preliminary approvals of building permits.
|process_total_duration_steps_min=345600
+
|process_total_duration_steps_min=691200
|process_total_duration_steps_max=345600
+
|process_total_duration_steps_max=691200
 
|process_cost_min=20.00
 
|process_cost_min=20.00
 
|process_cost_max=20.00
 
|process_cost_max=20.00
Line 43: Line 42:
 
|process_application_submission_type=Submitted by the applicant (digital)
 
|process_application_submission_type=Submitted by the applicant (digital)
 
|process_application_owner=Persons, Public bodies
 
|process_application_owner=Persons, Public bodies
|process_application_description=Request by the owner of the project or of the legal right, with declarations of awards and studies.
+
|process_application_description=Application by the project owner or by the person with a legitimate right, together with the declarations of assignment of undertaking and supervising studies.
|process_application_note=The application shall be accompanied by the declaration of delegation of the master of the work or of the legal right and the declarations of undertaking and study surveys of the engineers concerned.
+
|process_application_note=The application is accompanied by the declaration of assignment of the project owner or of the person with a legitimate right and the declarations of assignment of undertaking and supervising studies of the engineers involved.
 +
|process_uuid=faec43d5-29e3-4c14-ae07-9c9dbb7f427b
 +
|process_id=893653
 
}}
 
}}
 
{{process conditions
 
{{process conditions
Line 50: Line 51:
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
 
|process_conditions_type=Possession of passwords to enter software
 
|process_conditions_type=Possession of passwords to enter software
|process_conditions_name=The engineers shall be the sole applicants for the authorisation of building permit and shall be required to hold codes in the digital services of the TEI.
+
|process_conditions_name=Engineers are the sole applicants for the preliminary approval of a building permit and they must hold passwords to the digital services of the Technical Chamber of Greece.
 
|process_conditions_url=https://web.tee.gr/mytee/
 
|process_conditions_url=https://web.tee.gr/mytee/
 
}}
 
}}
Line 57: Line 58:
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
 
|process_conditions_type=Administrative
 
|process_conditions_type=Administrative
|process_conditions_name=The pre-authorisation procedure for the issue of a building permit is optional and covers each licence category under Article 36 of Law 4495/17.
+
|process_conditions_name=The preliminary approval procedure for the issuance of a building permit is optional and concerns all categories of permit issuance of Article 36 of Law 4495/17.
 +
The procedure for the preliminary approval of a revision permit is optional insofar as it concerns a change in urban planning sizes of coverage, height and volume. Alternatively, the written certification of Article 38(2)(b)(ba) and (bb) of Law 4495/17 is required.
 
}}
 
}}
 
{{process conditions
 
{{process conditions
Line 63: Line 65:
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
 
|process_conditions_type=Administrative
 
|process_conditions_type=Administrative
|process_conditions_name=(a) In buildings with a surface counted on the structure of more than 3,000 m2 and an addition to existing buildings with an overall resulting surface counting on the construction of more than 3,000 sq.m., (b) where a building permit is provided for other services than the Building Service, the construction pre-authorisation is compulsory and is granted by the relevant Ministry for the construction of permanent buildings, works of particular environmental and residential importance or works of special control over the conditions of construction.
+
|process_conditions_name=The preliminary approval of a building permit is compulsory in the following cases:
 +
a) Buildings with a surface area added to the structure of more than 3,000 m2 and additions to existing buildings with a total resulting surface area added to the structure of more than 3,000 m2.
 +
b) Where a building permit needs to be issued by services other than the City Planning Agency, a preliminary building approval is compulsory and is granted by the competent City Planning Agency.
 +
c) For the construction of permanent building facilities, projects of particular environmental and residential importance, or projects subject to special inspection as regards building regulations.
 
