Line 7: |
Line 7: |
| |process_org_owner_is_private=No | | |process_org_owner_is_private=No |
| |process_org_owner=33281 | | |process_org_owner=33281 |
− | |process_provision_org_owner_directory=ΔΙΕΥΘΥΝΣΗ ΤΕΧΝΙΚΟΥ ΕΛΕΓΧΟΥ ΚΑΙ ΕΓΚΑΤΑΣΤΑΣΕΩΝ ΕΞΥΠΗΡΕΤΗΣΗΣ ΟΧΗΜΑΤΩΝ (Δ35) | + | |process_provision_org_owner_directory=164608 |
| |process_provision_org_group=5587 | | |process_provision_org_group=5587 |
| |process_remarks=A Register of Fuel and Energy Supply Stations pursuant to decision No 7135/81/29-1-2019 (Government Gazette, Series II, No 714) laying down the terms and conditions for the establishment, development, operation and maintenance of a digital register of service stations for the supply of fuel and energy, liquid and gaseous fuel, covered car parks with fuel pumps, and all types of public and private service stations. The establishment licence shall be valid for two (2) years and may be extended for a further two (2) years. When changes are made during the period of validity of the licence to the originally approved plans for the installation of the ‘port service station’, the procedure for amending the original permit shall be followed. | | |process_remarks=A Register of Fuel and Energy Supply Stations pursuant to decision No 7135/81/29-1-2019 (Government Gazette, Series II, No 714) laying down the terms and conditions for the establishment, development, operation and maintenance of a digital register of service stations for the supply of fuel and energy, liquid and gaseous fuel, covered car parks with fuel pumps, and all types of public and private service stations. The establishment licence shall be valid for two (2) years and may be extended for a further two (2) years. When changes are made during the period of validity of the licence to the originally approved plans for the installation of the ‘port service station’, the procedure for amending the original permit shall be followed. |
| + | |process_deadline_duration=2592000 |
| |process_provided_language=English, Greek | | |process_provided_language=English, Greek |
| |process_evidence_identification_type=Identification document | | |process_evidence_identification_type=Identification document |
Line 22: |
Line 23: |
| |process_sdg_lack_of_response_rule=Tacit approval | | |process_sdg_lack_of_response_rule=Tacit approval |
| |process_sdg_notes=1. An appeal may be lodged against this decision by anyone with a legitimate interest before the Coordinator of the Decentralized Administration concerned, within fifteen (15) days of their becoming aware of the decision, in accordance with Articles 227 and 228 of Law 3852/2010 (Government Gazette, Series I, No 87). 2. Any person with a legitimate interest may lodge an appeal with the body which issued the decision within (15) days of becoming aware of this decision (Article 118 of Law 4558/2018 (Government Gazette, Series I, No 133). | | |process_sdg_notes=1. An appeal may be lodged against this decision by anyone with a legitimate interest before the Coordinator of the Decentralized Administration concerned, within fifteen (15) days of their becoming aware of the decision, in accordance with Articles 227 and 228 of Law 3852/2010 (Government Gazette, Series I, No 87). 2. Any person with a legitimate interest may lodge an appeal with the body which issued the decision within (15) days of becoming aware of this decision (Article 118 of Law 4558/2018 (Government Gazette, Series I, No 133). |
− | |process_total_duration_steps_min=10368000 | + | |process_total_duration_steps_min=9806400 |
− | |process_total_duration_steps_max=11664000.0 | + | |process_total_duration_steps_max=11534400 |
− | |process_cost_min=90 | + | |process_cost_min=90.00 |
− | |process_cost_max=1350 | + | |process_cost_max=1350.00 |
| |process_evidence_cost_guarantee=0 | | |process_evidence_cost_guarantee=0 |
| |process_evidence_cost_total_number=0 | | |process_evidence_cost_total_number=0 |
Line 40: |
Line 41: |
| |process_application_description=Application for a licence to establish a ‘port service station’. | | |process_application_description=Application for a licence to establish a ‘port service station’. |
| |process_application_note=All the following supporting documents, with the exception of the fees, shall be submitted with the application. Verification of identity is not required for the supporting documents below. | | |process_application_note=All the following supporting documents, with the exception of the fees, shall be submitted with the application. Verification of identity is not required for the supporting documents below. |
− | |process_deadline_duration=2592000
| |
| }} | | }} |
| {{process conditions | | {{process conditions |
Line 85: |
Line 85: |
| |process_evidence_cost_url=https://www1.gsis.gr/sgsisapps/eparavolo/public/create.htm?langId=2 | | |process_evidence_cost_url=https://www1.gsis.gr/sgsisapps/eparavolo/public/create.htm?langId=2 |
