Difference between revisions of "ΔΔ:Temporary (active) fire protection certificate"

From National Registry of Administrative Public Services
(Προσθήκη διαδικασίας)
 
Line 1: Line 1:
 
{{process
 
{{process
|process_alternative_titles=Temporary Certificate of Fire protection, Temporary Certificate of Safety
+
|process_uuid=7ab0ec9d-cb80-45c4-a650-76a96d34cf8f
|process_application_description=Temporary certificate (active) of fire protection
+
|process_id=709804
|process_application_note=From the date of entry into force of the information system, in accordance with the accreditation act of the President of the TEI, provided for in the FPI No. PNEN/DACC/933111/3679/2021 Decision of the Secretary of State for Environment and Energy (B'4874), the procedure for the submission, verification, management and monitoring of the workflow for the adoption of this administrative fire protection acts shall be carried out electronically through the information system ‘E-Authorities’, upon request by an authorised engineer and the submission of the necessary documents and evidence. Access to the ‘E-Authorities’, with regard to the adoption of the administrative fire protection acts, shall be carried out through the Single Digital Portal of Public Administration (Gov.gr), which shall be used by all stakeholders in the procedures for the adoption of those acts, namely the competent Firefighting Services (Futures or Local DCFS).
+
|process_official_title=Interim (active) fire protection certificate
|process_application_owner=Persons
+
|process_alternative_titles=Issue of an interim (active) fire protection certificate
|process_application_submission_type=Submitted by the applicant (digital)
+
Issue of an interim fire safety certificate, Issue of an interim fire safety certificate
|process_application_type=Application
+
|process_description=The procedure concerns the issuing of an interim (active) fire protection certificate.
|process_cost_max=15.0
+
|process_org_owner_is_private=No
|process_cost_min=15.0
+
|process_org_owner=12403
 +
|process_provision_org_directory=Fire safety offices, local (prevention and suppression) fire safety departments
 +
|process_remarks=the competent fire service (offices or local fire safety prevention and suppression departments) may issue a one-time interim (active) fire protection certificate, after the submission of the respective application and supporting documents as indicated in Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), accompanied by a reasoned report from the operator, to business undertakings and facilities that:
 +
a) fall within the scope of Article 1(2) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but have not fully completed their obligation to install a permanent water-based fire suppression network or an automatic fire suppression system.
 +
b) fall within the scope of Article 1(2.1) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but for which deviations from the passive fire protection study description have been identified, which affect aspects of the active fire protection study (Annex B).
 +
c) fall within the scope of Article 1(2.2) and (2.3) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but which have not fully implemented their obligations with regard to integrated structural fire protection features.
 +
Unless otherwise stipulated by fire department or special fire protection provisions, the duration of the interim (active) fire protection certificate may not exceed six (6) months.
 +
Undertakings and facilities that have already been granted an interim (active) fire protection certificate do not have the right to seek reissue.
 +
A prerequisite for the granting of an interim (active) fire protection certificate is completion of the remaining fire protection measures and the installation of equipment provided for in the respective study. This certificate shall also specify any additional or increased fire protection measures and equipment required by the fire department and the deadlines by which they must be completed.
 +
As of entry into force of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), paragraph 63 of Joint Ministerial Decision No 3021/19/6/1986 ‘Limitation of certificates and other supporting documents required by the current provisions for the processing of citizens’ cases by public sector services’ is no longer applicable (Government Gazette, Series II, No 847).
 
|process_deadline_duration=4320000
 
|process_deadline_duration=4320000
|process_description=The procedure concerns the issue of a provisional certificate of (energy) fire protection.
+
|process_evidence_identification_type=Other
|process_evidence_alternative_total_number=0
+
|process_evidence_identification_type_other=Access Codes for My TEE.
 +
|process_type=Outgoing
 +
|process_trigger=Applied for
 +
|process_trigger_type=Application (digital)
 +
|process_usage=Digital supporting Document, Input in another process
 +
|process_output_type=Administrative Act, Digital document production, Launch another procedure
 +
|process_validity_duration=15552000
 +
|process_source=EU-GO (support), gov.gr
 +
|process_provided_to=Engineers,Engineers
 +
|process_tax_type=Approvals,Audits,Notifications
 +
|process_life_events=Business establishment and operation,Operation of gas and energy stations,Operation of repair and maintenance services for motor vehicles,Operation of vehicle service establishments,Retail trade - Wholesale,Pharmacy operation,Pharmacy operation
 +
|process_sdg_notes=In order to withdraw, amend or cancel the administrative act, the person concerned may lodge a request for treatment - hierarchical action as referred to in Article 24 of Law 2690/1999 (45 A) as applicable. The issue of a provisional certificate (active) fire protection as well as other administrative fire protection acts shall be governed by Law 2690/1999.
 +
|process_total_duration_steps_min=180
 +
|process_total_duration_steps_max=540
 +
|process_total_duration_steps_digital_min=0
 +
|process_total_duration_steps_digital_max=0
 +
|process_cost_min=15.00
 +
|process_cost_max=15.00
 
|process_evidence_cost_guarantee=0
 
|process_evidence_cost_guarantee=0
 
|process_evidence_cost_total_number=0
 
|process_evidence_cost_total_number=0
 
|process_evidence_ex_officio_total_number=0
 
|process_evidence_ex_officio_total_number=0
|process_evidence_identification_type=Other
+
|process_evidence_alternative_total_number=0
|process_evidence_identification_type_other=Access Codes for My TEE.
 