}}
 
}}
 
{{process conditions
 
{{process conditions
Line 69: Line 74:
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
 
|process_conditions_type=Administrative
 
|process_conditions_type=Administrative
|process_conditions_name=Pre-authorisation is issued exclusively by the Ministry of Finance, unless otherwise provided for in specific provisions. In this case, the topographical chart is checked by the relevant Ministry and transmitted to the department responsible for issuing the approval. For investment projects that have been included in the Strategic Investments in accordance with the relevant legislative framework on strategic investment, as well as for investment projects submitted for evaluation to the Hellenic Investment and External Trade Company SA under the same legislative framework, the approval is issued by the Ministry of Development and Investment's Directorate-General.
+
|process_conditions_name=The preliminary approval is issued exclusively by the
 +
competent City Planning Agency, unless more specific provisions provide otherwise. In this case, the survey diagram will be checked by the competent City Planning Agency and sent to the department responsible for issuing the preliminary approval. Investment plans that have been included in Strategic Investments in accordance with the relevant legislative framework on strategic investments.
 
}}
 
}}
 
{{process conditions
 
{{process conditions
Line 75: Line 81:
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
 
|process_conditions_type=Administrative
 
|process_conditions_type=Administrative
|process_conditions_name=No pre-authorisation is required for investments that have been or fall under Law 3986/2011 (A 152).
+
|process_conditions_name=Preliminary approval is not required for investments that have been or are subject to Law 3986/2011 (Government Gazette, Series I, No 152).
 
}}
 
}}
 
{{process evidences cost
 
{{process evidences cost
Line 82: Line 88:
 
|process_evidence_cost_type=Impost
 
|process_evidence_cost_type=Impost
 
|process_evidence_cost_calculation=One-off
 
|process_evidence_cost_calculation=One-off
|process_evidence_cost_description=Anti-performance fee T.E.
+
|process_evidence_cost_description=TCG state fee
 
|process_evidence_cost_min=20
 
|process_evidence_cost_min=20
 
|process_evidence_cost_max=20
 
|process_evidence_cost_max=20
 +
|process_evidence_cost_payment_type=Bank cashier, Digital (debit / credit card), Digital (web banking)
 
}}
 
}}
 
{{process evidences
 
{{process evidences
Line 93: Line 100:
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_owner=Persons, Public bodies
 
|process_evidence_owner=Persons, Public bodies
|process_evidence_description=Descriptive diagram
+
|process_evidence_description=Survey diagram
|process_evidence_note=The topographic diagram is dependent on the state coordinate system, in accordance with the applicable specifications, in accordance with Article 39 of Law 4495/2017 "Signature diagram and cover diagram specifications".
+
|process_evidence_note=The survey diagram is dependent on the State coordinate system, in accordance with the applicable specifications, pursuant to Article 39 of Law 4495/2017 ‘Specifications for preparation of survey diagram and coverage diagram’.
 
}}
 
}}
 
{{process evidences
 
{{process evidences
Line 104: Line 111:
 
|process_evidence_owner=Persons, Public bodies
 
|process_evidence_owner=Persons, Public bodies
 
|process_evidence_description=Coverage diagram, in accordance with the applicable specifications
 
|process_evidence_description=Coverage diagram, in accordance with the applicable specifications
|process_evidence_note=The coverage diagram shall be drawn up in accordance with Article 39 of Law 4495/2017 "Description specifications for topographical diagram and coverage".
+
|process_evidence_note=The coverage diagram is prepared in accordance with Article 39 of Law 4495/2017 ‘Specifications for preparation of survey diagram and coverage diagram’.
 
}}
 
}}
 
{{process evidences
 
{{process evidences
Line 113: Line 120:
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_owner=Persons, Public bodies
 
|process_evidence_owner=Persons, Public bodies
|process_evidence_description=Ownership title
+
|process_evidence_description=Title deed
|process_evidence_note=Title of ownership and a recent certificate of ownership, a real estate sheet or an extract from a real estate.
+
|process_evidence_note=Title deed and a recent certificate of ownership or a cadastral map or extract of a cadastral map for each property.
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 
|process_evidence_num_id=4
 
|process_evidence_num_id=4
|process_evidence_type=6866
+
|process_evidence_type=2243
 
|process_evidence_is_under_prerequisite=No
 
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_owner=Persons, Public bodies
 