| |process_evidence_cost_payment_type=Bank cashier, Digital (debit / credit card), Digital (web banking), Hellenic Post | | |process_evidence_cost_payment_type=Bank cashier, Digital (debit / credit card), Digital (web banking), Hellenic Post |
| + | }} |
| + | {{process evidences |
| + | |process_evidence_num_id=1 |
| + | |process_evidence_type=5768 |
| + | |process_evidence_is_under_prerequisite=No |
| + | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| + | |process_evidence_owner=Legal entities, Persons |
| + | |process_evidence_description=A topographic plan of the area in four (4) copies, signed by the competent engineer, on a scale of one to two hundred (1:200) or one to five hundred (1:500) and to a radius of thirty (30) metres from the boundaries of the space occupied by the service station, the coordinates of which will depend on the State Network (Hellenic Geodetic Reference System 87). |
| + | |process_evidence_note=The plan shall show the space occupied by the service station, the dimensions of its sides, the location of the building, tanks, fuel pumps and tank ventilation. Also to be marked are the types of neighbouring buildings and facilities and data of articles 5 and 6 of Presidential Decree 1224/1981 (Government Gazette, Series I, No 303) or of Royal Decree 465/1970 (Government Gazette, Series I, No 150) or of Presidential Decree 595/1984 (Government Gazette, Series I, No 218) as applicable in the given case. Also to be noted are the lines delineating the seafront and onshore zone of the port, the length of the quay, the mooring jetty of the vessels, their manoeuvring circle within the port basin, the types of neighbouring buildings and the other uses of the port or tourism port. The topographic diagram must confirm that there are no visible archaeological sites the border of which is less than 100 metres from the ‘port service station’ being established. If there are visible archaeological sites, all buildings and sites located within a radius of one hundred (100) metres from the boundaries of the service station’s premises shall be shown on the diagram. A licence to establish a ‘port service station’ at a distance of less than one hundred (100) metres may also be granted if the Archaeological Service grants the relevant approval. The drawings and technical reports shall be signed by the engineer responsible and shall contain a memorandum setting out the details of the project, the applicant and the designer, and a memorandum setting out the technical details of the construction. The plans and technical reports shall also be delivered in electronic form. |
| + | }} |
| + | {{process evidences |
| + | |process_evidence_num_id=2 |
| + | |process_evidence_type=7320 |
| + | |process_evidence_is_under_prerequisite=No |
| + | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| + | |process_evidence_owner=Legal entities, Persons |
| + | |process_evidence_description=Solemn declaration of the applicant in accordance with Article 8 of Law 1599/1986. |
| + | |process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration |
| + | |process_evidence_related_url=https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses |
| + | |process_evidence_note=Specifically: aa. Where the applicant is a natural person, he/she attests that: |
| + | i. in the last eight years he/she has not received a final conviction of fuel fraud and has not been convicted of fuel smuggling at first instance, without prejudice to the provisions of Law 4177/2013 (Government Gazette, Series I, No 173), as in force; |
| + | ii. has the legal right to use and operate the site for the establishment of a ‘port service station’, submitting a legally approved concession decision from the competent port administration and operation body for the use of a port area space for the establishment of a service station, which shall always be issued in accordance with the provisions of Article 24 of Law 2971/2001 (Government Gazette, Series I, No 285) on concessions for port areas, as amended and in force by Article 34 of Law 3153/2003 (Government Gazette, Series I, No 153). |
| + | bb. Where the applicant is a legal person, its legal representative shall attest that: |
| + | i. during the last eight years, he has not received a final conviction and the legal person he represents has not been finally declared jointly liable for fuel fraud, he was not convicted at first instance and the legal person he represents was not declared jointly responsible for fuel smuggling at first instance, without prejudice to the provisions of Law 4177/2013 (Government Gazette, Series I, No 173), as in force; |
| + | ii. the legal person has the right to use and operate the space for the establishment of a ‘port service station’, submitting a legally approved concession decision from the competent port administration and operation body for the use of the port area space for the establishment of a service station, which shall always be issued in accordance with the provisions in force on concessions of areas in the port zone, Article 24 of Law 2971/2001 (Government Gazette, Series I, No 285), as amended and in force by Article 34 of Law 3153/2003 (Government Gazette, Series I, No 153). |
