|
|
| Line 1: |
Line 1: |
| − | {{process | + | {{Process |
| − | |process_uuid=f465c484-24b8-4c94-8842-55e387744025 | + | |process_uuid=f465c484-24b8-4c94-8842-55e387744025 |
| − | |process_id=290500 | + | |process_id=290500 |
| − | |process_official_title=Notification of Commencement of Operation of a Factory or Winery for the Manufacture of Concentrated Grape Must | + | |process_official_title=Notification of Commencement of Operation of a Factory or Winery for the Manufacture of Concentrated Grape Must |
| − | |process_description=This procedure concerns the commencement of operation of a factory or winery for the manufacture of concentrated grape must by a natural or legal person. It is aimed at citizens, businesses and legal entities. | + | |process_description=This procedure concerns the commencement of operation of a factory or winery for the manufacture of concentrated grape must by a natural or legal person. It is aimed at citizens, businesses and legal entities. |
| − | |process_org_owner_is_private=No | + | |process_org_owner_is_private=No |
| − | |process_org_owner=Φορέας:MINISTRY OF DEVELOPMENT AND INVESTMENTS | + | |process_org_owner=Φορέας:MINISTRY OF DEVELOPMENT AND INVESTMENTS |
| − | |process_provision_org_owner_directory=ΓΕΝΙΚΗ ΓΡΑΜΜΑΤΕΙΑ ΒΙΟΜΗΧΑΝΙΑΣ; ΔΙΕΥΘΥΝΣΗ ΑΔΕΙΟΔΟΤΗΣΗΣ ΕΠΙΧΕΙΡΗΣΕΩΝ ΚΑΙ ΕΠΙΧΕΙΡΗΜΑΤΙΚΩΝ ΠΑΡΚΩΝ | + | |process_provision_org_owner_directory=ΓΕΝΙΚΗ ΓΡΑΜΜΑΤΕΙΑ ΒΙΟΜΗΧΑΝΙΑΣ; ΔΙΕΥΘΥΝΣΗ ΑΔΕΙΟΔΟΤΗΣΗΣ ΕΠΙΧΕΙΡΗΣΕΩΝ ΚΑΙ ΕΠΙΧΕΙΡΗΜΑΤΙΚΩΝ ΠΑΡΚΩΝ |
| − | |process_provision_org=MINISTRY OF DEVELOPMENT AND INVESTMENTS | + | |process_provision_org=MINISTRY OF DEVELOPMENT AND INVESTMENTS |
| − | |process_provision_org_directory=Regional Directorates for Development | + | |process_provision_org_directory=Regional Directorates for Development |
| − | |process_provision_org_group=Regions, Digital Portals | + | |process_provision_org_group=Regions, Digital Portals |
| − | |process_estimated_implementation_time=2 | + | |process_estimated_implementation_time=2 |
| − | |process_estimated_implementation_time_type=Hours | + | |process_estimated_implementation_time_type=Hours |
| − | |process_provided_language=English | + | |process_provided_language=English |
| − | |process_border_provision=Establishment | + | |process_border_provision=Establishment |
| − | |process_type=Outgoing | + | |process_type=Outgoing |
| − | |process_trigger=Notification/Announcement | + | |process_trigger=Notification/Announcement |
| − | |process_trigger_type=Application (digital) | + | |process_trigger_type=Application (digital) |
| − | |process_provided_to=Citizens, Businesses, Legal Entities | + | |process_provided_to=Citizens, Businesses, Legal Entities |
| − | |process_tax_type=Notifications | + | |process_tax_type=Notifications |
| − | |process_usage=Supporting document | + | |process_usage=Supporting document |
| − | |process_output_type=Document Production | + | |process_output_type=Document Production |
| − | |process_source=EU-GO | + | |process_source=EU-GO |
| − | |process_sdg_resource=Administrative appeal | + | |process_sdg_resource=Administrative appeal |
| − | |process_bpmn_source=EUGO | + | |process_bpmn_source=EUGO |
| − | |process_bpmn_digital_source=EUGO | + | |process_bpmn_digital_source=EUGO |
| − | |process_total_duration_steps_min=1 | + | |process_total_duration_steps_min=1 |
| − | |process_total_duration_steps_digital_min=1 | + | |process_total_duration_steps_digital_min=1 |
| − | |process_total_duration_steps_digital_max=5 | + | |process_total_duration_steps_digital_max=5 |
| − | |process_total_duration_steps_digital_type=Days | + | |process_total_duration_steps_digital_type=Days |
| − | |process_cost_min=300 | + | |process_cost_min=300 |
| − | |process_cost_max=5100 | + | |process_cost_max=5100 |
| − | |process_evidence_cost_total_number=2 | + | |process_evidence_cost_total_number=2 |
| − | |process_evidence_total_number=8 | + | |process_evidence_total_number=8 |
| − | |process_evidence_step_total_number=0 | + | |process_evidence_step_total_number=0 |
| − | |process_evidence_step_digital_total_number=1 | + | |process_evidence_step_digital_total_number=1 |
| | + | |process_see_also=Commencement of Operations and Attribution of Tax Registration Number to Service Providers, Legal Entities (with Establishment) |
| | + | }} |
| | + | {{Process rules |
| | + | |process_rule_type=Law |
| | + | |process_rule_decision_number=4711 |
| | + | |process_rule_decision_year=2020 |
| | + | |process_rule_description=Amending Law 4442/2016. |
| | + | |process_rule_gazette_doc_number=145 |
| | + | |process_rule_gazette_doc_issue=Α |
| | + | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wHUdWr4xouZundtvSoClrL8-zFLpBf_Zex5MXD0LzQTLWPU9yLzB8V68knBzLCmTXKaO6fpVZ6Lx9hLslJUqeiQ98pb_MWo685h0KNYxc6960NWDC83dOLGbGE4sLMS_ww. |
| | }} | | }} |
| − | {{process nace | + | {{Process rules |
| − | |process_nace_code=11.02 | + | |process_rule_type=Law |
| − | |process_nace_description=Manufacture of wine from grape | + | |process_rule_decision_number=4549 |
| | + | |process_rule_decision_year=2018 |
| | + | |process_rule_article=71, 72, 79 |
| | + | |process_rule_description=Specifically : |
| | + | - Articles 71, 79 -Amending Law 4442/ 2016 (replacing article 17), |
| | + | - Article 72 -Amending Law 4442/2016 (amending article 18, about fees). |
| | + | |process_rule_gazette_doc_number=105 |
| | + | |process_rule_gazette_doc_issue=Α |
| | + | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wG3UHk-ZeQumndtvSoClrL8LCLHE8WeG_Z5MXD0LzQTLWPU9yLzB8V68knBzLCmTXKaO6fpVZ6Lx9hLslJUqeiQsvQaGYdXSGswOCu4mpVXpHJTOywXYYFN5uMLcwFRIF8. |
| | + | }} |
| | + | {{Process rules |
| | + | |process_rule_type=Law |
| | + | |process_rule_decision_number=4442 |
| | + | |process_rule_decision_year=2016 |
| | + | |process_rule_article=11,17, 25 |
| | + | |process_rule_description=Article 11: Fees, |
| | + | Article 17: Facilitation of operating food and beverage manufacturing activities, |
| | + | Article 25: Abolishment of article 2 τof MD 5045/116550/2015. |
| | + | |process_rule_gazette_doc_number=230 |
| | + | |process_rule_gazette_doc_issue=Α |
| | + | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wFHp_31M9ESQXdtvSoClrL8zS83ZvoDVVR5MXD0LzQTLWPU9yLzB8V68knBzLCmTXKaO6fpVZ6Lx9hLslJUqeiQXIqwrD8C8OPWyw5EsGKSLDPAW8sxNE-LO5NpDpPt7TQ. |
| | }} | | }} |
| − | {{process sdg | + | {{Process rules |
| − | |process_sdg_code=N1 | + | |process_rule_type=Law |
| − | |process_sdg_title=Acquiring licences, authorisations or permits | + | |process_rule_decision_number=4336 |
| − | |process_sdg_description=acquiring licences, authorisations or permits with a view to starting and operating a business in Greece | + | |process_rule_decision_year=2015 |
| | + | |process_rule_article=2 |
| | + | |process_rule_description=Paragraph D, Subparagraph D.11- Abolishment JMD 11787/2011 (Carrying out via KEP-EKE). |
| | + | |process_rule_gazette_doc_number=94 |
| | + | |process_rule_gazette_doc_issue=Α |
| | + | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wE4q6ggiv8WTXdtvSoClrL8f8uEKElbw5ntIl9LGdkF53UIxsx942CdyqxSQYNuqAGCF0IfB9HI6hq6ZkZV96FIQhrYj5VIEM7IKETejyQzEp0X31zuuB7j5aJvcQoKXAc. |
| | }} | | }} |
| − | {{process conditions | + | {{Process rules |
| − | |process_conditions_num_id=1 | + | |process_rule_type=Joint Ministerial Decision |
| − | |process_conditions_alternative=No | + | |process_rule_decision_number=14684/914/Φ15 |
| − | |process_conditions_type=Possession of passwords to enter software | + | |process_rule_decision_year=2012 |
| − | |process_conditions_name=The applicant shall have a TAXISnet username and password. | + | |process_rule_article=1 |
| − | |process_conditions_url=https://www.gov.gr/arxes/anexartete-arkhe-demosion-esodon-aade/anexartete-arkhe-demosion-esodon-aade/elektronike-eggraphe-diakheirise-kodikon-taxisnet | + | |process_rule_description=Delineation of fees in article 28 par. 4 of Law 3982/2011 and delineation of inspectors compensation. |
| | + | |process_rule_gazette_doc_number=3533 |
| | + | |process_rule_gazette_doc_issue=Β |
| | + | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wEbA_BZxkczbHdtvSoClrL8zW0YBcYgjYS4ndCieBbLVuJInJ48_97uHrMts-zFzeyCiBSQOpYnT00MHhcXFRTsLgnr8z1cXao8UROFutEGhR-bZTqfltBZx0Jo_RhL2Ds. |
| | + | }} |
| | + | {{Process rules |
| | + | |process_rule_type=Ministerial Decision |
| | + | |process_rule_decision_number=64618/856/Φ15 |
| | + | |process_rule_decision_year=2018 |
| | + | |process_rule_article=1 |
| | + | |process_rule_description=Amending MD 483/35/Φ.15/2012 (replacing articles 1 to 9). |
| | + | |process_rule_gazette_doc_number=2278 |
| | + | |process_rule_gazette_doc_issue=Β |
| | + | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wG3UHk-ZeQumndtvSoClrL8liRx8Eq_4LLuFUDqazHcNeJInJ48_97uHrMts-zFzeyCiBSQOpYnT00MHhcXFRTsyal-Bz3s_XD2iAAQTLerAxmjzwX7d8f6W6ltCowBYaY. |
| | + | }} |
| | + | {{Process rules |
| | + | |process_rule_type=Ministerial Decision |
| | + | |process_rule_decision_number=483/35/Φ.15 |
| | + | |process_rule_decision_year=2012 |
| | + | |process_rule_description=Delineation of type, required documents and process for installing and operating manufacturing activities of Law Ν. 3982/2011 (GG Α΄143), and of modification and renewal of permits along with the deadline for transfer or technical rebuilding. |
| | + | |process_rule_gazette_doc_number=158 |
| | + | |process_rule_gazette_doc_issue=Β |
| | + | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wEbA_BZxkczbHdtvSoClrL84yO_9F7QSVt5MXD0LzQTLf7MGgcO23N88knBzLCmTXKaO6fpVZ6Lx9hLslJUqeiQd1LylGVS2deoH9MScBIVO2qtT19xm2DEtEaryh0yxDA. |
| | + | }} |
| | + | {{Process rules |
| | + | |process_rule_type=Ministerial Decision |
| | + | |process_rule_decision_number=5045/116550 |
| | + | |process_rule_decision_year=2015 |
| | + | |process_rule_description=Delineation of details for the production of rectified concentrated grape must/ grape sugar |
| | + | |process_rule_gazette_doc_number=2323 |
| | + | |process_rule_gazette_doc_issue=Β |
| | + | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wE4q6ggiv8WTXdtvSoClrL8noyF6ARJ3CO4ndCieBbLVuJInJ48_97uHrMts-zFzeyCiBSQOpYnT00MHhcXFRTsxlGzt23eRmjXBZE8hD5Swp9xzN82XrwgsDZ0H9jX10s. |
| | + | }} |
| | + | {{Process steps digital |
| | + | |process_step_digital_num_id=1 |
| | + | |process_step_digital_exit=No |
| | + | |process_step_digital_child=No |
| | + | |process_step_digital_title=Submission of notification |
| | + | |process_step_digital_official=Institutional software |
| | + | |process_step_digital_implementation=Software action |
| | + | |process_step_digital_url=https://notifybusiness.gov.gr/assets/index.html |
| | + | |process_step_digital_duration_min=1 |
| | + | |process_step_digital_duration_max=1 |
| | + | |process_step_digital_duration_type=Hours |
| | + | |process_step_digital_description=Submission of notification in accordance with article 6 of Law 4442/2016, through the notifybusiness.gov.gr site. |
| | + | Each notification submitted automatically receives a document reference (“protocol”) number from the system, as well as a unique declaration number. |
| | + | The interested party receives from the system a receipt for the submission of the notification, to be included in the file kept at the installation. |
| | }} | | }} |
| − | {{process conditions | + | {{Process conditions |
| − | |process_conditions_num_id=2 | + | |process_conditions_num_id=1 |
| − | |process_conditions_alternative=No | + | |process_conditions_alternative=No |
| − | |process_conditions_type=Administrative | + | |process_conditions_type=Company law |
| − | |process_conditions_name=During the operation of the activity, the operator shall keep on-site at the installation a file with the required updated documents, to be presented to the competent authorities. | + | |process_conditions_name=Business formation (individual, corporate) |
| | + | *For company establishment see the link below |
| | + | |process_conditions_url=https://www.gov.gr/ipiresies/epikheirematike-drasterioteta/enarxe-kai-luse-epikheireses/sustase-epikheireses |
| | }} | | }} |
| − | {{process evidences cost | + | {{Process conditions |
| − | |process_evidence_cost_num_id=1 | + | |process_conditions_num_id=2 |
| − | |process_evidence_cost_alternative=No | + | |process_conditions_alternative=No |
| − | |process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage) | + | |process_conditions_type=Possession of passwords to enter software |
| − | |process_evidence_cost_description=For the submission of the notification, the deposit of administrative fee is required
| + | |process_conditions_name=The applicant shall have a TAXISnet username and password. |
| − | |process_evidence_cost_min=100 | + | |process_conditions_url=https://www.gov.gr/arxes/anexartete-arkhe-demosion-esodon-aade/anexartete-arkhe-demosion-esodon-aade/elektronike-eggraphe-diakheirise-kodikon-taxisnet |
| − | |process_evidence_cost_max=100 | |
| − | |process_evidence_cost_payment_type=Bank cashier, Digital (web banking)
| |
| | }} | | }} |
| − | {{process evidences cost | + | {{process conditions |
| − | |process_evidence_cost_num_id=2 | + | |process_conditions_num_id=3 |
| − | |process_evidence_cost_alternative=No | + | |process_conditions_alternative=No |
| − | |process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage) | + | |process_conditions_type=Administrative |
| − | |process_evidence_cost_description=Calculated as the 30 % of the fee paid for the approval of the establishment/installation: | + | |process_conditions_name=During the operation of the activity, the operator shall keep on-site at the installation a file with the required updated documents, to be presented to the competent authorities. |
| − | Administrative fees for granting an installation authorisation:
| |
| − | i. For activities requiring mechanical equipment of a value up to three hundred thousand (300.000) euros and installed power up to 200 KW, an administrative fee of two hundred (200) euros shall be paid.
| |