 
|process_evidence_prerequisite_total_number=5
 
|process_evidence_prerequisite_total_number=5
 +
|process_evidence_total_number=4
 +
|process_evidence_step_total_number=0
 
|process_evidence_step_digital_total_number=0
 
|process_evidence_step_digital_total_number=0
|process_evidence_step_total_number=0
+
|process_application_type=Application
|process_evidence_total_number=4
+
|process_application_submission_type=Submitted by the applicant (digital)
|process_id=709804
+
|process_application_owner=Persons
|process_life_events=Business establishment and operation, Operation of vehicle service establishments, Operation of gas and energy stations, Operation of repair and maintenance services for motor vehicles, Retail trade - Wholesale, Pharmacy operation, Pharmacy operation
+
|process_application_description=Temporary certificate (active) of fire protection
|process_official_title=Temporary Certificate (Environmental)
+
|process_application_note=From the date of entry into force of the information system, in accordance with the accreditation act of the President of the TEI, provided for in the FPI No. PNEN/DACC/933111/3679/2021 Decision of the Secretary of State for Environment and Energy (B'4874), the procedure for the submission, verification, management and monitoring of the workflow for the adoption of this administrative fire protection acts shall be carried out electronically through the information system ‘E-Authorities’, upon request by an authorised engineer and the submission of the necessary documents and evidence. Access to the ‘E-Authorities’, with regard to the adoption of the administrative fire protection acts, shall be carried out through the Single Digital Portal of Public Administration (Gov.gr), which shall be used by all stakeholders in the procedures for the adoption of those acts, namely the competent Firefighting Services (Futures or Local DCFS).
|process_org_owner=12403
 
|process_org_owner_is_private=No
 
|process_output_type=Administrative Act, Launch another procedure, Digital document production
 
|process_provided_to=Engineers
 
|process_provision_org_directory=Fire Safety Offices, Local Occupational and Repressive Fire Safety Branches
 
|process_remarks=Η αρμόδια Πυροσβεστική Υπηρεσία (Γραφεία ή Τοπικά Παραρτήματα Προληπτικής και Κατασταλτικής Πυρασφάλειας) δύναται κατόπιν υποβολής σχετικής αίτησης, να εκδίδει άπαξ προσωρινό πιστοποιητικό (ενεργητικής) πυροπροστασίας, και την υποβολή των δικαιολογητικών της 1ης Περίπτωσης του Παραρτήματος Γ της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 B΄), συνοδευόμενη από αιτιολογημένη έκθεση του φορέα, στις επιχειρήσεις - εγκαταστάσεις που:
 
α.) Εμπίπτουν στο πεδίο εφαρμογής της παρ. 2 του άρθρου 1 της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄) που δεν έχουν υλοποιήσει πλήρως την υποχρέωσή τους για την εγκατάσταση Μόνιμου Υδροδοτικού Πυροσβεστικού Δικτύου ή Αυτόματου Συστήματος Πυρόσβεσης.
 
β.) Εμπίπτουν στο πεδίο εφαρμογής της παρ. 2.1. του άρθρου 1 της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄) και για τις οποίες διαπιστώνονται αποκλίσεις από τα στοιχεία της μελέτης παθητικής πυροπροστασίας, που επιδρούν στα στοιχεία της μελέτης ενεργητικής πυροπροστασίας (Παράρτημα Β).
 
γ.) Εμπίπτουν στο πεδίο εφαρμογής των παρ. 2.2. και 2.3. του άρθρου 1 της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄) που δεν έχουν υλοποιήσει πλήρως την υποχρέωσή τους για τα στοιχεία δομικής πυροπροστασίας.
 
Εφόσον δεν ορίζεται διαφορετική χρονική διάρκεια ισχύος από πυροσβεστικές ή ειδικές διατάξεις πυροπροστασίας, η διάρκεια του προσωρινού πιστοποιητικού (ενεργητικής) πυροπροστασίας δεν μπορεί να υπερβαίνει τους έξι (6) μήνες.
 
Σε επιχειρήσεις - εγκαταστάσεις στις οποίες έχει ήδη χορηγηθεί προσωρινό πιστοποιητικό (ενεργητικής) πυροπροστασίας, δεν παρέχεται το δικαίωμα εκ νέου χορήγησης.
 
