Line 208: |
Line 208: |
| |process_evidence_owner=Persons | | |process_evidence_owner=Persons |
| |process_evidence_description=Copy of a sworn declaration submitted to the ‘E-Licences’ information system to obtain issue of a building permit, or to the information system for the processing of declarations for unauthorised buildings, or a hard copy from the printout file of the competent building service indicating the proper execution of plans for a category I, II or III LPG installation, in accordance with Article 3(3.1.2.4) of Joint Ministerial Decision 31856/2003 (Government Gazette, Series II, No 1257). | | |process_evidence_description=Copy of a sworn declaration submitted to the ‘E-Licences’ information system to obtain issue of a building permit, or to the information system for the processing of declarations for unauthorised buildings, or a hard copy from the printout file of the competent building service indicating the proper execution of plans for a category I, II or III LPG installation, in accordance with Article 3(3.1.2.4) of Joint Ministerial Decision 31856/2003 (Government Gazette, Series II, No 1257). |
− | |process_evidence_note=supporting document (required in certain cases) as per Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) for the issue of an interim (active) fire protection certificate with or without on-site inspection. | + | |process_evidence_note=supporting document (required in certain cases) as per Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) for the issue of a temporary (active) fire protection certificate with or without on-site inspection. |
| FOOTNOTES: | | FOOTNOTES: |
− | 1. if an interim (active) fire protection certificate is granted, all mandatory and other supporting documents, as required, must be submitted in relation to passive/structural and active fire protection means and measures installed on the basis of the fire protection studies, with the exception of those that have not been completed, which shall be expressly indicated in the sworn declarations. | + | 1. if a temporary (active) fire protection certificate is granted, all mandatory and other supporting documents, as required, must be submitted in relation to passive/structural and active fire protection means and measures installed on the basis of the fire protection studies, with the exception of those that have not been completed, which shall be expressly indicated in the sworn declarations. |
| 2. An active fire protection certificate is granted in the case of business undertakings or installations falling within the scope of building fire protection regulations (Presidential Decree No 41/2018 (Government Gazette, Series I, No 80) or Presidential Decree No 71/1988 (Government Gazette, Series I, No 32). Business undertakings and facilities subject to other regulatory provisions on fire safety will be issued with a fire protection certificate (Article 2, Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) – Definitions). | | 2. An active fire protection certificate is granted in the case of business undertakings or installations falling within the scope of building fire protection regulations (Presidential Decree No 41/2018 (Government Gazette, Series I, No 80) or Presidential Decree No 71/1988 (Government Gazette, Series I, No 32). Business undertakings and facilities subject to other regulatory provisions on fire safety will be issued with a fire protection certificate (Article 2, Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) – Definitions). |
| }} | | }} |
Line 222: |
Line 222: |
| |process_evidence_owner=Persons | | |process_evidence_owner=Persons |
| |process_evidence_description=Licence to use natural gas under the current legislative framework governing the installation and use of natural gas, as required | | |process_evidence_description=Licence to use natural gas under the current legislative framework governing the installation and use of natural gas, as required |
− | |process_evidence_note=supporting document (required in certain cases) as per Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) for the issue of an interim (active) fire protection certificate with or without on-site inspection. | + | |process_evidence_note=supporting document (required in certain cases) as per Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) for the issue of a temporary (active) fire protection certificate with or without on-site inspection. |
| FOOTNOTES: | | FOOTNOTES: |
− | 1. if an interim (active) fire protection certificate is granted, all mandatory and other supporting documents, as required, must be submitted in relation to passive/structural and active fire protection means and measures installed on the basis of the fire protection studies, with the exception of those that have not been completed, which shall be expressly indicated in the sworn declarations. | + | 1. if a temporary (active) fire protection certificate is granted, all mandatory and other supporting documents, as required, must be submitted in relation to passive/structural and active fire protection means and measures installed on the basis of the fire protection studies, with the exception of those that have not been completed, which shall be expressly indicated in the sworn declarations. |
| 2. An active fire protection certificate is granted in the case of business undertakings or installations falling within the scope of building fire protection regulations (Presidential Decree No 41/2018 (Government Gazette, Series I, No 80) or Presidential Decree No 71/1988 (Government Gazette, Series I, No 32). Business undertakings and facilities subject to other regulatory provisions on fire safety will be issued with a fire protection certificate (Article 2, Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) – Definitions). | | 2. An active fire protection certificate is granted in the case of business undertakings or installations falling within the scope of building fire protection regulations (Presidential Decree No 41/2018 (Government Gazette, Series I, No 80) or Presidential Decree No 71/1988 (Government Gazette, Series I, No 32). Business undertakings and facilities subject to other regulatory provisions on fire safety will be issued with a fire protection certificate (Article 2, Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) – Definitions). |