|process_evidence_owner=Persons, Public bodies
|process_evidence_description=Evidence of the legality of the existing buildings
+
|process_evidence_description=Proof of legality of existing buildings
|process_evidence_note=The legality figures may be issued on a case-by-case basis, engineer attestations in accordance with the provisions of Law 4495/2017, arbitrary claims, etc.
+
|process_evidence_note=Depending on the case, the proof of legality may be the issued building permits, engineer certificates in accordance with the provisions of Law 4495/2017, subjection to the law on unlawful construction, etc.
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 
|process_evidence_num_id=5
 
|process_evidence_num_id=5
|process_evidence_type=6631
+
|process_evidence_type=1068
 
|process_evidence_is_under_prerequisite=No
 
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
Line 134: Line 141:
 
|process_evidence_owner=Persons, Public bodies
 
|process_evidence_owner=Persons, Public bodies
 
|process_evidence_description=Technical report
 
|process_evidence_description=Technical report
|process_evidence_note=Technical report which accurately describes the work, sizes and uses.
+
|process_evidence_note=A technical report that describes the project, sizes and uses with precision.
 
}}
 
}}
 
{{process rules
 
{{process rules
Line 140: Line 147:
 
|process_rule_decision_number=4495
 
|process_rule_decision_number=4495
 
|process_rule_decision_year=2017
 
|process_rule_decision_year=2017
|process_rule_description=Control and protection of the Structured Environment and other provisions
+
|process_rule_description=Control and protection of the Structured Environment and other provisions.
 
|process_rule_gazette_doc_number=167
 
|process_rule_gazette_doc_number=167
 
|process_rule_gazette_doc_issue=Α
 
|process_rule_gazette_doc_issue=Α
Line 149: Line 156:
 
|process_rule_decision_number=4067
 
|process_rule_decision_number=4067
 
|process_rule_decision_year=2012
 
|process_rule_decision_year=2012
|process_rule_description=New Construction Regulation
+
|process_rule_description=New Building Regulation
 
|process_rule_gazette_doc_number=79
 
|process_rule_gazette_doc_number=79
 
|process_rule_gazette_doc_issue=Α
 
|process_rule_gazette_doc_issue=Α
Line 167: Line 174:
 
|process_step_exit=No
 
|process_step_exit=No
 
|process_step_child=No
 
|process_step_child=No
|process_step_title=Receipt of the application for prior authorisation of a building permit
+
|process_step_title=Receipt of the application for preliminary approval of a building permit
 
|process_step_official=Competent Directorate
 
|process_step_official=Competent Directorate
 
|process_step_implementation=Software action
 
|process_step_implementation=Software action
|process_step_duration_min=86400
+
|process_step_duration_min=P1D
|process_step_duration_max=86400
+
|process_step_duration_max=P1D
|process_step_description=The relevant Building Service of the relevant Municipality shall receive the relevant engineer request through the TEI platform, together with the necessary supporting documents and studies.
+
|process_step_description=The competent City Planning Agency of the local municipality receives the relevant request of the engineer via the platform of the Technical Chamber of Greece, with the necessary supporting documents and designs attached.
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 178: Line 185:
 
|process_step_exit=No
 
|process_step_exit=No
 
|process_step_child=No
 
|process_step_child=No
|process_step_title=Folder Fully Control
+
|process_step_title=Checking of dossier completeness
 
|process_step_official=Competent Employee
 
|process_step_official=Competent Employee
 
|process_step_implementation=Software action
 
|process_step_implementation=Software action
|process_step_duration_min=86400
+
|process_step_duration_min=P1D
|process_step_duration_max=86400
+
|process_step_duration_max=P1D
|process_step_description=A competent official of the Municipality's Building Service shall check the completeness of the file.
+
|process_step_description=The competent employee of the Municipal City Planning Agency checks the completeness of the dossier.
|process_step_note=If the Ministry finds shortcomings or errors the request administrator shall be informed via the information system in order to make the necessary supplements or corrections within two (2) months, otherwise the application submitted with the attached file shall be filed.
+
|process_step_note=If the City Planning Agency finds omissions or errors, the administrator of the application is notified through the information system so that they can make the necessary additions or corrections within a time limit of two (2) months; otherwise, the application submitted with the attached dossier will be closed.
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 190: Line 197:
 