Απαραίτητη προϋπόθεση για τη χορήγηση του προσωρινού πιστοποιητικού (ενεργητικής) πυροπροστασίας, είναι η λήψη και εγκατάσταση των λοιπών προβλεπόμενων στη μελέτη μέτρων και μέσων πυροπροστασίας. Στο πιστοποιητικό αυτό καθορίζονται και τυχόν επιπρόσθετα ή αυξημένα μέτρα και μέσα πυροπροστασίας που θα απαιτηθούν από την Πυροσβεστική Υπηρεσία και ο χρόνος για τον οποίο πρέπει να ληφθούν.
 
Από την έναρξη ισχύος της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄) καταργείται η παρ. 63 της υπ’ αριθμ. 3021/19/6/1986 κοινής υπουργικής απόφασης «Περιορισμός πιστοποιητικών και άλλων δικαιολογητικών που απαιτούνται από τις κείμενες διατάξεις για τη διεκπεραίωση υποθέσεων των πολιτών από υπηρεσίες του δημόσιου τομέα» (847 Β΄).
 
|process_sdg_notes=In order to withdraw, amend or cancel the administrative act, the person concerned may lodge a request for treatment - hierarchical action as referred to in Article 24 of Law 2690/1999 (45 A) as applicable. The issue of a provisional certificate (active) fire protection as well as other administrative fire protection acts shall be governed by Law 2690/1999.
 
|process_source=EU-GO (support), gov.gr
 
|process_tax_type=, , Approvals, Notifications, Audits
 
|process_total_duration_steps_digital_max=0
 
|process_total_duration_steps_digital_min=0
 
|process_total_duration_steps_max=540
 
|process_total_duration_steps_min=180
 
|process_trigger=Applied for
 
|process_trigger_type=Application (digital)
 
|process_type=Outgoing
 
|process_usage=Input in another process, Digital supporting Document
 
|process_uuid=7ab0ec9d-cb80-45c4-a650-76a96d34cf8f
 
|process_validity_duration=15552000
 
 
}}
 
}}
 
{{process conditions
 
{{process conditions
 +
|process_conditions_num_id=1
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
 +
|process_conditions_type=Educational
 
|process_conditions_name=To hold a diploma in engineering corresponding to his specialty, higher education multi-technical schools on the national level.
 
|process_conditions_name=To hold a diploma in engineering corresponding to his specialty, higher education multi-technical schools on the national level.
|process_conditions_num_id=1
 
|process_conditions_type=Educational
 
 
|process_conditions_url=https://web.tee.gr/d-e-d/tmima-epaggelmatikon-thematon/isotimies/
 
|process_conditions_url=https://web.tee.gr/d-e-d/tmima-epaggelmatikon-thematon/isotimies/
 
}}
 
}}
 
{{process conditions
 
{{process conditions
 +
|process_conditions_num_id=2
 
|process_conditions_alternative=Yes
 
|process_conditions_alternative=Yes
 +
|process_conditions_alternative_of_selector=1
 
|process_conditions_alternative_of=1
 
|process_conditions_alternative_of=1
|process_conditions_alternative_of_selector=1
+
|process_conditions_type=Educational
 
|process_conditions_name=To hold a diploma in engineering corresponding to his specialty in the multi-technical schools of higher education institutions of the national territory.
 
|process_conditions_name=To hold a diploma in engineering corresponding to his specialty in the multi-technical schools of higher education institutions of the national territory.
|process_conditions_num_id=2
 
|process_conditions_type=Educational
 
 
|process_conditions_url=https://web.tee.gr/d-e-d/tmima-epaggelmatikon-thematon/isotimies/
 
|process_conditions_url=https://web.tee.gr/d-e-d/tmima-epaggelmatikon-thematon/isotimies/
 
}}
 
}}
 
{{process conditions
 
{{process conditions
 +
|process_conditions_num_id=3
 
|process_conditions_alternative=Yes
 
|process_conditions_alternative=Yes
 +
|process_conditions_alternative_of_selector=1
 
|process_conditions_alternative_of=1
 
|process_conditions_alternative_of=1
|process_conditions_alternative_of_selector=1
+
|process_conditions_type=Educational
 
|process_conditions_name=To hold a diploma in engineering corresponding to the specialty of equal foreign schools.
 
|process_conditions_name=To hold a diploma in engineering corresponding to the specialty of equal foreign schools.
|process_conditions_num_id=3
 
|process_conditions_type=Educational
 
 
|process_conditions_url=https://web.tee.gr/d-e-d/tmima-epaggelmatikon-thematon/isotimies/
 
|process_conditions_url=https://web.tee.gr/d-e-d/tmima-epaggelmatikon-thematon/isotimies/
 
}}
 
}}
 
{{process conditions
 
{{process conditions
 +
|process_conditions_num_id=4
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
 +
|process_conditions_type=Professional
 
|process_conditions_name=He has obtained permission to pursue a profession by the Technical Chamber of Greece to become a mandatory member and to hold the title of "Diplomatic Engineer - Members T.E.".
 
