|
|
| Line 20: |
Line 20: |
| | |process_usage=Supporting document | | |process_usage=Supporting document |
| | |process_output_type=Digital document production | | |process_output_type=Digital document production |
| − | |process_source=EU-GO | + | |process_source=Framers |
| | |process_provided_to=Businesses,Citizens,Legal Entities | | |process_provided_to=Businesses,Citizens,Legal Entities |
| | |process_tax_type=Notifications | | |process_tax_type=Notifications |
| Line 34: |
Line 34: |
| | |process_cost_max=5100 | | |process_cost_max=5100 |
| | |process_evidence_cost_guarantee=0 | | |process_evidence_cost_guarantee=0 |
| − | |process_evidence_cost_total_number=2 | + | |process_evidence_cost_total_number=0 |
| | + | |process_evidence_ex_officio_total_number=0 |
| | + | |process_evidence_alternative_total_number=0 |
| | |process_evidence_prerequisite_total_number=1 | | |process_evidence_prerequisite_total_number=1 |
| | |process_evidence_total_number=7 | | |process_evidence_total_number=7 |
| | |process_evidence_step_total_number=0 | | |process_evidence_step_total_number=0 |
| − | |process_evidence_step_digital_total_number=2 | + | |process_evidence_step_digital_total_number=0 |
| − | |process_evidence_ex_officio_total_number=0
| |
| − | |process_evidence_alternative_total_number=0
| |
| | }} | | }} |
| | {{process nace | | {{process nace |
| Line 96: |
Line 96: |
| | {{process evidences cost | | {{process evidences cost |
| | |process_evidence_cost_num_id=3 | | |process_evidence_cost_num_id=3 |
| − | |process_evidence_cost_calculation=One-off
| |
| | |process_evidence_cost_alternative=Yes | | |process_evidence_cost_alternative=Yes |
| | |process_evidence_cost_alternative_of_selector=2 | | |process_evidence_cost_alternative_of_selector=2 |
| | |process_evidence_cost_alternative_of=2 | | |process_evidence_cost_alternative_of=2 |
| | |process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage) | | |process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage) |
| | + | |process_evidence_cost_calculation=One-off |
| | |process_evidence_cost_description=ii. For activities requiring mechanical equipment of a value up to six hundred thousand (600.000) euros and installed power up to 400 KW, an administrative fee of three hundred (300) euros shall be paid. | | |process_evidence_cost_description=ii. For activities requiring mechanical equipment of a value up to six hundred thousand (600.000) euros and installed power up to 400 KW, an administrative fee of three hundred (300) euros shall be paid. |
| | |process_evidence_cost_min=300 | | |process_evidence_cost_min=300 |
| Line 108: |
Line 108: |
| | {{process evidences cost | | {{process evidences cost |
| | |process_evidence_cost_num_id=4 | | |process_evidence_cost_num_id=4 |
| − | |process_evidence_cost_calculation=One-off
| |
| | |process_evidence_cost_alternative=Yes | | |process_evidence_cost_alternative=Yes |
| | |process_evidence_cost_alternative_of_selector=2 | | |process_evidence_cost_alternative_of_selector=2 |
| | |process_evidence_cost_alternative_of=2 | | |process_evidence_cost_alternative_of=2 |
| | |process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage) | | |process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage) |
| | + | |process_evidence_cost_calculation=One-off |
| | |process_evidence_cost_description=iii. For activities requiring mechanical equipment of a value up to one million (1.000.000) euros and installed power up to 1.000 KW, an administrative fee of four hundred (400) euros shall be paid. | | |process_evidence_cost_description=iii. For activities requiring mechanical equipment of a value up to one million (1.000.000) euros and installed power up to 1.000 KW, an administrative fee of four hundred (400) euros shall be paid. |
| | |process_evidence_cost_min=400 | | |process_evidence_cost_min=400 |
| Line 120: |
Line 120: |
| | {{process evidences cost | | {{process evidences cost |
| | |process_evidence_cost_num_id=5 | | |process_evidence_cost_num_id=5 |
| − | |process_evidence_cost_calculation=One-off
| |
| | |process_evidence_cost_alternative=Yes | | |process_evidence_cost_alternative=Yes |
| | |process_evidence_cost_alternative_of_selector=2 | | |process_evidence_cost_alternative_of_selector=2 |
| | |process_evidence_cost_alternative_of=2 | | |process_evidence_cost_alternative_of=2 |
| | |process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage) | | |process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage) |
| | + | |process_evidence_cost_calculation=One-off |
| | |process_evidence_cost_description=iv. For activities requiring mechanical equipment of a value up to two million (2.000.000) euros and installed power up to 2.000 KW, an administrative fee of five hundred (500) euros shall be paid. | | |process_evidence_cost_description=iv. For activities requiring mechanical equipment of a value up to two million (2.000.000) euros and installed power up to 2.000 KW, an administrative fee of five hundred (500) euros shall be paid. |