|process_step_exit=No
 
|process_step_exit=No
 
|process_step_child=No
 
|process_step_child=No
|process_step_title=Control of property title and topographical diagram
+
|process_step_title=Checking of title deed and survey diagram
 
|process_step_official=Competent Employee
 
|process_step_official=Competent Employee
 
|process_step_implementation=Inspection
 
|process_step_implementation=Inspection
|process_step_duration_min=172800
+
|process_step_duration_min=P2D
|process_step_duration_max=172800
+
|process_step_duration_max=P2D
|process_step_description=The title of property shall be checked for the determination of the completeness, buildability and the time of fragmentation of the plot or field and the topographical chart for compliance with the general and specific urban provisions and specifications, as well as for checking the elements contained therein.
+
|process_step_description=The title deed is checked to verify the integrity, buildability and time of segmentation of the plot or parcel of land, and the survey diagram is checked as regards compliance with general and specific urban planning provisions and specifications, as well as verification of the information included therein.
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 203: Line 210:
 
|process_step_previous_child_selector=3
 
|process_step_previous_child_selector=3
 
|process_step_previous_child=3
 
|process_step_previous_child=3
|process_step_title=Approval of the topographical diagram
+
|process_step_title=Approval of a survey diagram
 
|process_step_official=Competent Employee
 
|process_step_official=Competent Employee
 
|process_step_implementation=Software action
 
|process_step_implementation=Software action
|process_step_description=Upon approval of the Topographic Chart, the folder shall be promoted to check the Coverage Chart.
+
|process_step_description=Following approval of the survey diagram, the dossier is forwarded for the purpose of checking the coverage diagram.
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 214: Line 221:
 
|process_step_previous_child_selector=4
 
|process_step_previous_child_selector=4
 
|process_step_previous_child=4
 
|process_step_previous_child=4
|process_step_title=Check the coverage diagram
+
|process_step_title=Vetting of a coverage diagram
 
|process_step_official=Competent Employee
 
|process_step_official=Competent Employee
 
|process_step_implementation=Inspection
 
|process_step_implementation=Inspection
|process_step_duration_min=518400
+
|process_step_duration_min=P6D
|process_step_duration_max=518400
+
|process_step_duration_max=P6D
|process_step_description=Check the coverage diagram and any relevant parking takeover contribution form required in respect of compliance with the general and specific urban provisions and specifications of the required data, as described in Article 39 of Law 4495/17, as well as evidence of the legality of existing buildings on the plot or field, provided under the responsibility of the engineer.
+
|process_step_description=The coverage diagram and any required relevant contribution form for parking space acquisition are checked with regard to compliance with the general and specific urban planning provisions and the specifications of the required data, described in Article 39 of Law 4495/17, as well as the proof of legality of existing buildings on the plot or parcel, which are produced under the responsibility of the engineer.
|process_step_note=The verification of the evidence of legality of existing buildings on the plot or land, relates to the identification of the elements contained in the already issued building permits, as well as to any declarations of subordination of arbitrary structures, and is limited to the correct matching of the sizes indicated in the plans of the already issued building permits and to the plans accompanying declarations of subordination of arbitrary laws, as reflected in the cover chart.
+
|process_step_note=The checking of the proof of the legality of existing buildings on the plot or parcel involves the verification of the information included in the building permits already issued, as well as any declarations for subjection to the law on unlawful construction, and is limited to the correct matching of the sizes indicated in the plans of the building permits already issued and the plans accompanying declarations of subjection to laws on unlawful construction with those shown in the coverage diagram.
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 228: Line 235:
 
|process_step_previous_child_selector=5
 
|process_step_previous_child_selector=5
 
|process_step_previous_child=5
 
|process_step_previous_child=5
|process_step_title=Receipt Diagram Approval
+
|process_step_title=Approval of a coverage diagram
 