|process_conditions_name=He has obtained permission to pursue a profession by the Technical Chamber of Greece to become a mandatory member and to hold the title of "Diplomatic Engineer - Members T.E.".
|process_conditions_num_id=4
 
|process_conditions_type=Professional
 
 
|process_conditions_url=http://portal.tee.gr/portal/page/portal/mhtrwo/mitrwo/mix_search
 
|process_conditions_url=http://portal.tee.gr/portal/page/portal/mhtrwo/mitrwo/mix_search
 
}}
 
}}
 
{{process conditions
 
{{process conditions
 +
|process_conditions_num_id=5
 
|process_conditions_alternative=No
 
|process_conditions_alternative=No
 +
|process_conditions_type=Possession of passwords to enter software
 
|process_conditions_name=To obtain personal passwords for the electronic service 'My TEE'.
 
|process_conditions_name=To obtain personal passwords for the electronic service 'My TEE'.
|process_conditions_num_id=5
+
}}
|process_conditions_type=Possession of passwords to enter software
+
{{process evidences cost
 +
|process_evidence_cost_num_id=1
 +
|process_evidence_cost_alternative=No
 +
|process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage)
 +
|process_evidence_cost_description=Paradoxical for posting to the E-licence Information System of the Temporary Certificate (Energy) application.
 +
|process_evidence_cost_payment_type=Digital (debit / credit card), Digital (web banking)
 +
}}
 +
{{process evidences cost
 +
|process_evidence_cost_num_id=2
 +
|process_evidence_cost_alternative=No
 +
|process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage)
 +
|process_evidence_cost_calculation=One-off
 +
|process_evidence_cost_description=Deposit of the amount of 15 (15) euros in the Special Account of the Firehouse Clubs (040/54613247 - IBAN: GR54011004000000044613247) in the name of the owner - operator or legitimate representative of the company - installation or in the case of the deposit of the fee by e-banking, the Office will be included in the statement on the grounds, compulsory and by which the person concerned will receive the book.
 +
|process_evidence_cost_min=15
 +
|process_evidence_cost_max=15
 +
|process_evidence_cost_payment_type=Bank cashier, Digital (web banking)
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=1
 +
|process_evidence_type=7320
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|registry_evidence_id=7320
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Responsible Statement of Article 8 of Law No 1599/1986 (75 A) of the supervisor or of the person responsible for the authentic signature, that: (a) Confidentiality has been obtained and installed as provided for in the approved study, passive/structural fire protection data having an effect on active fire protection means, all conditions and conditions laid down by the applicable provisions and the applicable fire protection law of the premises for the use of the establishment have been complied with; (b) Receivable and installed as required by the applicable approved fire protection plan and the applicable fire protection legislation for the use of the undertaking; (c) Confirmation measures and means of active fire protection have been complied with; (d) Confidentiality certificates for the use of fire-fighting equipment or fire-fighting equipment (B to 3149) have been received and installed as appropriate, and the approved technical descriptions of the conformity of the fire-fighting equipment and technical documentation of the fire-fighting equipment, as well as specified in the approved declaration of conformity assessment of the conformity assessment of the conformity of the conformity of the conformity of the fire-fighting equipment and technical documentation as required in the conformity of the conformity of the conformity of the conformity of the conformity of the conformity of the operations, as specified in respecting products and/applications in the approved under examinations in the approved in the approved under assessment bodies and/application of the approved in the approved under assessments.
 
|process_evidence_description=Responsible Statement of Article 8 of Law No 1599/1986 (75 A) of the supervisor or of the person responsible for the authentic signature, that: (a) Confidentiality has been obtained and installed as provided for in the approved study, passive/structural fire protection data having an effect on active fire protection means, all conditions and conditions laid down by the applicable provisions and the applicable fire protection law of the premises for the use of the establishment have been complied with; (b) Receivable and installed as required by the applicable approved fire protection plan and the applicable fire protection legislation for the use of the undertaking; (c) Confirmation measures and means of active fire protection have been complied with; (d) Confidentiality certificates for the use of fire-fighting equipment or fire-fighting equipment (B to 3149) have been received and installed as appropriate, and the approved technical descriptions of the conformity of the fire-fighting equipment and technical documentation of the fire-fighting equipment, as well as specified in the approved declaration of conformity assessment of the conformity assessment of the conformity of the conformity of the conformity of the fire-fighting equipment and technical documentation as required in the conformity of the conformity of the conformity of the conformity of the conformity of the conformity of the operations, as specified in respecting products and/applications in the approved under examinations in the approved in the approved under assessment bodies and/application of the approved in the approved under assessments.
|process_evidence_is_under_prerequisite=No
+
|process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration
 +
|process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
 
|process_evidence_note=Υποχρεωτικό δικαιολογητικό της Περίπτωσης 1ης του Παραρτήματος Γ της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄), για την έκδοση προσωρινού πιστοποιητικού (ενεργητικής) πυροπροστασίας χωρίς ή με τη διενέργεια αυτοψίας.
 
|process_evidence_note=Υποχρεωτικό δικαιολογητικό της Περίπτωσης 1ης του Παραρτήματος Γ της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄), για την έκδοση προσωρινού πιστοποιητικού (ενεργητικής) πυροπροστασίας χωρίς ή με τη διενέργεια αυτοψίας.
 
