Issuance of a Licence for the Establishment of an Elderly Care Unit (ECU) by a natural or legal person

From National Registry of Administrative Public Services
Revision as of 14:43, 24 March 2023 by Api-bot (talk | contribs)



0da8a3ea-6ba8-4796-b617-dd105a52b3e5 494538 Άδεια Ίδρυσης Μονάδας Φροντίδας Ηλικιωμένων

At a glance

Points of service

Points of Single Contact (ΚΕΠ – EKE), Regional units, Directorate of Public Health and Social Welfare of the competent Regional Unit

Digital provision points

Remote Points of service

Number of required documents

5 + (
1
)

Fees

Provided without cost

Deadline of completion

2 months

Description

The procedure concerns the licensing of the establishment of Elderly Care Units of a profit-making nature. It is addressed to companies and legal persons.

Basic information

Competent body

MINISTRY OF LABOR AND SOCIAL SECURITY

Authority responsible for the provision of the procedure

MINISTRY OF LABOR AND SOCIAL SECURITY

Service / organizational unit of a authority entity

Regional General Directorates of Public Health and Social Care, Regional Directorates of Public Health and Social Welfare, Regional Departments of Social Solidarity

Related links


Application

Application Type

Application

Submission by:

Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

Submitted by:

Legal entities, Persons

Title

Submission of Application – Solemn declaration in which the natural or legal person lists its details (or those of the legally responsible representative person), the name, the location, the number of beds and the specific purpose of the operation.

What you will need

Means of authentication, identification and signature

Identification document, Identification with TAXISnet codes

    Print

    Requirements

      Fees

        Related


        Means of redress or appeal:

        Other Administrative redress

        Rules concerning a lack of reply from the competent authority and the legal consequences for the use:

        Tacit approval

        In case no response has been provided before the above deadline, it is considered that the application of the interested party has been implicitly accepted (tacit approval) and the license has been issued, according to par. 4 of article 14 of Law 3844/2010 (GG 63/A/2010). The applicant, in the aforementioned case of tacit approval, may request a relevant certificate from the administrative authority responsible for issuing the act, in accordance with paragraph 4 of article 10 of 3230/2004 (Government Gazette 44/A/2004).

        NACE

        • 88.1 Social work activities without accommodation for the elderly and disabled

        Output & Results

        Output

        Document Production

        Steps

          Digital steps

            Other information

            Official title

            Issuance of a Licence for the Establishment of an Elderly Care Unit (ECU) by a natural or legal person

            Languages supported

            English

            Ways of provision

            Establishment

            Legislation

              Categories

              Τype of procedure

              Trigger

              Applied for

              Trigger (submission method)

              Application (digital), Application (handwritten)

              Type

              Outgoing
              N1

              ,,


            • 1 Company law Business formation (individual, corporate)
              • For company establishment see the link below

              No No

            • 2 Possession of passwords to enter software The applicant shall have a TAXISnet username and password.

              No No

            • 3 Conditions for non-commission of criminal offenses The interested party shall not have been irrevocably sentenced to any sentence, for a felony or for any of the misdemeanours of theft, embezzlement, fraud, extortion, forgery, defamation, falsification or violation of drug law, or for any crime relating to the mores, nor have been deprived of his/her civil rights due to any punishable act and for as long as this deprivation lasts.


              No No

            • 4 Urban planning Issue of building licence in accordance with circular 98 of the Ministry of Infrastructure and Transports with document reference number (“protocol number”) oik 82070/22-12-1989 on the preparation of studies, as it is in force each time.


              No No

            • 5 Urban planning Observance of the provisions of article 5 of the General Building Regulation Law 1577/1985, as amended and in force, regarding the building licence for new use. In the case of an arrangement or expansion to an existing building, the legality of the building shall be documented, according to article 23, par.1 of the General Building Regulation (Law 1577/1985) as in force.


              No No

            • 6 Technical The ECUs are subject to the provisions: 1. Of the Building Regulation in Usage class “Health and Social Welfare”. 2. Of the New Building Fire Protection Regulation in usage class “Use H” 3. The design and configuration of the ECU spaces shall take into account the “Regulation on the elimination of architectural obstacles from Health and Welfare buildings, to facilitate their usage by disabled persons and persons of reduced mobility”.


              No No

            • 7 Urban planning The plot of the ECU shall meet the conditions on land usage of the urban planning legislation in force; it shall be at least 300m away from the perimeter of an approved industrial zone, noisy workshops and generally unsanitary and annoying facilities, as these are characterized by the competent Committee established by law, in accordance with sanitary provisions in force and it shall be served by the drinking water, electricity, and telephone networks.


              No No

            • 1 Extract from general purpose criminal record, of the person in whose name the license will be issued, of a validity of three months, or an equivalent document when the applicant is a national of another member-state of the EU. Criminal Record Copy for General Use

              Extract from general purpose criminal record, of the person in whose name the license will be issued, of a validity of three months, or an equivalent document when the applicant is a national of another member-state of the EU.

              Relevant link: https://www.e-pronoia.gr/content/diadikasies-dikaiologitika

              Submission by: Ex officio (manual), Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

              Submitted by: Legal entities, Persons

              Notes: When issued by domestic authorities, this is sought by the ex officio procedure.

              Document submitted under requirements: No


              No 4750

            • 2 Complete land surveying drawing Drawings/studies by an engineer/architect

              Complete land surveying drawing

              Relevant link: https://www.e-pronoia.gr/content/diadikasies-dikaiologitika

              Submission by: Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

              Submitted by: Legal entities, Persons

              Notes: When issued by domestic authorities, this is sought by the ex officio procedure.