| + | }} |
| + | {{process evidences |
| + | |process_evidence_num_id=3 |
| + | |process_evidence_type=7320 |
| + | |process_evidence_is_under_prerequisite=No |
| + | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| + | |process_evidence_owner=Legal entities, Persons |
| + | |process_evidence_description=A solemn declaration under Article 8 of Law 1599/1986 by the engineer who designed the installation, with the following content: |
| + | i. The location where the service station is to be installed is located in an area where such use is not prohibited by the provisions in force. |
| + | ii. All of the terms and conditions herein are met, as are those of Presidential Decree 1224/1981 (Government Gazette, Series I, No 303), Royal Decree 465/1970 (Government Gazette, Series I, No 150), Presidential Decree 595/84 (Government Gazette, Series I, No 218) or ministerial decision 93067/1083 (Government Gazette 5661, Series II, 2018), depending on the type of fuel, as in force, without prejudice to the terms and conditions herein. |
| + | iii. The design of the facilities and the equipment installed at the service station shall comply with the requirements of the relevant national and European regulations and standards. |
| + | |process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration |
| + | |process_evidence_related_url=https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses |
| + | }} |
| + | {{process evidences |
| + | |process_evidence_num_id=4 |
| + | |process_evidence_type=5768 |
| + | |process_evidence_is_under_prerequisite=No |
| + | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| + | |process_evidence_owner=Legal entities, Persons |
| + | |process_evidence_description=A draft general layout, in four (4) copies, of an appropriate scale according to the size of the port or tourism port, showing the location of the various buildings and installations of the service station, including its tanks, pumps and islands. This plan shall also indicate the elevation of the floors in the service station, the gradients in the vehicle refuelling area and the vehicle traffic zone for the entire length of vehicle routes within the main area of the service station. |
| + | |process_evidence_note=The drawings and technical reports shall be signed by the engineer responsible and shall contain a memorandum setting out the details of the project, the applicant and the designer, and a memorandum setting out the technical details of the construction. The plans and technical reports shall also be delivered in electronic form. |
| + | }} |
| + | {{process evidences |
| + | |process_evidence_num_id=5 |
| + | |process_evidence_type=5768 |
| + | |process_evidence_is_under_prerequisite=No |
| + | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| + | |process_evidence_owner=Legal entities, Persons |
| + | |process_evidence_description=A plan for electromechanical installations in four (4) copies on an appropriate scale according to the size of the installation, showing design in a discrete manner to verify their harmonious coexistence and their simultaneous proper operation with the following installations: |
| + | Water supply, sewage, compressed air, fuel supply piping, tank ventilation pipes, petrol vapour recovery system, electrical networks of the service station (strong currents, weak currents, lighting, earthing), plan for the distribution of anti-explosion buffer zones, accessories and devices to protect against spillage of fuel, as well as a drawing showing the filling materials or how the ground around the tank is packed. |
| + | |process_evidence_note=The drawings and technical reports shall be signed by the engineer responsible and shall contain a memorandum setting out the details of the project, the applicant and the designer, and a memorandum setting out the technical details of the construction. The plans and technical reports shall also be delivered in electronic form. |
| + | }} |
| + | {{process evidences |
| + | |process_evidence_num_id=6 |
| + | |process_evidence_type=5768 |
| + | |process_evidence_is_under_prerequisite=No |
| + | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| + | |process_evidence_owner=Legal entities, Persons |
| + | |process_evidence_description=Detailed drawings, accompanied by a file detailing the technical characteristics of the construction of the equipment, in four (4) copies on a scale of one to fifty (1:50) or one to twenty (1:20). In particular, the drawings must show the following: |
| + | aa. Plan view – section drawing of the service station and any other buildings and installations that require a building permit. |