| − | ii. For activities requiring mechanical equipment of a value up to six hundred thousand (600.000) euros and installed power up to 400 KW, an administrative fee of three hundred (300) euros shall be paid.
| |
| − | iii. For activities requiring mechanical equipment of a value up to one million (1.000.000) euros and installed power up to 1.000 KW, an administrative fee of four hundred (400) euros shall be paid.
| |
| − | iv. For activities requiring mechanical equipment of a value up to two million (2.000.000) euros and installed power up to 2.000 KW, an administrative fee of five hundred (500) euros shall be paid.
| |
| − | v. For activities requiring mechanical equipment of a value up to three million (3.000.000) euros and installed power up to 4.000 KW, an administrative fee of six hundred (600) euros shall be paid.
| |
| − | vi. For activities requiring mechanical equipment of a value superior to three million (3.000.000) euros and consuming over 4.000 KW of power, an administrative fee amounting to zero point three per thousand (0,3‰) of the value of the mechanical equipment and not exceeding five thousand (5.000) euros.
| |
| − | These administrative fees are also payable in every case of granting the authorisation of an installation, extension or modernisation, the amount being calculated upon the basis of the value and power of the mechanical equipment of the extension or modernisation.
| |
| − | |process_evidence_cost_min=200
| |
| − | |process_evidence_cost_max=5000
| |
| − | |process_evidence_cost_payment_type=Bank cashier, Digital (web banking)
| |
| | }} | | }} |
| − | {{process evidences | + | {{Process evidences |
| − | |process_evidence_num_id=1 | + | |process_evidence_num_id=1 |
| − | |process_evidence_alternative=No | + | |process_evidence_alternative=No |
| − | |process_evidence_owner=Legal entities, Persons | + | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Notification/Announcement | + | |process_evidence_type=Notification/Announcement |
| − | |process_evidence_identification_type=Identification with TAXISnet codes | + | |process_evidence_identification_type=Identification with TAXISnet codes |
| − | |process_evidence_description=Νotification of commencement of operation of a factory or winery for the manufacture of concentrated grape must through the ‘notify business’ site. | + | |process_evidence_description=Νotification of commencement of operation of a factory or winery for the manufacture of concentrated grape must through the ‘notify business’ site. |
| − | |process_evidence_submission_type=Submitted by the applicant (digital) | + | |process_evidence_submission_type=Submitted by the applicant (digital) |
| − | |process_evidence_related_url=https://notifybusiness.gov.gr/assets/index.html | + | |process_evidence_related_url=https://notifybusiness.gov.gr/assets/index.html |
| | }} | | }} |
| − | {{process evidences | + | {{Process evidences |
| − | |process_evidence_num_id=2 | + | |process_evidence_num_id=2 |
| − | |process_evidence_alternative=No | + | |process_evidence_alternative=No |
| − | |process_evidence_owner=Legal entities, Persons | + | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Notification/Announcement | + | |process_evidence_type=Notification/Announcement |
| − | |process_evidence_description=Proof of submission of the notification | + | |process_evidence_description=Proof of submission of the notification |
| − | |process_evidence_submission_type=Keep within business establishment | + | |process_evidence_submission_type=Keep within business establishment |
| | }} | | }} |
| − | {{process evidences | + | {{Process evidences |
| − | |process_evidence_num_id=3 | + | |process_evidence_num_id=3 |
| − | |process_evidence_alternative=No | + | |process_evidence_alternative=No |
| − | |process_evidence_owner=Legal entities, Persons | + | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Official document | + | |process_evidence_type=Official document |
| − | |process_evidence_description=Installation permit (if required) | + | |process_evidence_description=Installation permit (if required) |
| − | |process_evidence_submission_type=Keep within business establishment | + | |process_evidence_submission_type=Keep within business establishment |
| | }} | | }} |
| − | {{process evidences | + | {{Process evidences |
| − | |process_evidence_num_id=4 | + | |process_evidence_num_id=4 |
| − | |process_evidence_alternative=No | + | |process_evidence_alternative=No |
| − | |process_evidence_owner=Legal entities, Persons | + | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Drawings/studies by an engineer/architect | + | |process_evidence_type=Drawings/studies by an engineer/architect |