| }} | | }} |
Line 235: |
Line 235: |
| |process_evidence_submission_type=Submitted by the applicant (digital) | | |process_evidence_submission_type=Submitted by the applicant (digital) |
| |process_evidence_owner=Persons | | |process_evidence_owner=Persons |
− | |process_evidence_description=A reasoned report by the facility operator, with any supporting documents attached, stating the reasons for the failing to complete installation of fire protection measures or equipment, the deadline for completion, and the proposed compensatory measures and fire protection equipment to be used until completion, in the event of the award of an interim (active) fire protection certificate | + | |process_evidence_description=A reasoned report by the facility operator, with any supporting documents attached, stating the reasons for the failing to complete installation of fire protection measures or equipment, the deadline for completion, and the proposed compensatory measures and fire protection equipment to be used until completion, in the event of the award of a temporary (active) fire protection certificate |
− | |process_evidence_note=: supporting document (required in certain cases) as per Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) for the issue of an interim (active) fire protection certificate with or without on-site inspection. | + | |process_evidence_note=Supporting document (required in certain cases) as per Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) for the issue of a temporary (active) fire protection certificate with or without on-site inspection. |
| FOOTNOTES: | | FOOTNOTES: |
− | 1. if an interim (active) fire protection certificate is granted, all mandatory and other supporting documents, as required, must be submitted in relation to passive/structural and active fire protection means and measures installed on the basis of the fire protection studies, with the exception of those that have not been completed, which shall be expressly indicated in the sworn declarations. | + | 1. if a temporary (active) fire protection certificate is granted, all mandatory and other supporting documents, as required, must be submitted in relation to passive/structural and active fire protection means and measures installed on the basis of the fire protection studies, with the exception of those that have not been completed, which shall be expressly indicated in the sworn declarations. |
| 2. An active fire protection certificate is granted in the case of business undertakings or installations falling within the scope of building fire protection regulations (Presidential Decree No 41/2018 (Government Gazette, Series I, No 80) or Presidential Decree No 71/1988 (Government Gazette, Series I, No 32). Business undertakings and facilities subject to other regulatory provisions on fire safety will be issued with a fire protection certificate (Article 2, Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) – Definitions). | | 2. An active fire protection certificate is granted in the case of business undertakings or installations falling within the scope of building fire protection regulations (Presidential Decree No 41/2018 (Government Gazette, Series I, No 80) or Presidential Decree No 71/1988 (Government Gazette, Series I, No 32). Business undertakings and facilities subject to other regulatory provisions on fire safety will be issued with a fire protection certificate (Article 2, Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) – Definitions). |
| }} | | }} |
Line 250: |
Line 250: |
| |process_evidence_owner=Persons | | |process_evidence_owner=Persons |
| |process_evidence_description=The articles of association of the company, in which the details of its legal representative(s) responsible for signature of the solemn declaration(s) are indicated | | |process_evidence_description=The articles of association of the company, in which the details of its legal representative(s) responsible for signature of the solemn declaration(s) are indicated |
− | |process_evidence_note=supporting document (required in certain cases) as per Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) for the issue of an interim (active) fire protection certificate with or without on-site inspection. | + | |process_evidence_note=Supporting document (required in certain cases) as per Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519) for the issue of a temporary (active) fire protection certificate with or without on-site inspection. |
| FOOTNOTES: | | FOOTNOTES: |
| 1. if an interim (active) fire protection certificate is granted, all mandatory and other supporting documents, as required, must be submitted in relation to passive/structural and active fire protection means and measures installed on the basis of the fire protection studies, with the exception of those that have not been completed, which shall be expressly indicated in the sworn declarations. | | 1. if an interim (active) fire protection certificate is granted, all mandatory and other supporting documents, as required, must be submitted in relation to passive/structural and active fire protection means and measures installed on the basis of the fire protection studies, with the exception of those that have not been completed, which shall be expressly indicated in the sworn declarations. |