|process_step_official=Competent Employee
 
|process_step_official=Competent Employee
 
|process_step_implementation=Software action
 
|process_step_implementation=Software action
Line 238: Line 245:
 
|process_step_previous_child_selector=6
 
|process_step_previous_child_selector=6
 
|process_step_previous_child=6
 
|process_step_previous_child=6
|process_step_title=Pre-approved building permit
+
|process_step_title=Issuance of preliminary approval of building permit
 
|process_step_official=Competent Employee
 
|process_step_official=Competent Employee
 
|process_step_implementation=Software action
 
|process_step_implementation=Software action
|process_step_description=The administrative act of pre-authorisation shall be adopted and the necessary studies, authorisations and other supporting documents to be provided for the issue of the building permit shall be established.
+
|process_step_description=The administrative act of preliminary approval is issued and the necessary studies, approvals and other supporting documents to be submitted for the issuance of the building permit are determined.
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 249: Line 256:
 
|process_step_previous_child_selector=3
 
|process_step_previous_child_selector=3
 
|process_step_previous_child=3
 
|process_step_previous_child=3
|process_step_title=Deficiencies or errors in the Topographic Chart
+
|process_step_title=Omissions or errors in a survey diagram
|process_step_description=In the case of determination by the Ministry of Finance, of deficiencies or errors in the topographic chart, the administrator of the application shall be informed via the information system in order to make the necessary supplements or corrections within two (2) months, otherwise the application with the attached file with the studies and shall be made in the information system file.
+
|process_step_description=If the City Planning Agency finds omissions or errors in the survey diagram, the administrator of the submitted application will be notified through the information system so they can make the necessary additions or corrections within two (2) months; otherwise, the application with the attached dossier with the studies and supporting documents will be closed in the information system.
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 258: Line 265:
 
|process_step_previous_child_selector=8
 
|process_step_previous_child_selector=8
 
|process_step_previous_child=8
 
|process_step_previous_child=8
|process_step_title=Recheck Topographic Chart
+
|process_step_title=Re-checking of a survey diagram
|process_step_note=In the event of errors or deficiencies, the request shall be rejected.
+
|process_step_description=In the event of errors or omissions, the application will be rejected.
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 267: Line 274:
 
|process_step_previous_child_selector=9
 
|process_step_previous_child_selector=9
 
|process_step_previous_child=9
 
|process_step_previous_child=9
|process_step_title=Approval of the topographical diagram
+
|process_step_title=Approval of a survey diagram
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 275: Line 282:
 
|process_step_previous_child_selector=10
 
|process_step_previous_child_selector=10
 
|process_step_previous_child=10
 
|process_step_previous_child=10
|process_step_title=Check Cover Diagram
+
|process_step_title=Checking of a coverage diagram
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 283: Line 290:
 
|process_step_previous_child_selector=11
 
|process_step_previous_child_selector=11
 
|process_step_previous_child=11
 
|process_step_previous_child=11
|process_step_title=Deficiencies or errors in the Coverage Chart
+
|process_step_title=Omissions or errors in the coverage diagram
|process_step_description=In the case of determination by the Ministry of Finance of deficiencies or errors in the coverage diagram, the administrator of the application shall be informed via the information system in order to make the necessary supplements or corrections within two (2) months, otherwise the application with the attached file with the studies and shall be placed in the information system file.
+
|process_step_description=If the City Planning Agency finds omissions or errors in the coverage diagram, the administrator of the submitted application will be notified through the information system so that they can make the necessary additions or corrections within two (2) months; otherwise, the application with its attached dossier of studies and information will be closed in the information system.
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 292: Line 299:
 
|process_step_previous_child_selector=12
 
|process_step_previous_child_selector=12
 
|process_step_previous_child=12
 
|process_step_previous_child=12
|process_step_title=Recheck Coverage Diagram
+
|process_step_title=Re-checking of a coverage diagram
 
