Notification of operation of outdoor parking facilities for cars, motorcycles and mopeds

From National Registry of Administrative Public Services



5d6c907c-7e2b-4a48-8400-b62df9298806 438588

At a glance

Points of service

Digital provision points

    Remote Points of service

    Number of required documents

    11 to 22

    Fees

    0
    -
    100

    Estimated time

    5 Days

    Description

    This procedure relates to the content and procedure for notifying the operation of outdoor parking facilities for cars, motorcycles and mopeds, the supporting documents to be held at the place where the activity is carried on, the method for notifying information in the case of an impending change, the authorities to which the notification is to be sent and the changes made.

    Basic information

    Related links

    Authority/Public body’s Unit responsible for the institutional framework of the procedure

    DIRECTORATE-GENERAL OF TECHNICAL CONTROL AND ESTABLISHMENTS OF VEHICLES (D35)

    Notes

    The procedure is implemented by the Transport and Communications Directorates of the relevant Regional Units of Greece.

    Validity Duration

    Αόριστη

    Last update

    Application

    Application Type

    Notification/Announcement

    Submission by:

    Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

    Submitted by:

    Legal entities, Persons

    Title

    Notification of commencement of operation or notification of operation due to changes in aspects of the activity without the operator of the activity changing.

    Notes:

    Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notification of a change in the details of the activity (other than the change of operator of the activity).

    What you will need

    Means of authentication, identification and signature

    Identification document, Identification with TAXISnet codes

      Print

      Requirements

        Fees

          Output & Results

          Output

          Digital document production, Document Production

          Steps

            Digital steps

              Other information

              Official title

              Notification of operation of outdoor parking facilities for cars, motorcycles and mopeds

              Languages supported

              English

              Ways of provision

              Establishment

              Legislation

                Categories

                Τype of procedure

                Trigger

                Notification/Announcement

                Trigger (submission method)

                Application (digital), Application (handwritten)

                Type

                Outgoing
                N1

                ,,


              • 1 Company law Setting up a business (sole proprietorship, partnership).
                • See the link below on setting up a company

                No No

              • 2 Possession of passwords to enter software The applicant must have TAXISnet codes

                No No

              • 3 Administrative No supporting documents need be submitted at the time the notification is submitted. This covers both the initial notification and subsequent changes. The operator of the activity is obliged to keep a dossier with the supporting documents required in each case along with proof of submission of all notifications at the place where the activity is carried on.


                No No

              • 4 Technical The holder of a master oxyacetylene welder class II licence (first part) must have acquired 6 months of experience as an arc welder technician in order for approval to be given for their participation in examinations to acquire a master arc welder class II licence. Where the person concerned has attended a special vocational training course, the previous experience required may be replaced by up to 25% attendance at one or more special vocational training courses after a valid licence is issued.


                No No

              • 1 EUR 100.00 for submitting the initial notification about the outdoor parking facility for cars, motorcycles and mopeds. No fees need be paid for notification of termination of operations, change of the operator or change in any other notified information other than the place where the activity is carried on. Until the e-fee scheme is activated, the fee for notifying the commencement of operations shall be paid by persons concerned to the tax office and the double-entry receipt issued by the tax office shall constitute proof of payment of the fee (in accordance with Circular No 17403/2022 of the Ministry of Infrastructure and Transport, Online Publication No 6ΟΘΧ465ΧΘΞ-ΔΔΓ) 0 € - 100 €

                Cost Calculation One-off

                Method of Payment Bank cashier, Digital (debit / credit card), Digital (web banking), Tax Office cashier

                Type of Cost e-Administrative Fee

                No

              • 1 Proof of submission of the notification Certificate

                Proof of submission of the notification

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notification of a change in the details of the activity (other than the change of operator of the activity).

                Document submitted under requirements: No


                No 9703

              • 2 A printout of personalised information from myAADE showing the start date of the outdoor parking facility Tax certificates

                A printout of personalised information from myAADE showing the start date of the outdoor parking facility

                Relevant link: https://www.myaade.gr/

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: Required when submitting an initial (new) notice of commencement of operation of the outdoor parking facility.