| − | |process_evidence_description=Brief technical description of the installation, signed by the legally competent engineer, containing: | + | |process_evidence_description=Brief technical description of the installation, signed by the legally competent engineer, containing: |
| | - Land surveyor’s diagram showing the building installations and the necessary signalling and traffic regulation information within the plot. | | - Land surveyor’s diagram showing the building installations and the necessary signalling and traffic regulation information within the plot. |
| | - Description of the activity (production process, type of raw materials used and products produced, flow chart of work performed, etc.) | | - Description of the activity (production process, type of raw materials used and products produced, flow chart of work performed, etc.) |
| | - Floor plan with indicative placement of the machines on it and a list of the machines with the indication of their power. The place-ment information is to be provided in order to facilitate controls and any deviations in the presentation of their placement on the floor plan is not subject to sanction, as long as there is no safety issue. | | - Floor plan with indicative placement of the machines on it and a list of the machines with the indication of their power. The place-ment information is to be provided in order to facilitate controls and any deviations in the presentation of their placement on the floor plan is not subject to sanction, as long as there is no safety issue. |
| − | |process_evidence_submission_type=Keep within business establishment | + | |process_evidence_submission_type=Keep within business establishment |
| | }} | | }} |
| − | {{process evidences | + | {{Process evidences |
| − | |process_evidence_num_id=5 | + | |process_evidence_num_id=5 |
| − | |process_evidence_alternative=No | + | |process_evidence_alternative=No |
| − | |process_evidence_owner=Legal entities, Persons | + | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Solemn Declaration | + | |process_evidence_type=Solemn Declaration |
| − | |process_evidence_description=Solemn declaration of a legally competent engineer certifying the static adequacy and the industrial-craft use of the building, that no new building permit or regularisation or legalisation of the building installation is required, that the installation of the mechanical equipment took place in a main use area (not an auxiliary or shared one) and that it is in accordance with the technical description of the installation (previous supporting document), with explicit reference to the date of its stamping. | + | |process_evidence_description=Solemn declaration of a legally competent engineer certifying the static adequacy and the industrial-craft use of the building, that no new building permit or regularisation or legalisation of the building installation is required, that the installation of the mechanical equipment took place in a main use area (not an auxiliary or shared one) and that it is in accordance with the technical description of the installation (previous supporting document), with explicit reference to the date of its stamping. |
| − | |process_evidence_submission_type=Keep within business establishment | + | |process_evidence_submission_type=Keep within business establishment |
| | }} | | }} |
| − | {{process evidences | + | {{Process evidences |
| − | |process_evidence_num_id=6 | + | |process_evidence_num_id=6 |
| − | |process_evidence_alternative=No | + | |process_evidence_alternative=No |
| − | |process_evidence_owner=Legal entities, Persons | + | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Rule | + | |process_evidence_type=Rule |
| − | |process_evidence_description=Decision of Approval of Environmental Terms (AEPO) or decision of inclusion in Model Environmental Commitments (PPD). | + | |process_evidence_description=Decision of Approval of Environmental Terms (AEPO) or decision of inclusion in Model Environmental Commitments (PPD). |
| − | |process_evidence_submission_type=Keep within business establishment | + | |process_evidence_submission_type=Keep within business establishment |
| | }} | | }} |
| − | {{process evidences | + | {{Process evidences |
| − | |process_evidence_num_id=7 | + | |process_evidence_num_id=7 |
| − | |process_evidence_alternative=No | + | |process_evidence_alternative=No |
| − | |process_evidence_owner=Legal entities, Persons | + | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Official document | + | |process_evidence_type=Official document |