| | |process_evidence_cost_min=500 | | |process_evidence_cost_min=500 |
| Line 159: |
Line 159: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| | + | |process_evidence_type=Notification/Announcement |
| | |process_evidence_submission_type=Submitted by the applicant (digital) | | |process_evidence_submission_type=Submitted by the applicant (digital) |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Notification/Announcement
| |
| | |process_evidence_identification_type=Identification with TAXISnet codes | | |process_evidence_identification_type=Identification with TAXISnet codes |
| | |process_evidence_description=Νotification of commencement of operation of a factory or winery for the manufacture of concentrated grape must through the ‘notify business’ site. | | |process_evidence_description=Νotification of commencement of operation of a factory or winery for the manufacture of concentrated grape must through the ‘notify business’ site. |
| Line 170: |
Line 170: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| | + | |process_evidence_type=Document display |
| | |process_evidence_submission_type=Keep within business establishment | | |process_evidence_submission_type=Keep within business establishment |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Document display
| |
| | |process_evidence_description=Proof of submission of the notification. | | |process_evidence_description=Proof of submission of the notification. |
| | }} | | }} |
| Line 179: |
Line 179: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| | + | |process_evidence_type=Official document |
| | |process_evidence_submission_type=Keep within business establishment | | |process_evidence_submission_type=Keep within business establishment |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Official document
| |
| | |process_evidence_description=Installation permit (if required). | | |process_evidence_description=Installation permit (if required). |
| | }} | | }} |
| Line 188: |
Line 188: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| | + | |process_evidence_type=Drawings/studies by an engineer/architect |
| | |process_evidence_submission_type=Keep within business establishment | | |process_evidence_submission_type=Keep within business establishment |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Drawings/studies by an engineer/architect
| |
| | |process_evidence_description=Brief technical description of the installation, signed by the legally competent engineer, containing: | | |process_evidence_description=Brief technical description of the installation, signed by the legally competent engineer, containing: |
| | - Land surveyor’s diagram showing the building installations and the necessary signalling and traffic regulation information within the plot. | | - Land surveyor’s diagram showing the building installations and the necessary signalling and traffic regulation information within the plot. |
| Line 200: |
Line 200: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| | + | |process_evidence_type=Solemn Declaration |
| | |process_evidence_submission_type=Keep within business establishment | | |process_evidence_submission_type=Keep within business establishment |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Solemn Declaration
| |
| | |process_evidence_description=Solemn declaration of a legally competent engineer certifying the static adequacy and the industrial-craft use of the building, that no new building permit or regularisation or legalisation of the building installation is required, that the installation of the mechanical equipment took place in a main use area (not an auxiliary or shared one) and that it is in accordance with the technical description of the installation (previous supporting document), with explicit reference to the date of its stamping. | | |process_evidence_description=Solemn declaration of a legally competent engineer certifying the static adequacy and the industrial-craft use of the building, that no new building permit or regularisation or legalisation of the building installation is required, that the installation of the mechanical equipment took place in a main use area (not an auxiliary or shared one) and that it is in accordance with the technical description of the installation (previous supporting document), with explicit reference to the date of its stamping. |
| | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses | | |process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses |
| Line 210: |
Line 210: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| | + | |process_evidence_type=Rule |