| + | bb. Fuel tank. The drawing shall include dimensions of the tank, means of mounting with all relevant dimensions, fittings and piping connected to the tank, accessories and devices to protect against fuel leakage, as well as the filling materials, or how the ground around the tank is packed. |
| + | cc. The location of natural gas dispensers, auxiliary equipment, portable compressed storage means for condensed natural |
| + | gas (CNG), the ‘Compact Unit’ of the natural gas tanker parking area. |
| + | dd. Interconnections of pumps/distributors and volumetric meters with electrical and fuel networks. |
| + | ee. Liquid waste processing system – septic tank. The plan shall include the dimensions, materials, method of construction and method of disposal of the waste. |
| + | ff. Centralised electronic fuel management (inflow/outflow) system. The plan shall include the location of the central console, a schematic layout of the whole system with the corresponding wiring and the mode of data transfer. |
| + | |process_evidence_note=The drawings and technical reports shall be signed by the engineer responsible and shall contain a memorandum setting out the details of the project, the applicant and the designer, and a memorandum setting out the technical details of the construction. The plans and technical reports shall also be delivered in electronic form. |
| + | }} |
| + | {{process evidences |
| + | |process_evidence_num_id=7 |
| + | |process_evidence_type=5768 |
| + | |process_evidence_is_under_prerequisite=No |
| + | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| + | |process_evidence_owner=Legal entities, Persons |
| + | |process_evidence_description=A technical report, signed by the engineer responsible, on the electromechanical installations, in four (4) copies. The report shall include information on the overall structure of the installation, the individual installations, the study on the distribution of explosion-proof zones, the machinery, the equipment installed, their technical specifications, their method of connection and operation, and the national and European standards and regulations on the basis of which they were designed and installed. |
| + | |process_evidence_note=The drawings and technical reports shall be signed by the engineer responsible and shall contain a memorandum setting out the details of the project, the applicant and the designer, and a memorandum setting out the technical details of the construction. The plans and technical reports shall also be delivered in electronic form. |
| + | }} |
| + | {{process evidences |
| + | |process_evidence_num_id=8 |
| + | |process_evidence_type=8619 |
| + | |process_evidence_is_under_prerequisite=No |
| + | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| + | |process_evidence_owner=Legal entities, Persons |
| + | |process_evidence_description=Form for inclusion in the environmental commitments standards, in accordance with the provisions of Joint Ministerial Decision No 46537 (Government Gazette, Series I, No 2036/Β/2013), as in force, taking into account the environmental licensing of all port facilities. |
| + | }} |
| + | {{process evidences |
| + | |process_evidence_num_id=9 |
| + | |process_evidence_type=6440 |
| + | |process_evidence_is_under_prerequisite=No |
| + | |process_evidence_alternative=No |
| + | |process_evidence_submission_type=Submitted by the applicant (in person or by post) |
| + | |process_evidence_owner=Legal entities, Persons |
| + | |process_evidence_description=Written agreement of the Directorate for Port and Building Infrastructure, the Secretariat-General for Ports, Port Policy and Maritime Investment of the Ministry of Shipping and Island Policy, in the case of the establishment of a ‘port service station’ within a port area, or of the Tourism Ports Committee in the case of the establishment of a ‘port service station’ within tourism ports or within tourism vessel shelters. |
| }} | | }} |
| {{process rules | | {{process rules |
Line 250: |
Line 357: |
| If the period of fifteen (15) working days elapses without the licensing service approving or rejecting the request, it shall be deemed that the interested party can lawfully implement the changes requested in the ‘port service station’ undertaking without any additional restriction. Furthermore, in the case of the above tacit approval, the interested party may request a certificate from the licensing authority, in accordance with Article 10(4) of Law 3230/2004 (Government Gazette, Series I, No 44). In the case of tacit approval, the licensing authority shall forward all supporting documents for inspection to the Fuel and Energy Supply Stations Department of the Directorate for Technical Control and Vehicle Service Facilities of the Directorate-General for Vehicles and Facilities of the Ministry of Infrastructure and Transport. | | If the period of fifteen (15) working