| − | |process_evidence_description=Building permit, with all the accompanying studies and drawings, including any regularisations, arrangements or legalisations of arbitrary constructions, as well as the related attestations of payment of fines. | + | |process_evidence_description=Building permit, with all the accompanying studies and drawings, including any regularisations, arrangements or legalisations of arbitrary constructions, as well as the related attestations of payment of fines. |
| − | |process_evidence_submission_type=Keep within business establishment | + | |process_evidence_submission_type=Keep within business establishment |
| | }} | | }} |
| − | {{process evidences | + | {{Process evidences |
| − | |process_evidence_num_id=8 | + | |process_evidence_num_id=8 |
| − | |process_evidence_alternative=No | + | |process_evidence_alternative=No |
| − | |process_evidence_owner=Legal entities, Persons | + | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Other | + | |process_evidence_type=Other |
| − | |process_evidence_description=Special supporting documents (required on a case by case basis): | + | |process_evidence_description=Special supporting documents (required on a case by case basis): |
| | - Solemn declaration of undertaking the supervision, operation and maintenance of the unit by its owner and the legally competent engineer respectively, when the total driving power of the unit exceeds 59 kW (80HP), or a maintenance contract of the mechanical equipment by the manufacturer assuming the responsibility of the operation of the mechanical equipment. | | - Solemn declaration of undertaking the supervision, operation and maintenance of the unit by its owner and the legally competent engineer respectively, when the total driving power of the unit exceeds 59 kW (80HP), or a maintenance contract of the mechanical equipment by the manufacturer assuming the responsibility of the operation of the mechanical equipment. |
| | - Fire Safety Certificate from the competent Fire Department in accordance with the joint ministerial decision F15/ oik.1589/ 104/2006 (B90), if required. If the unit includes an installation of liquid fuels or LPG for the operational needs of the units, the provisions of the joint ministerial decision of 28-6-1991 (GG 578B/ 1991) and the ministerial decision D3/ 14858/1993 (B 477) apply respectively. | | - Fire Safety Certificate from the competent Fire Department in accordance with the joint ministerial decision F15/ oik.1589/ 104/2006 (B90), if required. If the unit includes an installation of liquid fuels or LPG for the operational needs of the units, the provisions of the joint ministerial decision of 28-6-1991 (GG 578B/ 1991) and the ministerial decision D3/ 14858/1993 (B 477) apply respectively. |
| Line 161: |
Line 231: |
| | - Authorisation for activities of processing food and other products of animal origin, pursuant to Regulations 853/ 2004 (L139) or 183/ 2005 (L35) or 1069/ 2009 (L300). | | - Authorisation for activities of processing food and other products of animal origin, pursuant to Regulations 853/ 2004 (L139) or 183/ 2005 (L35) or 1069/ 2009 (L300). |
| | - Permit for the construction of a port project and the use of the seashore and beach, if required. | | - Permit for the construction of a port project and the use of the seashore and beach, if required. |
| − | |process_evidence_submission_type=Keep within business establishment | + | |process_evidence_submission_type=Keep within business establishment |
| | }} | | }} |
| − | {{process rules | + | {{Process sdg |
| − | |process_rule_type=Law | + | |process_sdg_code=N1 |
| − | |process_rule_decision_number=4711 | + | |process_sdg_title=Acquiring licences, authorisations or permits |
| − | |process_rule_decision_year=2020 | + | |process_sdg_description=acquiring licences, authorisations or permits with a view to starting and operating a business in Greece |
| − | |process_rule_description=Amending Law 4442/2016.
| |
| − | |process_rule_gazette_doc_number=145
| |
| − | |process_rule_gazette_doc_issue=Α
| |
| − | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wHUdWr4xouZundtvSoClrL8-zFLpBf_Zex5MXD0LzQTLWPU9yLzB8V68knBzLCmTXKaO6fpVZ6Lx9hLslJUqeiQ98pb_MWo685h0KNYxc6960NWDC83dOLGbGE4sLMS_ww.
| |
| | }} | | }} |
| − | {{process rules | + | {{Process provision digital locations |
| − | |process_rule_type=Law
| + | |process_provision_digital_location_title=EUGO portal (information only) |
| − | |process_rule_decision_number=4549
| + | |process_provision_digital_location_url=https://eugo.gov.gr/en/services/f465c484-24b8-4c94-8842-55e387744025/ |
| − | |process_rule_decision_year=2018
| |
| − | |process_rule_article=71, 72, 79 | |
| − | |process_rule_description=Specifically :
| |
| − | - Articles 71, 79 -Amending Law 4442/ 2016 (replacing article 17),
| |
| − | - Article 72 -Amending Law 4442/2016 (amending article 18, about fees).
