|
|
Line 283: |
Line 283: |
| |process_step_duration_min=60 | | |process_step_duration_min=60 |
| |process_step_duration_max=120 | | |process_step_duration_max=120 |
− | |process_step_description=The Head of the Office responsible for Preventive and Repressive Fire Safety, after entering with his personal codes in the E-empty Information System, with the help of the search tools, selects the category ‘In an unsolicited check-in procedure’ for the application ‘Edition of a temporary certificate (active) fire protection’. https://web.tee.gr/e-adeies/egkriseis-py/ | + | |process_step_description=The Head of the Office responsible for Preventive and Repressive Fire Safety, after entering with his personal codes in the e-adeies Information System, with the help of the search tools, selects the category ‘In an unsolicited check-in procedure’ for the application ‘Edition of a temporary certificate (active) fire protection’. https://web.tee.gr/e-adeies/egkriseis-py/ |
| |process_step_note=At this stage the status of the application for a provisional certificate (active) fire protection is ‘In submission’ and one or more of its checks have not yet been assigned to auditors. | | |process_step_note=At this stage the status of the application for a provisional certificate (active) fire protection is ‘In submission’ and one or more of its checks have not yet been assigned to auditors. |
| }} | | }} |
Line 296: |
Line 296: |
| |process_step_duration_max=300 | | |process_step_duration_max=300 |
| |process_step_description=The Head of the Office responsible for Preventive and Repressive Fire Safety Branch shall select the "Response for Control", where all necessary checks designated by the authorised engineer for the application for a "Edition of a Temporary Fire Safety Certificate". By selecting each individual check, he shall specify the name of the Controller from the list available, assigning all the required control data. | | |process_step_description=The Head of the Office responsible for Preventive and Repressive Fire Safety Branch shall select the "Response for Control", where all necessary checks designated by the authorised engineer for the application for a "Edition of a Temporary Fire Safety Certificate". By selecting each individual check, he shall specify the name of the Controller from the list available, assigning all the required control data. |
− | |process_step_note=At this stage the status of the application for a provisional certificate (active) fire protection is ‘Inspected’. Co-organisation: Hellenic EMERGENCY Association: https://web.tee.gr/e-adeies/egkriseis-py/ | + | |process_step_note=At this stage the status of the application for a temporary certificate of (active) fire protection is ‘Inspected’. Co-organisation: Hellenic EMERGENCY Association: https://web.tee.gr/e-adeies/egkriseis-py/ |
| }} | | }} |
| {{process steps | | {{process steps |
Line 376: |
Line 376: |
| |process_step_digital_duration_min=60 | | |process_step_digital_duration_min=60 |
| |process_step_digital_duration_max=120 | | |process_step_digital_duration_max=120 |
− | |process_step_digital_description=After entering their personal codes in the ‘e-Licences’ information system using the search tools, the head of the competent office local fire safety prevention and suppression department selects the category ‘Pending assignment for review’ to the application for ‘Issue of an interim (active) fire safety certificate’. | + | |process_step_digital_description=After entering their personal codes in the ‘e-adeies’ information system using the search tools, the head of the competent office local fire safety prevention and suppression department selects the category ‘Pending assignment for review’ to the application for ‘Issue of a temporary (active) fire safety certificate’. |
− | |process_step_digital_note=At this stage, the status of the application for ‘Issue of an interim (active) fire protection certificate’ is ‘Submitted’, and responsibility for one or more of the checks required has not yet been assigned to an inspector or inspectors | + | |process_step_digital_note=At this stage, the status of the application for ‘Issue of a temporary (active) fire protection certificate’ is ‘Submitted’, and responsibility for one or more of the checks required has not yet been assigned to an inspector or inspectors |
| }} | | }} |
| {{process steps digital | | {{process steps digital |
Line 387: |
Line 387: |
| |process_step_digital_duration_min=60 | | |process_step_digital_duration_min=60 |
| |process_step_digital_duration_max=300 | | |process_step_digital_duration_max=300 |
− | |process_step_digital_description=The head of the competent office local fire safety prevention and suppression department shall select ‘Assignment for review’, where all the necessary checks set out in the authorised engineer’s application for ‘Issue of an interim (active) fire protection certificate’ will be indicated. Each individual item requiring review will be assigned to an inspector selected from the list of available persons. | + | |process_step_digital_description=The head of the competent office local fire safety prevention and suppression department shall select ‘Assignment for review’, where all the necessary checks set out in the authorised engineer’s application for ‘Issue of a temporary (active) fire protection certificate’ will be indicated. Each individual item requiring review will be assigned to an inspector selected from the list of available persons. |
| |process_step_digital_note=At this stage, the status of the application for ‘Issue of an interim (active) fire protection certificate’ is ‘Under review’ | | |process_step_digital_note=At this stage, the status of the application for ‘Issue of an interim (active) fire protection certificate’ is ‘Under review’ |
| }} | | }} |