                Document submitted under requirements: No


                No 7140

              • 3 A premises main use certificate issued by a private engineer in accordance with Article 107(8) of Law 4495/2017 stating the precise location of the property, the total area of the main premises and any annexes to them, a land use certificate from the local Construction Service, accompanied by I) copies of all public documents demonstrating legality from a planning viewpoint (building permit, revision or updating of the building permit, approval of small-scale construction works, decision on exemption from demolition, legalisation permit, certificate of completion of the procedure for inclusion within the provisions suspending the imposition of sanctions or confirmation of payment of 30% of the uniform special fine, etc.); and II) copies of approved floor plans for the area where the outdoor parking facility for cars, motorcycles and mopeds is to be operated, which show all areas. Certificate

                A premises main use certificate issued by a private engineer in accordance with Article 107(8) of Law 4495/2017 stating the precise location of the property, the total area of the main premises and any annexes to them, a land use certificate from the local Construction Service, accompanied by I) copies of all public documents demonstrating legality from a planning viewpoint (building permit, revision or updating of the building permit, approval of small-scale construction works, decision on exemption from demolition, legalisation permit, certificate of completion of the procedure for inclusion within the provisions suspending the imposition of sanctions or confirmation of payment of 30% of the uniform special fine, etc.); and II) copies of approved floor plans for the area where the outdoor parking facility for cars, motorcycles and mopeds is to be operated, which show all areas.

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notification of a change in the details of the activity (other than the change of operator of the activity). Not required for notification of a change in the operator of the activity.

                Document submitted under requirements: No


                No 9703

              • 4 A solemn declaration in the format required by Law 1599/1986 from the operator that they are entitled to use the plot or lot to operate an outdoor parking facility for cars, motorcycles and mopeds. Solemn Declaration

                A solemn declaration in the format required by Law 1599/1986 from the operator that they are entitled to use the plot or lot to operate an outdoor parking facility for cars, motorcycles and mopeds.

                Relevant link: https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Relevant Procedure: Solemn declaration and electronic solemn declaration

                Notes: Required when submitting an initial (new) notice of commencement of operations at the outdoor parking facility.

                Document submitted under requirements: No


                No 7320

              • 5 Approval of the road connection in accordance with the terms and conditions of Royal Decree 465/1970. Approval

                Approval of the road connection in accordance with the terms and conditions of Royal Decree 465/1970.

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: Where the parking facility is established in an area outside an approved town plan. Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notice of change in the particulars of the activity (apart from a change in the operator of the activity) where the change affects the facilitys road connection. Not required for notification of a change in the operator of the activity.

                Document submitted under requirements: Yes

                Document’s requirement: Geographical

                No 8880

              • 6 A solemn declaration from the engineer responsible in law that the approved road connection for the activity was implemented in accordance with the approved plans Solemn Declaration

                A solemn declaration from the engineer responsible in law that the approved road connection for the activity was implemented in accordance with the approved plans

                Relevant link: https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Relevant Procedure: Solemn declaration and electronic solemn declaration

                Notes: It must be submitted when a parking facility is established in an area outside an approved town plan. Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notice of change in the particulars of the activity (apart from a change in the operator of the activity) where the change affects the facilitys road connection. Not required for notification of a change in the operator of the activity.

                Document submitted under requirements: Yes

                Document’s requirement: Geographical

                No 7320

              • 7 A technical report from the competent engineer describing the layout of the site, its equipment, specifications, electrical facilities and the standards followed and the practices adopted. Report

                A technical report from the competent engineer describing the layout of the site, its equipment, specifications, electrical facilities and the standards followed and the practices adopted.

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: This includes a certificate from the competent engineer in law that the activity is in accordance with Presidential Decree 455/1976 (Government Gazette 169, Series I) as in force. Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notification of a change in the details of the activity (other than the change of operator of the activity). Not required for notification of a change in the operator of the activity.

                Document submitted under requirements: No


                No 6631

              • 8 Floor plans of the parking facility’s various areas accompanying the technical report from the competent engineer (supporting document No 7) which show: 1. general and operational layout of the parking facility (entrances/exits, corridors, parking areas, etc.), fencing, auxiliary areas; 2. horizontal and vertical signage for the parking facility both at the entrances/exits and within the parking facility; and 3. electrical facilities at the parking facility where the parking facility operates after 18.00. Drawings/studies by an engineer/architect

                Floor plans of the parking facility’s various areas accompanying the technical report from the competent engineer (supporting document No 7) which show: 1. general and operational layout of the parking facility (entrances/exits, corridors, parking areas, etc.), fencing, auxiliary areas; 2. horizontal and vertical signage for the parking facility both at the entrances/exits and within the parking facility; and 3. electrical facilities at the parking facility where the parking facility operates after 18.00.

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notification of a change in the details of the activity (other than the change of operator of the activity). Not required for notification of a change in the operator of the activity.