ΥΠΟΣΗΜΕΙΩΣΕΙΣ:
 
ΥΠΟΣΗΜΕΙΩΣΕΙΣ:
Line 100: Line 125:
 
5. Η έννοια της δομικής πυροπροστασίας αναφέρεται σε κτίρια που υπάγονται σε πυροσβεστικές ή ειδικές διατάξεις πυροπροστασίας (παρ. 2.2. και 2.3. του άρθρου 1 και άρθρου 2 - Ορισμοί της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄)).
 
5. Η έννοια της δομικής πυροπροστασίας αναφέρεται σε κτίρια που υπάγονται σε πυροσβεστικές ή ειδικές διατάξεις πυροπροστασίας (παρ. 2.2. και 2.3. του άρθρου 1 και άρθρου 2 - Ορισμοί της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄)).
 
6. Σύμφωνα με το άρθρο 8 του π.δ. 41/2018 (80 Α΄) «…..Ο κύριος του έργου οφείλει να τηρεί αρχείο με τα πιστοποιητικά υλικών και δομικών στοιχείων που εγκαταστάθηκαν στο κτίριο. Με την ενεργοποίηση της ηλεκτρονικής ταυτότητας των κτιρίων, τα ανωτέρω πιστοποιητικά αναρτώνται στον σχετικό ηλεκτρονικό φάκελο του κτιρίου και αποτελούν αναπόσπαστα μέρη αυτού.»
 
6. Σύμφωνα με το άρθρο 8 του π.δ. 41/2018 (80 Α΄) «…..Ο κύριος του έργου οφείλει να τηρεί αρχείο με τα πιστοποιητικά υλικών και δομικών στοιχείων που εγκαταστάθηκαν στο κτίριο. Με την ενεργοποίηση της ηλεκτρονικής ταυτότητας των κτιρίων, τα ανωτέρω πιστοποιητικά αναρτώνται στον σχετικό ηλεκτρονικό φάκελο του κτιρίου και αποτελούν αναπόσπαστα μέρη αυτού.»
|process_evidence_num_id=1
 
|process_evidence_owner=Persons
 
|process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration
 
|process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=7320
 
|registry_evidence_id=7320
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=2
 +
|process_evidence_type=7320
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|registry_evidence_id=7320
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Responsible Statement of Article 8 of Law 1599/86 (75 A) of the owner-occupier, employer or legal representative of the company-installation, that: (a) They have been obtained, installed, well-established and operated in accordance with the requirements of the relevant national, European standards, manufacturers' manuals and 12/2012 Firearms Order (1794 B), as in force each time, and will be maintained, in accordance with the requirements of the relevant national, European standards, manufacturers' manuals and No 12/2012 Firearms Order (1794 B), as each time in force.
 
|process_evidence_description=Responsible Statement of Article 8 of Law 1599/86 (75 A) of the owner-occupier, employer or legal representative of the company-installation, that: (a) They have been obtained, installed, well-established and operated in accordance with the requirements of the relevant national, European standards, manufacturers' manuals and 12/2012 Firearms Order (1794 B), as in force each time, and will be maintained, in accordance with the requirements of the relevant national, European standards, manufacturers' manuals and No 12/2012 Firearms Order (1794 B), as each time in force.
|process_evidence_is_under_prerequisite=No
 
|process_evidence_note=In the case of a provisional certificate (5519 B), for the purpose of issuing a provisional certificate (active) for fire protection without or having an autopsy. NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection certificate, all mandatory and other supporting documents, if required, shall be provided for measures and means of fire protection of passive/structural fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated in the responsible Declarations. 2.
 
|process_evidence_num_id=2
 
|process_evidence_owner=Persons
 
 
|process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration
 
|process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration
 
|process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
 
|process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
|process_evidence_submission_type=Submitted by the applicant (digital)
+
|process_evidence_note=In the case of a provisional certificate (5519 B), for the purpose of issuing a provisional certificate (active) for fire protection without or having an autopsy. NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection certificate, all mandatory and other supporting documents, if required, shall be provided for measures and means of fire protection of passive/structural fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated in the responsible Declarations. 2.
|process_evidence_type=7320
 
|registry_evidence_id=7320
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=3
 +
|process_evidence_type=7320
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|registry_evidence_id=7320
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Responsible Statement of Article 8 of Law 1599/86 (75 A) of the recognised company, considered for the authenticity of the signature, showing the number of fire extinguishers sold, maintained or reconstructed on behalf of the company - installation, according to C.I.A. 618/43/2005 (52 B), as amended, completed and valid.
 