days elapses without the licensing service approving or rejecting the request, it shall be deemed that the interested party can lawfully implement the changes requested in the ‘port service station’ undertaking without any additional restriction. Furthermore, in the case of the above tacit approval, the interested party may request a certificate from the licensing authority, in accordance with Article 10(4) of Law 3230/2004 (Government Gazette, Series I, No 44). In the case of tacit approval, the licensing authority shall forward all supporting documents for inspection to the Fuel and Energy Supply Stations Department of the Directorate for Technical Control and Vehicle Service Facilities of the Directorate-General for Vehicles and Facilities of the Ministry of Infrastructure and Transport. |
| |process_step_note=‘Licensing authority’ means the competent regional Transport and Communications Service. | | |process_step_note=‘Licensing authority’ means the competent regional Transport and Communications Service. |
− | }}
| |
− | {{process evidences
| |
− | |process_evidence_num_id=1
| |
− | |process_evidence_type=5768
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_alternative=No
| |
− | |process_evidence_submission_type=Submitted by the applicant (in person or by post)
| |
− | |process_evidence_owner=Legal entities, Persons
| |
− | |process_evidence_description=A topographic plan of the area in four (4) copies, signed by the competent engineer, on a scale of one to two hundred (1:200) or one to five hundred (1:500) and to a radius of thirty (30) metres from the boundaries of the space occupied by the service station, the coordinates of which will depend on the State Network (Hellenic Geodetic Reference System 87).
| |
− | |process_evidence_note=The plan shall show the space occupied by the service station, the dimensions of its sides, the location of the building, tanks, fuel pumps and tank ventilation. Also to be marked are the types of neighbouring buildings and facilities and data of articles 5 and 6 of Presidential Decree 1224/1981 (Government Gazette, Series I, No 303) or of Royal Decree 465/1970 (Government Gazette, Series I, No 150) or of Presidential Decree 595/1984 (Government Gazette, Series I, No 218) as applicable in the given case. Also to be noted are the lines delineating the seafront and onshore zone of the port, the length of the quay, the mooring jetty of the vessels, their manoeuvring circle within the port basin, the types of neighbouring buildings and the other uses of the port or tourism port. The topographic diagram must confirm that there are no visible archaeological sites the border of which is less than 100 metres from the ‘port service station’ being established. If there are visible archaeological sites, all buildings and sites located within a radius of one hundred (100) metres from the boundaries of the service station’s premises shall be shown on the diagram. A licence to establish a ‘port service station’ at a distance of less than one hundred (100) metres may also be granted if the Archaeological Service grants the relevant approval. The drawings and technical reports shall be signed by the engineer responsible and shall contain a memorandum setting out the details of the project, the applicant and the designer, and a memorandum setting out the technical details of the construction. The plans and technical reports shall also be delivered in electronic form.
| |
− | }}
| |
− | {{process evidences
| |
− | |process_evidence_num_id=2
| |
− | |process_evidence_type=7320
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_alternative=No
| |
− | |process_evidence_submission_type=Submitted by the applicant (in person or by post)
| |
− | |process_evidence_owner=Legal entities, Persons
| |
− | |process_evidence_description=Solemn declaration of the applicant in accordance with Article 8 of Law 1599/1986.
| |
− | |process_evidence_related_url=https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
| |
− | |process_evidence_note=Specifically: aa. Where the applicant is a natural person, he/she attests that:
| |
− | i. in the last eight years he/she has not received a final conviction of fuel fraud and has not been convicted of fuel smuggling at first instance, without prejudice to the provisions of Law 4177/2013 (Government Gazette, Series I, No 173), as in force;
| |
− | ii. has the legal right to use and operate the site for the establishment of a ‘port service station’, submitting a legally approved concession decision from the competent port administration and operation body for the use of a port area space for the establishment of a service station, which shall always be issued in accordance with the provisions of Article 24 of Law 2971/2001 (Government Gazette, Series I, No 285) on concessions for port areas, as amended and in force by Article 34 of Law 3153/2003 (Government Gazette, Series I, No 153).