              Document submitted under requirements: No


              No 5768

            • 3 A Series of architectural drawings. Drawings/studies by an engineer/architect

              A Series of architectural drawings.

              Relevant link: https://www.e-pronoia.gr/content/diadikasies-dikaiologitika

              Submission by: Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

              Submitted by: Legal entities, Persons


              Document submitted under requirements: No


              No 5768

            • 4 Building licence Official document

              Building licence

              Relevant link: https://www.e-pronoia.gr/content/diadikasies-dikaiologitika

              Submission by: Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

              Submitted by: Legal entities, Persons


              Document submitted under requirements: No


              No 6440

            • 5 Two copies of a Technical Report by an engineer. Drawings/studies by an engineer/architect

              Two copies of a Technical Report by an engineer.

              Relevant link: https://www.e-pronoia.gr/content/diadikasies-dikaiologitika

              Submission by: Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

              Submitted by: Legal entities, Persons

              Notes: The technical report shall include: 1. The description of the plot accessibility 2. The state of the access roads and the stage of progress of the application of the urban plan. 3. The possibility and adequacy of water and electricity supply, telephone connection and drainage. 4. The table of finishings of the spaces and, more generally, the construction mode of the building and the number of persons being served by the ECU, as well as a complete functional description.

              Document submitted under requirements: No


              No 5768

            • 6 Solemn declaration of Law 1599/1986 of the person in whose name the licence shall be issued, in which compliance with Article 2, par. A, sub-paragraph 2, shall be explicitly stated. Solemn Declaration

              Solemn declaration of Law 1599/1986 of the person in whose name the licence shall be issued, in which compliance with Article 2, par. A, sub-paragraph 2, shall be explicitly stated.

              Relevant link: https://www.e-pronoia.gr/content/diadikasies-dikaiologitika

              Submission by: Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

              Submitted by: Legal entities, Persons

              Relevant Procedure: ΔΔ:ΔΔ:Solemn declaration and electronic solemn declaration

              Notes: The technical report shall include: 1. The description of the plot accessibility 2. The state of the access roads and the stage of progress of the application of the urban plan. 3. The possibility and adequacy of water and electricity supply, telephone connection and drainage. 4. The table of finishings of the spaces and, more generally, the construction mode of the building and the number of persons being served by the ECU, as well as a complete functional description.

              Document submitted under requirements: No


              No 7320

            • 7 Solemn declaration of Law 1599/1986 of the person in whose name the licence shall be issued, in which compliance with Article 2, par. A, sub-paragraph 2, shall be explicitly stated. Solemn Declaration

              Solemn declaration of Law 1599/1986 of the person in whose name the licence shall be issued, in which compliance with Article 2, par. A, sub-paragraph 2, shall be explicitly stated.

              Relevant link: https://www.e-pronoia.gr/content/diadikasies-dikaiologitika

              Submission by: Submitted by the applicant (digital), Submitted by the applicant (in person or by post)

              Submitted by: Legal entities, Persons

              Relevant Procedure: ΔΔ:ΔΔ:Solemn declaration and electronic solemn declaration

              Document submitted under requirements: No


              No 7320

            • Law 2345 1995 213 Α

              Description About ECU: Amended as follows: - ν. 4756/2020 (A 235) par. 1 of Article 3 - Amendment of paragraph 1 and 2 of Article 2 of Law No. 2345/1995 (Right to submit an application) - ν. 4052/2012 (A 41) par. 23 Article 37 - Amendment of para. 7 Article 1 of Law No. 2345/1995 (Amendments to permits) - ν. 3852/2010 (A 87) subpara. 22 par. 3 Article 94 - Amendment of para. 1 to 3 of Art. 1 f Law No. 2345/1995 (Right to submit an application) - M.D. P.4b/oik.6022/1995 (B΄ 1052) - Amendment of par. 4 Article 1 of Law No. 2345/1995 (Supervision of ECU).

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=19950100213

            • Joint Ministerial Decision Π1γ/ΓΠοικ.123831 2011 2661 Β

              Description Prerequisites, Supporting documents, Membership in KEP - EKE

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20110202661

            • Ministerial Decision Π1γ/οικ.81551 2007 1136 Β

              Description Prerequisites, Evidence to be submitted, Checks, Operation

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20070201136

            • Ministerial Decision Π4Β/οικ.4690 1996 833 Β

              Description Prerequisites, Evidence to be submitted, Checks, Operation

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=19960200833

            • Ministerial Decision Π4Β/οικ.3176 1996 455 Β

              Description Prerequisites, Evidence to be submitted, Checks, Operation

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=19960200455

            • Other 25/VII 2012 2618 Β

              Description Decision of the E-Competition Committee

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20120202618

            • 1 Submission of architectural plans

              Responsible for Implementation Other

              Μethod of Implementation Manual Action

              Description The interested party submits the architectural plans to the Protocol Office of the Directorate of Public Health and Social Welfare in order to be checked and validated for their functionality.

              Notes Phase A

              No No


            • 2 Submission of supporting documents

              Responsible for Implementation Other

              Μethod of Implementation Manual Action

              Description After the receipt of the certified architectural plans, the interested party submits the required supporting documents to the Protocol Office of the Directorate of Public Health and Social Welfare.

              Notes Phase B

              No No


            • 3 Notification to the interested party about the receipt of the licence

              Responsible for Implementation Competent Employee

              Μethod of Implementation Manual Action

              Description The employee of the Department notifies the interested party to collect the Licence of Establishment.

              Notes Phase B

              No Yes



            • Cookies help us deliver our services. By using our services, you agree to our use of cookies.