|process_evidence_description=Responsible Statement of Article 8 of Law 1599/86 (75 A) of the recognised company, considered for the authenticity of the signature, showing the number of fire extinguishers sold, maintained or reconstructed on behalf of the company - installation, according to C.I.A. 618/43/2005 (52 B), as amended, completed and valid.
|process_evidence_is_under_prerequisite=No
 
|process_evidence_note=In the case of a provisional certificate (5519 B), for the purpose of issuing a provisional certificate (active) without or carrying out autopsy. NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection certificate, all mandatory and other supporting documents, if required, shall be provided for measures and means of fire protection of passive/structural and active fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated in the responsible Statements. 2. An active fire protection certificate shall be issued in the cases of establishments falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or (A 32).
 
|process_evidence_num_id=3
 
|process_evidence_owner=Persons
 
 
|process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration
 
|process_evidence_related_process=ΔΔ:Solemn declaration and electronic solemn declaration
 
|process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
 
|process_evidence_related_url=https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses
|process_evidence_submission_type=Submitted by the applicant (digital)
+
|process_evidence_note=In the case of a provisional certificate (5519 B), for the purpose of issuing a provisional certificate (active) without or carrying out autopsy. NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection certificate, all mandatory and other supporting documents, if required, shall be provided for measures and means of fire protection of passive/structural and active fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated in the responsible Statements. 2. An active fire protection certificate shall be issued in the cases of establishments falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or (A 32).
|process_evidence_type=7320
 
|registry_evidence_id=7320
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=4
 +
|process_evidence_type=7053
 +
|process_evidence_is_under_prerequisite=No
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Proof of deposit to the "National Bank of Greece" for the award of the "Conservation and Good Operational Instruments of Active Fire Protection" in accordance with Fire Order No 12/2012 (1794 B) as applicable each time.
 
|process_evidence_description=Proof of deposit to the "National Bank of Greece" for the award of the "Conservation and Good Operational Instruments of Active Fire Protection" in accordance with Fire Order No 12/2012 (1794 B) as applicable each time.
|process_evidence_is_under_prerequisite=No
 
 
|process_evidence_note=In the case of a provisional certificate (5519-B), for the purpose of issuing a provisional certificate (active) for fire protection without or having an autopsy. NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection certificate, all mandatory and other supporting documents, if required, shall be provided for measures and means of fire protection of passive/structural fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated in the responsible Declarations. 2. An active fire protection certificate shall be issued in the cases of establishments falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or (A 32).
 
|process_evidence_note=In the case of a provisional certificate (5519-B), for the purpose of issuing a provisional certificate (active) for fire protection without or having an autopsy. NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection certificate, all mandatory and other supporting documents, if required, shall be provided for measures and means of fire protection of passive/structural fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated in the responsible Declarations. 2. An active fire protection certificate shall be issued in the cases of establishments falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or (A 32).
|process_evidence_num_id=4
 
|process_evidence_owner=Persons
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=7053
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=5
 +
|process_evidence_type=8689
 +
|process_evidence_is_under_prerequisite=Yes
 +
|process_evidence_prerequisite=Certification, Use
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Firefighting Team Composition table, as defined in No 14/2014 Firefighting Order (2434 B) as applicable, where required.
 
|process_evidence_description=Firefighting Team Composition table, as defined in No 14/2014 Firefighting Order (2434 B) as applicable, where required.
|process_evidence_is_under_prerequisite=Yes
 
 
|process_evidence_note=In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).
 
|process_evidence_note=In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).
|process_evidence_num_id=5
 
|process_evidence_owner=Persons
 
|process_evidence_prerequisite=Certification, Use
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=8689
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=6
 +
|process_evidence_type=6866
 +
|process_evidence_is_under_prerequisite=Yes
 +
|process_evidence_prerequisite=Technical, Use
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=A copy of a declaration submitted to the information system for the issuing of 'E-Authorisations' or the information system for the management of declarations of arbitrary buildings or a copy of the printed dossier of the competent building service, correct execution of the LPG installation study category I, II or III, in accordance with Article 3.1.2.4. of Article 3 of the HSF 31856/2003 (1257 B).
 
|process_evidence_description=A copy of a declaration submitted to the information system for the issuing of 'E-Authorisations' or the information system for the management of declarations of arbitrary buildings or a copy of the printed dossier of the competent building service, correct execution of the LPG installation study category I, II or III, in accordance with Article 3.1.2.4. of Article 3 of the HSF 31856/2003 (1257 B).
|process_evidence_is_under_prerequisite=Yes
 
 
|process_evidence_note=In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).
 
|process_evidence_note=In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).
|process_evidence_num_id=6
 
|process_evidence_owner=Persons
 
|process_evidence_prerequisite=Technical, Use
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=6866
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=7
 +
|process_evidence_type=9848
 +
|process_evidence_is_under_prerequisite=Yes
 +
|process_evidence_prerequisite=Technical, Use
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Authorisation for use of natural gas on the basis of the existing legislative framework for the installation and use of natural gas, if applicable.
 