| |
− | bb. Where the applicant is a legal person, its legal representative shall attest that:
| |
− | i. during the last eight years, he has not received a final conviction and the legal person he represents has not been finally declared jointly liable for fuel fraud, he was not convicted at first instance and the legal person he represents was not declared jointly responsible for fuel smuggling at first instance, without prejudice to the provisions of Law 4177/2013 (Government Gazette, Series I, No 173), as in force;
| |
− | ii. the legal person has the right to use and operate the space for the establishment of a ‘port service station’, submitting a legally approved concession decision from the competent port administration and operation body for the use of the port area space for the establishment of a service station, which shall always be issued in accordance with the provisions in force on concessions of areas in the port zone, Article 24 of Law 2971/2001 (Government Gazette, Series I, No 285), as amended and in force by Article 34 of Law 3153/2003 (Government Gazette, Series I, No 153).
| |
− | |process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration
| |
− | }}
| |
− | {{process evidences
| |
− | |process_evidence_num_id=3
| |
− | |process_evidence_type=7320
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_alternative=No
| |
− | |process_evidence_submission_type=Submitted by the applicant (in person or by post)
| |
− | |process_evidence_owner=Legal entities, Persons
| |
− | |process_evidence_description=A solemn declaration under Article 8 of Law 1599/1986 by the engineer who designed the installation, with the following content:
| |
− | i. The location where the service station is to be installed is located in an area where such use is not prohibited by the provisions in force.
| |
− | ii. All of the terms and conditions herein are met, as are those of Presidential Decree 1224/1981 (Government Gazette, Series I, No 303), Royal Decree 465/1970 (Government Gazette, Series I, No 150), Presidential Decree 595/84 (Government Gazette, Series I, No 218) or ministerial decision 93067/1083 (Government Gazette 5661, Series II, 2018), depending on the type of fuel, as in force, without prejudice to the terms and conditions herein.
| |
− | iii. The design of the facilities and the equipment installed at the service station shall comply with the requirements of the relevant national and European regulations and standards.
| |
− | |process_evidence_related_url=https://www.gov.gr/en/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
| |
− | |process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration
| |
− | }}
| |
− | {{process evidences
| |
− | |process_evidence_num_id=4
| |
− | |process_evidence_type=5768
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_alternative=No
| |
− | |process_evidence_submission_type=Submitted by the applicant (in person or by post)
| |
− | |process_evidence_owner=Legal entities, Persons
| |
− | |process_evidence_description=A draft general layout, in four (4) copies, of an appropriate scale according to the size of the port or tourism port, showing the location of the various buildings and installations of the service station, including its tanks, pumps and islands. This plan shall also indicate the elevation of the floors in the service station, the gradients in the vehicle refuelling area and the vehicle traffic zone for the entire length of vehicle routes within the main area of the service station.
| |
− | |process_evidence_note=The drawings and technical reports shall be signed by the engineer responsible and shall contain a memorandum setting out the details of the project, the applicant and the designer, and a memorandum setting out the technical details of the construction. The plans and technical reports shall also be delivered in electronic form.
| |
− | }}
| |
− | {{process evidences
| |
− | |process_evidence_num_id=5
| |
− | |process_evidence_type=5768
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_alternative=No
| |
− | |process_evidence_submission_type=Submitted by the applicant (in person or by post)
| |
− | |process_evidence_owner=Legal entities, Persons
| |
− | |process_evidence_description=A plan for electromechanical installations in four (4) copies on an appropriate scale according to the size of the installation, showing design in a discrete manner to verify their harmonious coexistence and their simultaneous proper operation with the following installations:
| |
− | Water supply, sewage, compressed air, fuel supply piping, tank ventilation pipes, petrol vapour recovery system, electrical networks of the service station (strong currents, weak currents, lighting, earthing), plan for the distribution of anti-explosion buffer zones, accessories and devices to protect against spillage of fuel, as well as a drawing showing the filling materials or how the ground around the tank is packed.
| |
− | |process_evidence_note=The drawings and technical reports shall be signed by the engineer responsible and shall contain a memorandum setting out the details of the project, the applicant and the designer, and a memorandum setting out the technical details of the construction. The plans and technical reports shall also be delivered in electronic form.