| |
| − | |process_rule_gazette_doc_number=105 | |
| − | |process_rule_gazette_doc_issue=Α
| |
| − | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wG3UHk-ZeQumndtvSoClrL8LCLHE8WeG_Z5MXD0LzQTLWPU9yLzB8V68knBzLCmTXKaO6fpVZ6Lx9hLslJUqeiQsvQaGYdXSGswOCu4mpVXpHJTOywXYYFN5uMLcwFRIF8.
| |
| | }} | | }} |
| − | {{process rules | + | {{Process provision digital locations |
| − | |process_rule_type=Law
| + | |process_provision_digital_location_title=Notify Business Portal |
| − | |process_rule_decision_number=4442
| + | |process_provision_digital_location_url=https://notifybusiness.gov.gr/assets/index.html |
| − | |process_rule_decision_year=2016 | |
| − | |process_rule_article=11,17, 25
| |
| − | |process_rule_description=Article 11: Fees,
| |
| − | Article 17: Facilitation of operating food and beverage manufacturing activities,
| |
| − | Article 25: Abolishment of article 2 τof MD 5045/116550/2015.
| |
| − | |process_rule_gazette_doc_number=230 | |
| − | |process_rule_gazette_doc_issue=Α
| |
| − | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wFHp_31M9ESQXdtvSoClrL8zS83ZvoDVVR5MXD0LzQTLWPU9yLzB8V68knBzLCmTXKaO6fpVZ6Lx9hLslJUqeiQXIqwrD8C8OPWyw5EsGKSLDPAW8sxNE-LO5NpDpPt7TQ.
| |
| | }} | | }} |
| − | {{process rules | + | {{Process nace |
| − | |process_rule_type=Law
| + | |process_nace_code=11.02 |
| − | |process_rule_decision_number=4336
| + | |process_nace_description=Manufacture of wine from grape |
| − | |process_rule_decision_year=2015
| |
| − | |process_rule_article=2 | |
| − | |process_rule_description=Paragraph D, Subparagraph D.11- Abolishment JMD 11787/2011 (Carrying out via KEP-EKE).
| |
| − | |process_rule_gazette_doc_number=94 | |
| − | |process_rule_gazette_doc_issue=Α
| |
| − | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wE4q6ggiv8WTXdtvSoClrL8f8uEKElbw5ntIl9LGdkF53UIxsx942CdyqxSQYNuqAGCF0IfB9HI6hq6ZkZV96FIQhrYj5VIEM7IKETejyQzEp0X31zuuB7j5aJvcQoKXAc.
| |
| | }} | | }} |
| − | {{process rules | + | {{Process evidences cost |
| − | |process_rule_type=Joint Ministerial Decision | + | |process_evidence_cost_num_id=1 |
| − | |process_rule_decision_number=14684/914/Φ15 | + | |process_evidence_cost_alternative=No |
| − | |process_rule_decision_year=2012 | + | |process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage) |
| − | |process_rule_article=1
| + | |process_evidence_cost_description=For the submission of the notification, the deposit of administrative fee is required |
| − | |process_rule_description=Delineation of fees in article 28 par. 4 of Law 3982/2011 and delineation of inspectors compensation. | + | |process_evidence_cost_min=100 |
| − | |process_rule_gazette_doc_number=3533 | + | |process_evidence_cost_max=100 |
| − | |process_rule_gazette_doc_issue=Β | + | |process_evidence_cost_payment_type=Bank cashier, Digital (web banking) |
| − | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wEbA_BZxkczbHdtvSoClrL8zW0YBcYgjYS4ndCieBbLVuJInJ48_97uHrMts-zFzeyCiBSQOpYnT00MHhcXFRTsLgnr8z1cXao8UROFutEGhR-bZTqfltBZx0Jo_RhL2Ds. | |
| | }} | | }} |
| − | {{process rules | + | {{Process evidences cost |
| − | |process_rule_type=Ministerial Decision | + | |process_evidence_cost_num_id=2 |
| − | |process_rule_decision_number=64618/856/Φ15 | + | |process_evidence_cost_alternative=No |
| − | |process_rule_decision_year=2018 | + | |process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage) |
| − | |process_rule_article=1 | + | |process_evidence_cost_description=Calculated as the 30 % of the fee paid for the approval of the establishment/installation: |
| − | |process_rule_description=Amending MD 483/35/Φ.15/2012 (replacing articles 1 to 9).
| + | Administrative fees for granting an installation authorisation: |
| − | |process_rule_gazette_doc_number=2278
| + | i. For activities requiring mechanical equipment of a value up to three hundred thousand (300.000) euros and installed power up to 200 KW, an administrative fee of two hundred (200) euros shall be paid. |
| − | |process_rule_gazette_doc_issue=Β
| + | ii. For activities requiring mechanical equipment of a value up to six hundred thousand (600.000) euros and installed power up to 400 KW, an administrative fee of three hundred (300) euros shall be paid. |
| − | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wG3UHk-ZeQumndtvSoClrL8liRx8Eq_4LLuFUDqazHcNeJInJ48_97uHrMts-zFzeyCiBSQOpYnT00MHhcXFRTsyal-Bz3s_XD2iAAQTLerAxmjzwX7d8f6W6ltCowBYaY.