|process_step_official=Competent Employee
 
|process_step_official=Competent Employee
 
|process_step_implementation=Inspection
 
|process_step_implementation=Inspection
|process_step_duration_min=345600
+
|process_step_duration_min=P4D
|process_step_duration_max=345600
+
|process_step_duration_max=P4D
|process_step_description=Checking the corrected/completed coverage diagram
+
|process_step_description=The corrected/completed coverage diagram is checked.
|process_step_note=If the review of the corrected coverage diagram has not made the necessary corrections, the application shall be rejected.
+
|process_step_note=If the necessary corrections have not been made as of the re-checking of the corrected coverage diagram, the application will be rejected.
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 306: Line 313:
 
|process_step_previous_child_selector=13
 
|process_step_previous_child_selector=13
 
|process_step_previous_child=13
 
|process_step_previous_child=13
|process_step_title=Receipt Diagram Approval
+
|process_step_title=Approval of a coverage diagram
 
}}
 
}}
 
{{process steps
 
{{process steps
Line 314: Line 321:
 
|process_step_previous_child_selector=14
 
|process_step_previous_child_selector=14
 
|process_step_previous_child=14
 
|process_step_previous_child=14
|process_step_title=Pre-approved building permit
+
|process_step_title=Issuance of preliminary approval of building permit
 
}}
 
}}
 
{{process provision digital locations
 
{{process provision digital locations
|process_provision_digital_location_title=Electronic issue of building permits
+
|process_provision_digital_location_title=Electronic issuance of building permits
 
|process_provision_digital_location_url=https://web.tee.gr/e-adeies/anakoinoseis/
 
|process_provision_digital_location_url=https://web.tee.gr/e-adeies/anakoinoseis/
 
}}
 
}}

Latest revision as of 21:26, 3 November 2024



faec43d5-29e3-4c14-ae07-9c9dbb7f427b 893653 Προέγκριση οικοδομικής άδειας

At a glance

Points of service

Municipalities

Digital provision points

Number of required documents

5

Fees

20 €

Deadline of completion

6 months

Description

This procedure concerns the issuance of an administrative act granted to certify the right to issue a building permit / revision permit and the application, while it is valid, of its urban planning provisions and sizes (construction, coverage, height), which are in force at the time of issuance of the preliminary approval, provided that the building permit / revision permit is issued within the period of validity of the preliminary approval and subject to obtaining and submitting the required approvals provided for in Article 40(1)(b) of Law 4495/2017, during the building permit / revision permit issuance process.

Basic information

Competent body

MINISTRY OF ENVIRONMENT AND ENERGY

Authority/Public body’s Unit responsible for the institutional framework of the procedure


Provided to

Related links

Validity duration

1 year

Notes

The period of validity of the preliminary approval of the revision permit may not exceed the period of validity of the revision permit. By way of exception, if relating to modification of street and building lines or amendment of buildable areas in communal areas, as well as in cases of subsequent inclusion of the area under a cultural heritage or nature protection status, the preliminary approval shall certify the right to build, only at the time of its issue.

Last update

03/11/2024

Application

Application Type

Application

Submission by:

Submitted by the applicant (digital)

Submitted by:

Persons, Public bodies

Title

Application by the project owner or by the person with a legitimate right, together with the declarations of assignment of undertaking and supervising studies.

Notes:

The application is accompanied by the declaration of assignment of the project owner or of the person with a legitimate right and the declarations of assignment of undertaking and supervising studies of the engineers involved.

What you will need

Means of authentication, identification and signature

Engineering input codes in the digital services of the Technical Chamber of Commerce of Greece (TEI)

    Print

    Requirements

      Fees

        Related


        Means of redress or appeal:

        Hierarchical appeal/recourse

        Rules concerning a lack of reply from the competent authority and the legal consequences for the use:

        The appeal must be filed within a time limit of thirty (30) days from the notification or otherwise-obtained full knowledge of the act by the applicant by registering it with the City Planning Agency that issued the contested act.Other

        Pursuant to Article 23 of Law 4495/17, the Regional Councils for Urban Planning Issues and Disputes review the administrative appeals against enforceable acts or omissions of City Planning Agencies, which are issued during the issuance procedure of the preliminary approvals of building permits.