| |
− | }}
| |
− | {{process evidences
| |
− | |process_evidence_num_id=6
| |
− | |process_evidence_type=5768
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_alternative=No
| |
− | |process_evidence_submission_type=Submitted by the applicant (in person or by post)
| |
− | |process_evidence_owner=Legal entities, Persons
| |
− | |process_evidence_description=Detailed drawings, accompanied by a file detailing the technical characteristics of the construction of the equipment, in four (4) copies on a scale of one to fifty (1:50) or one to twenty (1:20). In particular, the drawings must show the following:
| |
− | aa. Plan view – section drawing of the service station and any other buildings and installations that require a building permit.
| |
− | bb. Fuel tank. The drawing shall include dimensions of the tank, means of mounting with all relevant dimensions, fittings and piping connected to the tank, accessories and devices to protect against fuel leakage, as well as the filling materials, or how the ground around the tank is packed.
| |
− | cc. The location of natural gas dispensers, auxiliary equipment, portable compressed storage means for condensed natural
| |
− | gas (CNG), the ‘Compact Unit’ of the natural gas tanker parking area.
| |
− | dd. Interconnections of pumps/distributors and volumetric meters with electrical and fuel networks.
| |
− | ee. Liquid waste processing system – septic tank. The plan shall include the dimensions, materials, method of construction and method of disposal of the waste.
| |
− | ff. Centralised electronic fuel management (inflow/outflow) system. The plan shall include the location of the central console, a schematic layout of the whole system with the corresponding wiring and the mode of data transfer.
| |
− | |process_evidence_note=The drawings and technical reports shall be signed by the engineer responsible and shall contain a memorandum setting out the details of the project, the applicant and the designer, and a memorandum setting out the technical details of the construction. The plans and technical reports shall also be delivered in electronic form.
| |
− | }}
| |
− | {{process evidences
| |
− | |process_evidence_num_id=7
| |
− | |process_evidence_type=5768
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_alternative=No
| |
− | |process_evidence_submission_type=Submitted by the applicant (in person or by post)
| |
− | |process_evidence_owner=Legal entities, Persons
| |
− | |process_evidence_description=A technical report, signed by the engineer responsible, on the electromechanical installations, in four (4) copies. The report shall include information on the overall structure of the installation, the individual installations, the study on the distribution of explosion-proof zones, the machinery, the equipment installed, their technical specifications, their method of connection and operation, and the national and European standards and regulations on the basis of which they were designed and installed.
| |
− | |process_evidence_note=The drawings and technical reports shall be signed by the engineer responsible and shall contain a memorandum setting out the details of the project, the applicant and the designer, and a memorandum setting out the technical details of the construction. The plans and technical reports shall also be delivered in electronic form.
| |
− | }}
| |
− | {{process evidences
| |
− | |process_evidence_num_id=8
| |
− | |process_evidence_type=8619
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_alternative=No
| |
− | |process_evidence_submission_type=Submitted by the applicant (in person or by post)
| |
− | |process_evidence_owner=Legal entities, Persons
| |
− | |process_evidence_description=Form for inclusion in the environmental commitments standards, in accordance with the provisions of Joint Ministerial Decision No 46537 (Government Gazette, Series I, No 2036/Β/2013), as in force, taking into account the environmental licensing of all port facilities.
| |
− | }}
| |
− | {{process evidences
| |
− | |process_evidence_num_id=9
| |
− | |process_evidence_type=6440
| |
− | |process_evidence_is_under_prerequisite=No
| |
− | |process_evidence_alternative=No
| |
− | |process_evidence_submission_type=Submitted by the applicant (in person or by post)
| |
− | |process_evidence_owner=Legal entities, Persons
| |
− | |process_evidence_description=Written agreement of the Directorate for Port and Building Infrastructure, the Secretariat-General for Ports, Port Policy and Maritime Investment of the Ministry of Shipping and Island Policy, in the case of the establishment of a ‘port service station’ within a port area, or of the Tourism Ports Committee in the case of the establishment of a ‘port service station’ within tourism ports or within tourism vessel shelters.
| |
| }} | | }} |