| | |process_evidence_submission_type=Keep within business establishment | | |process_evidence_submission_type=Keep within business establishment |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Rule
| |
| | |process_evidence_description=Decision of Approval of Environmental Terms (AEPO) or decision of inclusion in Model Environmental Commitments (PPD). | | |process_evidence_description=Decision of Approval of Environmental Terms (AEPO) or decision of inclusion in Model Environmental Commitments (PPD). |
| | }} | | }} |
| Line 219: |
Line 219: |
| | |process_evidence_is_under_prerequisite=No | | |process_evidence_is_under_prerequisite=No |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| | + | |process_evidence_type=Official document |
| | |process_evidence_submission_type=Keep within business establishment | | |process_evidence_submission_type=Keep within business establishment |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Official document
| |
| | |process_evidence_description=Building permit, with all the accompanying studies and drawings, including any regularisations, arrangements or legalisations of arbitrary constructions, as well as the related attestations of payment of fines. | | |process_evidence_description=Building permit, with all the accompanying studies and drawings, including any regularisations, arrangements or legalisations of arbitrary constructions, as well as the related attestations of payment of fines. |
| | }} | | }} |
| Line 229: |
Line 229: |
| | |process_evidence_prerequisite=Environmental, Health, Technical, Urban planning | | |process_evidence_prerequisite=Environmental, Health, Technical, Urban planning |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| | + | |process_evidence_type=Other |
| | |process_evidence_submission_type=Keep within business establishment | | |process_evidence_submission_type=Keep within business establishment |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Other
| |
| | |process_evidence_description=Special supporting documents (required on a case by case basis): | | |process_evidence_description=Special supporting documents (required on a case by case basis): |
| | - Solemn declaration of undertaking the supervision, operation and maintenance of the unit by its owner and the legally competent engineer respectively, when the total driving power of the unit exceeds 59 kW (80HP), or a maintenance contract of the mechanical equipment by the manufacturer assuming the responsibility of the operation of the mechanical equipment. | | - Solemn declaration of undertaking the supervision, operation and maintenance of the unit by its owner and the legally competent engineer respectively, when the total driving power of the unit exceeds 59 kW (80HP), or a maintenance contract of the mechanical equipment by the manufacturer assuming the responsibility of the operation of the mechanical equipment. |
| Line 351: |
Line 351: |
| | |process_step_digital_duration_type=Days | | |process_step_digital_duration_type=Days |
| | |process_step_digital_description=Until the full activation of the accessibility of all involved authorities, the Development Directorate of the relevant Regional Unit is obliged to forward the notification within five (5) working days, as the case may be, to the competent Fire Service, Health Service, Chemical Service, Veterinary Authority, Water Directorate, Directorate of Agricultural Economy and Veterinary, service of the Labor Inspection Body, regional service of EFET, Building Service, Environmental Service, Surrounding Area, Surrounding Area Transport, and to any other authority at its discretion, in order for them to be informed of the start of operation and to be able to exercise the controls provided by law. | | |process_step_digital_description=Until the full activation of the accessibility of all involved authorities, the Development Directorate of the relevant Regional Unit is obliged to forward the notification within five (5) working days, as the case may be, to the competent Fire Service, Health Service, Chemical Service, Veterinary Authority, Water Directorate, Directorate of Agricultural Economy and Veterinary, service of the Labor Inspection Body, regional service of EFET, Building Service, Environmental Service, Surrounding Area, Surrounding Area Transport, and to any other authority at its discretion, in order for them to be informed of the start of operation and to be able to exercise the controls provided by law. |
| − | }}
| |
| − | {{process provision digital locations
| |
| − | |process_provision_digital_location_title=EUGO portal (information only)
| |
| − | |process_provision_digital_location_url=https://eugo.gov.gr/en/services/f465c484-24b8-4c94-8842-55e387744025/
| |
| | }} | | }} |
| | {{process provision digital locations | | {{process provision digital locations |