        Output & Results

        Output

        Administrative Act

        Steps

          Digital steps

            Other information

            Alternative titles

            Preliminary approval of building permit / revision permit

            Official title

            Preliminary approval of a building permit

            Languages supported

            Greek, English

            Legislation

              Categories

              Τype of procedure

              Trigger

              Applied for

              Trigger (submission method)

              Application (digital)

              Type

              Outgoing

              ,,,


            • 1 Possession of passwords to enter software Engineers are the sole applicants for the preliminary approval of a building permit and they must hold passwords to the digital services of the Technical Chamber of Greece.

              No No

            • 2 Administrative The preliminary approval procedure for the issuance of a building permit is optional and concerns all categories of permit issuance of Article 36 of Law 4495/17. The procedure for the preliminary approval of a revision permit is optional insofar as it concerns a change in urban planning sizes of coverage, height and volume. Alternatively, the written certification of Article 38(2)(b)(ba) and (bb) of Law 4495/17 is required.


              No No

            • 3 Administrative The preliminary approval of a building permit is compulsory in the following cases: a) Buildings with a surface area added to the structure of more than 3,000 m2 and additions to existing buildings with a total resulting surface area added to the structure of more than 3,000 m2. b) Where a building permit needs to be issued by services other than the City Planning Agency, a preliminary building approval is compulsory and is granted by the competent City Planning Agency. c) For the construction of permanent building facilities, projects of particular environmental and residential importance, or projects subject to special inspection as regards building regulations.


              No No

            • 4 Administrative The preliminary approval is issued exclusively by the competent City Planning Agency, unless more specific provisions provide otherwise. In this case, the survey diagram will be checked by the competent City Planning Agency and sent to the department responsible for issuing the preliminary approval. Investment plans that have been included in Strategic Investments in accordance with the relevant legislative framework on strategic investments.


              No No

            • 5 Administrative Preliminary approval is not required for investments that have been or are subject to Law 3986/2011 (Government Gazette, Series I, No 152).


              No No

            • 1 TCG state fee 20 €

              Cost Calculation One-off

              Method of Payment Bank cashier, Digital (debit / credit card), Digital (web banking)

              Type of Cost Impost

              No

            • 1 Survey diagram Drawings / studies by an engineer / architect

              Survey diagram

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons, Public bodies

              Notes: The survey diagram is dependent on the State coordinate system, in accordance with the applicable specifications, pursuant to Article 39 of Law 4495/2017 ‘Specifications for preparation of survey diagram and coverage diagram’.

              Document submitted under requirements: No


              No 5768

            • 2 Coverage diagram, in accordance with the applicable specifications Drawings / studies by an engineer / architect

              Coverage diagram, in accordance with the applicable specifications

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons, Public bodies

              Notes: The coverage diagram is prepared in accordance with Article 39 of Law 4495/2017 ‘Specifications for preparation of survey diagram and coverage diagram’.

              Document submitted under requirements: No


              No 5768

            • 3 Title deed Property titles

              Title deed

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons, Public bodies

              Notes: Title deed and a recent certificate of ownership or a cadastral map or extract of a cadastral map for each property.

              Document submitted under requirements: No


              No 2905

            • 4 Proof of legality of existing buildings Βuilding permit

              Proof of legality of existing buildings

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons, Public bodies

              Notes: Depending on the case, the proof of legality may be the issued building permits, engineer certificates in accordance with the provisions of Law 4495/2017, subjection to the law on unlawful construction, etc.

              Document submitted under requirements: No


              No 2243

            • 5 Technical report Technical report

              Technical report

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons, Public bodies

              Notes: A technical report that describes the project, sizes and uses with precision.

              Document submitted under requirements: No


              No 1068

            • Law 4495 2017 167 Α

              Description Control and protection of the Structured Environment and other provisions.