|process_evidence_description=Authorisation for use of natural gas on the basis of the existing legislative framework for the installation and use of natural gas, if applicable.
|process_evidence_is_under_prerequisite=Yes
 
 
|process_evidence_note=In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).
 
|process_evidence_note=In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).
|process_evidence_num_id=7
 
|process_evidence_owner=Persons
 
|process_evidence_prerequisite=Technical, Use
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=9848
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=8
 +
|process_evidence_type=6631
 +
|process_evidence_is_under_prerequisite=Yes
 +
|process_evidence_prerequisite=Technical, Use
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=Reasoned report by the installation organisation, together with any supporting documents for the reasons for the non-implementation of the measures and fire protection instruments, the duration of their implementation and proposed compensatory measures and fire protection instruments until they are implemented, in the event of a provisional certificate (active) fire protection being issued.
 
|process_evidence_description=Reasoned report by the installation organisation, together with any supporting documents for the reasons for the non-implementation of the measures and fire protection instruments, the duration of their implementation and proposed compensatory measures and fire protection instruments until they are implemented, in the event of a provisional certificate (active) fire protection being issued.
|process_evidence_is_under_prerequisite=Yes
 
 
|process_evidence_note=In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)), for the purpose of issuing a provisional certificate (active fire protection without or having an automation): NOTICES: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be provided for the measures and means of fire protection of passive/structural and active fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).
 
|process_evidence_note=In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)), for the purpose of issuing a provisional certificate (active fire protection without or having an automation): NOTICES: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be provided for the measures and means of fire protection of passive/structural and active fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).
|process_evidence_num_id=8
 
|process_evidence_owner=Persons
 
|process_evidence_prerequisite=Technical, Use
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=6631
 
 
}}
 
}}
 
{{process evidences
 
{{process evidences
 +
|process_evidence_num_id=9
 +
|process_evidence_type=9338
 +
|process_evidence_is_under_prerequisite=Yes
 +
|process_evidence_prerequisite=Certification, Identity
 
|process_evidence_alternative=No
 
|process_evidence_alternative=No
 +
|process_evidence_submission_type=Submitted by the applicant (digital)
 +
|process_evidence_owner=Persons
 
|process_evidence_description=A company, showing the legal representative(s) of the company signing the declaration(s).
 
|process_evidence_description=A company, showing the legal representative(s) of the company signing the declaration(s).
|process_evidence_is_under_prerequisite=Yes
 
 
|process_evidence_note=In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).
 
|process_evidence_note=In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).
|process_evidence_num_id=9
 
|process_evidence_owner=Persons
 
|process_evidence_prerequisite=Certification, Identity
 
|process_evidence_submission_type=Submitted by the applicant (digital)
 
|process_evidence_type=9338
 
}}
 
{{process evidences cost
 
|process_evidence_cost_alternative=No
 
|process_evidence_cost_description=Paradoxical for posting to the E-licence Information System of the Temporary Certificate (Energy) application.
 
|process_evidence_cost_num_id=1
 
|process_evidence_cost_payment_type=Digital (debit / credit card), Digital (web banking)
 
|process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage)
 
}}
 
{{process evidences cost
 
|process_evidence_cost_alternative=No
 
|process_evidence_cost_calculation=One-off
 
|process_evidence_cost_description=Deposit of the amount of 15 (15) euros in the Special Account of the Firehouse Clubs (040/54613247 - IBAN: GR54011004000000044613247) in the name of the owner - operator or legitimate representative of the company - installation or in the case of the deposit of the fee by e-banking, the Office will be included in the statement on the grounds, compulsory and by which the person concerned will receive the book.
 
|process_evidence_cost_max=15
 
|process_evidence_cost_min=15
 
|process_evidence_cost_num_id=2
 
|process_evidence_cost_payment_type=Bank cashier, Digital (web banking)
 
|process_evidence_cost_type=Administrative Fee (not provided by e-paravolo webpage)
 
}}
 
{{process provision digital locations
 
|process_provision_digital_location_title=Approvals and certificates (active) of fire protection (e-licensing)
 
|process_provision_digital_location_url=https://www.gov.gr/ipiresies/epikheirematike-drasterioteta/adeiodoteseis-kai-summorphose/egkriseis-kai-pistopoietika-energetikes-puroprostasias-e-adeies
 