| + | iii. For activities requiring mechanical equipment of a value up to one million (1.000.000) euros and installed power up to 1.000 KW, an administrative fee of four hundred (400) euros shall be paid. |
| − | }}
| + | iv. For activities requiring mechanical equipment of a value up to two million (2.000.000) euros and installed power up to 2.000 KW, an administrative fee of five hundred (500) euros shall be paid. |
| − | {{process rules
| + | v. For activities requiring mechanical equipment of a value up to three million (3.000.000) euros and installed power up to 4.000 KW, an administrative fee of six hundred (600) euros shall be paid. |
| − | |process_rule_type=Ministerial Decision
| + | vi. For activities requiring mechanical equipment of a value superior to three million (3.000.000) euros and consuming over 4.000 KW of power, an administrative fee amounting to zero point three per thousand (0,3‰) of the value of the mechanical equipment and not exceeding five thousand (5.000) euros. |
| − | |process_rule_decision_number=483/35/Φ.15
| + | These administrative fees are also payable in every case of granting the authorisation of an installation, extension or modernisation, the amount being calculated upon the basis of the value and power of the mechanical equipment of the extension or modernisation. |
| − | |process_rule_decision_year=2012
| + | |process_evidence_cost_min=200 |
| − | |process_rule_description=Delineation of type, required documents and process for installing and operating manufacturing activities of Law Ν. 3982/2011 (GG Α΄143), and of modification and renewal of permits along with the deadline for transfer or technical rebuilding.
| + | |process_evidence_cost_max=5000 |
| − | |process_rule_gazette_doc_number=158
| + | |process_evidence_cost_payment_type=Bank cashier, Digital (web banking) |
| − | |process_rule_gazette_doc_issue=Β
| |
| − | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wEbA_BZxkczbHdtvSoClrL84yO_9F7QSVt5MXD0LzQTLf7MGgcO23N88knBzLCmTXKaO6fpVZ6Lx9hLslJUqeiQd1LylGVS2deoH9MScBIVO2qtT19xm2DEtEaryh0yxDA.
| |
| − | }}
| |
| − | {{process rules
| |
| − | |process_rule_type=Ministerial Decision
| |
| − | |process_rule_decision_number=5045/116550
| |
| − | |process_rule_decision_year=2015
| |
| − | |process_rule_description=Delineation of details for the production of rectified concentrated grape must/ grape sugar
| |
| − | |process_rule_gazette_doc_number=2323
| |
| − | |process_rule_gazette_doc_issue=Β
| |
| − | |process_rule_url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wE4q6ggiv8WTXdtvSoClrL8noyF6ARJ3CO4ndCieBbLVuJInJ48_97uHrMts-zFzeyCiBSQOpYnT00MHhcXFRTsxlGzt23eRmjXBZE8hD5Swp9xzN82XrwgsDZ0H9jX10s.
| |
| − | }}
| |
| − | {{process steps digital
| |
| − | |process_step_digital_num_id=1
| |
| − | |process_step_digital_exit=No
| |
| − | |process_step_digital_child=No
| |
| − | |process_step_digital_title=Submission of notification
| |
| − | |process_step_digital_official=Institutional software
| |
| − | |process_step_digital_implementation=Software action
| |
| − | |process_step_digital_url=https://notifybusiness.gov.gr/assets/index.html
| |
| − | |process_step_digital_duration_min=1
| |
| − | |process_step_digital_duration_max=1
| |
| − | |process_step_digital_duration_type=Hours
| |
| − | |process_step_digital_description=Submission of notification in accordance with article 6 of Law 4442/2016, through the notifybusiness.gov.gr site.
| |
| − | Each notification submitted automatically receives a document reference (“protocol”) number from the system, as well as a unique declaration number.
| |
| − | The interested party receives from the system a receipt for the submission of the notification, to be included in the file kept at the installation.
| |
| − | }}
| |
| − | {{process provision digital locations
| |
| − | |process_provision_digital_location_title=EUGO portal (information only) | |
| − | |process_provision_digital_location_url=https://eugo.gov.gr/en/services/f465c484-24b8-4c94-8842-55e387744025/
| |
| − | }}
| |
| − | {{process provision digital locations
| |
| − | |process_provision_digital_location_title=Notify Business Portal | |
| − | |process_provision_digital_location_url=https://notifybusiness.gov.gr/assets/index.html | |
| | }} | | }} |