                Document submitted under requirements: No


                No 5768

              • 9 A survey diagram of the area accompanying the technical report from the competent engineer (supporting document No 7) showing the points of interest and distances between the outdoor parking facility and those points of interest, in order to ascertain compliance with the minimum safety distances specified in the relevant legislation on outdoor parking facilities. Drawings/studies by an engineer/architect

                A survey diagram of the area accompanying the technical report from the competent engineer (supporting document No 7) showing the points of interest and distances between the outdoor parking facility and those points of interest, in order to ascertain compliance with the minimum safety distances specified in the relevant legislation on outdoor parking facilities.

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notification of a change in the details of the activity (other than the change of operator of the activity). Not required for notification of a change in the operator of the activity.

                Document submitted under requirements: No


                No 5768

              • 10 Decision on application of Standard Environmental Commitments (SEC). Environmental Compliance Receipt

                Decision on application of Standard Environmental Commitments (SEC).

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: In accordance with the provisions of Joint Ministerial Decision No 170078/ 7-10-2013 (Government Gazette, Series II, No 2507) for outdoor parking facilities with a total number of parking spaces Θ of between 200 and 500 (200≤Θ<500) or approval of environmental terms and conditions by the competent department in accordance with Ministerial Decision No ΔΙΠΑ/οικ.37674/2016 (Government Gazette, Series II, No 2471) for parking facilities with a total number of parking spaces Θ greater than 500 (Θ≥500). Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notification of a change in the details of the activity (other than the change of operator of the activity). This supporting document is not required if the number of parking spaces Θ is less than 200 (Θ<200).

                Document submitted under requirements: Yes

                Document’s requirement: Professional

                No 9681

              • 11 A solemn declaration from the supplier of the parking facilitys fire extinguishers to procure the necessary number of fire extinguishers: one (1) fire extinguisher of at least 6 kg for every ten (10) parking spaces. Solemn Declaration

                A solemn declaration from the supplier of the parking facilitys fire extinguishers to procure the necessary number of fire extinguishers: one (1) fire extinguisher of at least 6 kg for every ten (10) parking spaces.

                Relevant link: https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Relevant Procedure: Solemn declaration and electronic solemn declaration

                Notes: Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notification of a change in the details of the activity (other than the change of operator of the activity).

                Document submitted under requirements: No


                No 7320

              • 12 A solemn declaration in the format required by Law 1599/1986 from the engineer competent in law that one (1) fire extinguisher of at least 6 kg has been installed at the parking facility for every ten (10) parking spaces. Solemn Declaration

                A solemn declaration in the format required by Law 1599/1986 from the engineer competent in law that one (1) fire extinguisher of at least 6 kg has been installed at the parking facility for every ten (10) parking spaces.

                Relevant link: https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Relevant Procedure: Solemn declaration and electronic solemn declaration

                Notes: Required when submitting an initial (new) notification of commencement of operation of an outdoor parking facility or when submitting a notification of a change in the details of the activity (other than the change of operator of the activity). Not required for notification of a change in the operator of the activity.

                Document submitted under requirements: No


                No 7320

              • 13 Proof of payment of the fee amount Proof of payment / Receipt

                Proof of payment of the fee amount

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: Only in the case of initial notification and not for a change in the particulars of the notification.

                Document submitted under requirements: No


                No 7053

              • 14 A certificate that the outdoor parking facility has been entered in the Ministry of Infrastructure and Transports Digital Register in accordance with Ministerial Decision No 59388/940/2020 (Government Gazette, Series II, No 5407). Certificate

                A certificate that the outdoor parking facility has been entered in the Ministry of Infrastructure and Transports Digital Register in accordance with Ministerial Decision No 59388/940/2020 (Government Gazette, Series II, No 5407).

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons


                Document submitted under requirements: No


                No 9703

              • 15 Notification from the old operator of the activity in the case where the operator of the activity changes Notification/Announcement

                Notification from the old operator of the activity in the case where the operator of the activity changes

                Submission by: Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

                Submitted by: Legal entities, Persons

                Notes: When notifying a change of operator. The notification only relates to information about the operator of the activity and must be submitted to the Transport and Communications Directorate of the relevant Regional Unit within 10 days of the change.