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20170100167

            • Law 4067 2012 79 Α

              Description New Building Regulation

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20120100079

            • Ministerial Decision 3046/304/1989 1989 59 Δ

              Description Building Regulation

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=19890400059

            • 1 Receipt of the application for preliminary approval of a building permit

              Responsible for Implementation Competent Directorate

              Μethod of Implementation Software action

              Description The competent City Planning Agency of the local municipality receives the relevant request of the engineer via the platform of the Technical Chamber of Greece, with the necessary supporting documents and designs attached.

              No No


            • 2 Checking of dossier completeness

              Responsible for Implementation Competent Employee

              Μethod of Implementation Software action

              Description The competent employee of the Municipal City Planning Agency checks the completeness of the dossier.

              Notes If the City Planning Agency finds omissions or errors, the administrator of the application is notified through the information system so that they can make the necessary additions or corrections within a time limit of two (2) months; otherwise, the application submitted with the attached dossier will be closed.

              No No


            • 3 Checking of title deed and survey diagram

              Responsible for Implementation Competent Employee

              Μethod of Implementation Inspection

              Description The title deed is checked to verify the integrity, buildability and time of segmentation of the plot or parcel of land, and the survey diagram is checked as regards compliance with general and specific urban planning provisions and specifications, as well as verification of the information included therein.

              No No


            • 4 Approval of a survey diagram

              Responsible for Implementation Competent Employee

              Μethod of Implementation Software action

              Description Following approval of the survey diagram, the dossier is forwarded for the purpose of checking the coverage diagram.

              Yes No


            • 5 Vetting of a coverage diagram

              Responsible for Implementation Competent Employee

              Μethod of Implementation Inspection

              Description The coverage diagram and any required relevant contribution form for parking space acquisition are checked with regard to compliance with the general and specific urban planning provisions and the specifications of the required data, described in Article 39 of Law 4495/17, as well as the proof of legality of existing buildings on the plot or parcel, which are produced under the responsibility of the engineer.

              Notes The checking of the proof of the legality of existing buildings on the plot or parcel involves the verification of the information included in the building permits already issued, as well as any declarations for subjection to the law on unlawful construction, and is limited to the correct matching of the sizes indicated in the plans of the building permits already issued and the plans accompanying declarations of subjection to laws on unlawful construction with those shown in the coverage diagram.

              Yes No


            • 6 Approval of a coverage diagram

              Responsible for Implementation Competent Employee

              Μethod of Implementation Software action


              Yes No


            • 7 Issuance of preliminary approval of building permit

              Responsible for Implementation Competent Employee

              Μethod of Implementation Software action

              Description The administrative act of preliminary approval is issued and the necessary studies, approvals and other supporting documents to be submitted for the issuance of the building permit are determined.

              Yes Yes


            • 8 Omissions or errors in a survey diagram


              Description If the City Planning Agency finds omissions or errors in the survey diagram, the administrator of the submitted application will be notified through the information system so they can make the necessary additions or corrections within two (2) months; otherwise, the application with the attached dossier with the studies and supporting documents will be closed in the information system.

              Yes No


            • 9 Re-checking of a survey diagram


              Description In the event of errors or omissions, the application will be rejected.

              Yes No


            • 10 Approval of a survey diagram



              Yes No


            • 11 Checking of a coverage diagram



              Yes No


            • 12 Omissions or errors in the coverage diagram


              Description If the City Planning Agency finds omissions or errors in the coverage diagram, the administrator of the submitted application will be notified through the information system so that they can make the necessary additions or corrections within two (2) months; otherwise, the application with its attached dossier of studies and information will be closed in the information system.

              Yes No


            • 13 Re-checking of a coverage diagram

              Responsible for Implementation Competent Employee

              Μethod of Implementation Inspection

              Description The corrected/completed coverage diagram is checked.

              Notes If the necessary corrections have not been made as of the re-checking of the corrected coverage diagram, the application will be rejected.

              Yes No


            • 14 Approval of a coverage diagram



              Yes No


            • 15 Issuance of preliminary approval of building permit



              Yes Yes



            • Cookies help us deliver our services. By using our services, you agree to our use of cookies.