                Document submitted under requirements: Yes

                Document’s requirement: Administrative

                No 5743

              • 16 Notification from the new operator of the activity in the case where the operator of the activity changes Notification/Announcement

                Notification from the new operator of the activity in the case where the operator of the activity changes

                Submission by: Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

                Submitted by: Legal entities, Persons

                Notes: When notifying a change of operator. The notification only relates to information about the operator of the activity and must be submitted to the Transport and Communications Directorate of the relevant Regional Unit within 10 days of the change.

                Document submitted under requirements: Yes

                Document’s requirement: Administrative

                No 5743

              • 17 Proof of submission of the old operators notification Certificate

                Proof of submission of the old operators notification

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: When notifying a change of operator.

                Document submitted under requirements: Yes

                Document’s requirement: Administrative

                No 9703

              • 18 Proof of submission of the notification from the new operator of the activity Certificate

                Proof of submission of the notification from the new operator of the activity

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: When notifying a change of operator.

                Document submitted under requirements: No

                Alternative document of: 2

                Yes 9703

              • 19 A printout of personalised information from myAADE showing the start date of operations at the outdoor parking facility under the new operator. Tax certificates

                A printout of personalised information from myAADE showing the start date of operations at the outdoor parking facility under the new operator.

                Relevant link: https://www.myaade.gr/

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: When notifying a change which entails a change in the person carrying on the activity only.

                Document submitted under requirements: Yes

                Document’s requirement: Tax

                No 7140

              • 20 A solemn declaration in the format required by Law 1599/1986 from the new operator that they are entitled to use the plot or lot and operate it as an outdoor parking facility for cars, motorcycles and mopeds. Solemn Declaration

                A solemn declaration in the format required by Law 1599/1986 from the new operator that they are entitled to use the plot or lot and operate it as an outdoor parking facility for cars, motorcycles and mopeds.

                Relevant link: https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Relevant Procedure: Solemn declaration and electronic solemn declaration

                Notes: When notifying a change which entails a change in the person carrying on the activity only.

                Document submitted under requirements: Yes

                Document’s requirement: Administrative

                No 7320

              • 21 Decision on application of Standard Environmental Commitments (SEC). Environmental Compliance Receipt

                Decision on application of Standard Environmental Commitments (SEC).

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: In accordance with the provisions of Joint Ministerial Decision No 170078/7-10-2013 (Government Gazette, Series II, No 2507) for outdoor parking facilities with a total number of parking spaces Θ of between 200 and 500 (200≤Θ<500) in the name of the new operator or approval of environmental terms and conditions by the competent department in accordance with Ministerial Decision No ΔΙΠΑ/οικ.37674/2016 (Government Gazette, Series II, No 2471) for parking facilities with a total number of parking spaces Θ greater than 500 (Θ≥500) in the name of the new operator. When notifying a change which entails a change in the person carrying on the activity only. This supporting document is not required if the number of parking spaces Θ is less than 200 (Θ<200).

                Document submitted under requirements: Yes

                Document’s requirement: Professional

                No 9681

              • 22 A solemn declaration from the supplier of the parking facilitys fire extinguishers to procure the necessary number of fire extinguishers: one (1) fire extinguisher of at least 6 kg for every ten (10) parking spaces Solemn Declaration

                A solemn declaration from the supplier of the parking facilitys fire extinguishers to procure the necessary number of fire extinguishers: one (1) fire extinguisher of at least 6 kg for every ten (10) parking spaces

                Relevant link: https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Relevant Procedure: Solemn declaration and electronic solemn declaration

                Notes: When notifying a change which entails a change in the person carrying on the activity only.

                Document submitted under requirements: Yes

                Document’s requirement: Administrative

                No 7320

              • 23 Certificate of registration of the fields relevant to the change of operator in the Digital Register of outdoor parking facilities maintained by the Ministry of Infrastructure and Transport in accordance with Ministerial Decision No 59388/940/2020 (Government Gazette, Series II, No 5407. Certificate

                Certificate of registration of the fields relevant to the change of operator in the Digital Register of outdoor parking facilities maintained by the Ministry of Infrastructure and Transport in accordance with Ministerial Decision No 59388/940/2020 (Government Gazette, Series II, No 5407.

                Submission by: Keep within business establishment

                Submitted by: Legal entities, Persons

                Notes: When notifying a change which entails a change in the person carrying on the activity only. After notification of a change in the operator of the activity is submitted, it shall be kept at the place where the activity is carried on.

                Document submitted under requirements: Yes

                Document’s requirement: Administrative

                No 9703

              • Presidential Decree 27, 28, 29 455 1976 169 Α

                Description On the terms and conditions for establishing and running car parks and car washes, grease stations and petrol stations within them, and the conditions for granting the requisite licences.

                Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=19760100169

              • Law 4014 2011 209 Α

                Description Environmental licensing of projects and activities, regulation of planning violations in conjunction with the establishment of an environmental balance and other provisions within the remit of the Ministry of the Environment.

                Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20110100209

              • Joint Ministerial Decision 170078 2013 2507 Β

                Description Standard Environmental Commitments for projects and activities belonging to Category B of Group 6 ‘Tourism facilities and urban development, building, sports and leisure projects’ with Ser. Nos 15, 16, 17, 19, 20, 21, 22, 23, 24 and 25 of Annex VI to Ministerial Decision No 1958/2012 (Government Gazette, Series II, No 21)

                Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20130202507

              • Law 4442 2016 230 Α

                Description New institutional framework for the exercise of economic activity, and other provisions.

                Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20160100230

              • Ministerial Decision 59388/940 2020 5407 Β

                Description Establishment of terms and conditions for the creation, development, operation and maintenance of a digital register of operational repair shops and their managing technicians, vehicle stations, lubrication bays, washes and other relevant vehicle service facilities, and all other necessary details.

                Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20200205407

              • Joint Ministerial Decision 315162 2021 5273 Β

                Description Establishment of the procedure, content and supporting documents, fee and sanctions concerning the notification of operation of parking facilities for cars, motorcycles and mopeds

                Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20210205273

              • 1 Launching of procedure



                No No


              • 2 Submission of notification of commencement of operation/notification of change of data


                Μethod of Implementation Manual Action

                Description Interested parties must submit the notification of commencement of operation / notification of change of data, via the Integrated Information System for the Exercise of Activities and Audits (OPS-ADE), to the Transport and Communications Service of the regional unit concerned. Until the OPS-ADE becomes operational, as to the part concerning notification of the activity, the notification of commencement of operation / notification of change of data shall be submitted in hard copy or electronic form either directly to the competent authority or to any physical or electronic Citizen Service Centre (KEP) operating as a Single Service Centre (EKE).

                Notes Notification of commencement of operation / Notification of change of data

                Yes No


              • 3 Issuance of proof of submission

                Responsible for Implementation Competent Employee

                Μethod of Implementation Manual Action

                Description An officer from the Registry Office of the competent regional unit or Citizen Service Centre / Single Service Centre will receive and register the application / solemn declaration with the necessary supporting documents attached, and issue a reference number to the interested party or a Request Submission Certificate, as applicable (issued by the Registry Office of the competent regional unit / Citizen Service Centre/Single Service Centre).

                Notes Notification of commencement of operation/Notification of change of data.

                Yes No


              • 4 Disclosure of notification

                Responsible for Implementation Competent Employee

                Μethod of Implementation Manual Action

                Description The Transport and Communications Service of the competent regional unit shall disclose the notification of commencement of operation/notification of change of data to the competent audit authorities.

                Notes Notification of commencement of operation/Notification of change of data

                Yes Yes


              • 5 Submission of notification concerning changes of operator


                Μethod of Implementation Manual Action

                Description In the event of a change in the operator of an activity following transfer of ownership or of the right to operate the activity to another operator, both the new and the old operator must inform the Transport and Communications Service of the competent regional unit of this change within 10 days via the Integrated Information System for the Exercise of Activities and Audits (OPS-ADE). Until the OPS-ADE becomes operational, the notification shall be submitted to the Transport and Communications Service of the competent regional unit. Alternatively, notification may take place via post or email. In this case, the date of notification shall be considered to be the date the letter is received (via post or e-mail) by the Transport and Communications Service of the competent regional unit.

                Notes Change of operator in accordance with Article 9 of Law 4442/2016.

                Yes No


              • 6 Issuance of proof of submission

                Responsible for Implementation Competent Employee

                Μethod of Implementation Manual Action

                Description The Transport and Communications Service of the competent regional unit shall take receipt of the change of notification and provide the interested party with proof of submission.

                Notes Change of operator in accordance with Article 9 of Law 4442/2016

                Yes No


              • 7 Disclosure of notification

                Responsible for Implementation Competent Employee

                Μethod of Implementation Manual Action

                Description The Transport and Communications Service of the competent regional unit shall disclose the notification to the competent audit authorities.

                Notes Change of operator in accordance with Article 9 of Law 4442/2016.

                Yes Yes


              • EUGO portal (only information)
              • Cookies help us deliver our services. By using our services, you agree to our use of cookies.