 
}}
 
}}
 
{{process rules
 
{{process rules
 +
|process_rule_type=Ministerial Decision
 
|process_rule_decision_number=69019 οικ. Φ.700.13
 
|process_rule_decision_number=69019 οικ. Φ.700.13
 
|process_rule_decision_year=2021
 
|process_rule_decision_year=2021
 
|process_rule_description=Approval of firearms order No 13/2021: ‘Definition of the procedure for the submission of required documentation, verification and adoption of administrative firearms in undertakings — installations pursuant to Article 167 of Law No 4662/2020 (27 A’)’
 
|process_rule_description=Approval of firearms order No 13/2021: ‘Definition of the procedure for the submission of required documentation, verification and adoption of administrative firearms in undertakings — installations pursuant to Article 167 of Law No 4662/2020 (27 A’)’
 +
|process_rule_gazette_doc_number=5519
 
|process_rule_gazette_doc_issue=Β
 
|process_rule_gazette_doc_issue=Β
|process_rule_gazette_doc_number=5519
 
|process_rule_type=Ministerial Decision
 
 
|process_rule_url=https://www.et.gr/api/DownloadFeksApi/?fek_pdf=20210205519
 
|process_rule_url=https://www.et.gr/api/DownloadFeksApi/?fek_pdf=20210205519
 
}}
 
}}
 
{{process rules
 
{{process rules
 +
|process_rule_type=Ministerial Decision
 
|process_rule_decision_number=ΥΠΕΝ/ΔΑΟΚΑ/93311/3679
 
|process_rule_decision_number=ΥΠΕΝ/ΔΑΟΚΑ/93311/3679
 
|process_rule_decision_year=2021
 
|process_rule_decision_year=2021
 
|process_rule_description=Add to RIS/RISP/48123/6983/2018 Decision of the Minister for the Environment and Energy ‘Electronic submission, verification and adoption of the administrative acts referred to in Article 29 of Law 4495/2017 and the establishment of electronic services in accordance with Article 33 of Law 4495/2017’ (3136 B’).
 
|process_rule_description=Add to RIS/RISP/48123/6983/2018 Decision of the Minister for the Environment and Energy ‘Electronic submission, verification and adoption of the administrative acts referred to in Article 29 of Law 4495/2017 and the establishment of electronic services in accordance with Article 33 of Law 4495/2017’ (3136 B’).
 +
|process_rule_gazette_doc_number=4874
 
|process_rule_gazette_doc_issue=Β
 
|process_rule_gazette_doc_issue=Β
|process_rule_gazette_doc_number=4874
 
|process_rule_type=Ministerial Decision
 
 
|process_rule_url=https://www.et.gr/api/DownloadFeksApi/?fek_pdf=20210204874
 
|process_rule_url=https://www.et.gr/api/DownloadFeksApi/?fek_pdf=20210204874
 
}}
 
}}
 
{{process steps
 
{{process steps
 +
|process_step_num_id=1
 +
|process_step_exit=No
 
|process_step_child=No
 
|process_step_child=No
 +
|process_step_title=Submission of an application
 +
|process_step_official=Competent Department
 +
|process_step_implementation=Software action
 +
|process_step_duration_min=60
 +
|process_step_duration_max=120
 
|process_step_description=The Head of the Office responsible for Preventive and Repressive Fire Safety, after entering with his personal codes in the E-empty Information System, with the help of the search tools, selects the category ‘In an unsolicited check-in procedure’ for the application ‘Edition of a temporary certificate (active) fire protection’. https://web.tee.gr/e-adeies/egkriseis-py/
 
|process_step_description=The Head of the Office responsible for Preventive and Repressive Fire Safety, after entering with his personal codes in the E-empty Information System, with the help of the search tools, selects the category ‘In an unsolicited check-in procedure’ for the application ‘Edition of a temporary certificate (active) fire protection’. https://web.tee.gr/e-adeies/egkriseis-py/
|process_step_duration_max=120
 
|process_step_duration_min=60
 
|process_step_exit=No
 
|process_step_implementation=Software action
 
 
|process_step_note=At this stage the status of the application for a provisional certificate (active) fire protection is ‘In submission’ and one or more of its checks have not yet been assigned to auditors.
 
|process_step_note=At this stage the status of the application for a provisional certificate (active) fire protection is ‘In submission’ and one or more of its checks have not yet been assigned to auditors.
|process_step_num_id=1
 
|process_step_official=Competent Department
 
|process_step_title=Submission of an application
 
 
}}
 
}}
 
{{process steps
 
{{process steps
 +
|process_step_num_id=2
 +
|process_step_exit=No
 
|process_step_child=No
 
|process_step_child=No
 +
|process_step_title=Appointment to an Auditor
 +
|process_step_official=Competent Department
 +
|process_step_implementation=Software action
 +
|process_step_duration_min=60
 +
|process_step_duration_max=300
 
|process_step_description=The Head of the Office responsible for Preventive and Repressive Fire Safety Branch shall select the "Response for Control", where all necessary checks designated by the authorised engineer for the application for a "Edition of a Temporary Fire Safety Certificate". By selecting each individual check, he shall specify the name of the Controller from the list available, assigning all the required control data.
 
|process_step_description=The Head of the Office responsible for Preventive and Repressive Fire Safety Branch shall select the "Response for Control", where all necessary checks designated by the authorised engineer for the application for a "Edition of a Temporary Fire Safety Certificate". By selecting each individual check, he shall specify the name of the Controller from the list available, assigning all the required control data.
|process_step_duration_max=300
 
|process_step_duration_min=60
 
|process_step_exit=No
 
|process_step_implementation=Software action
 
 
|process_step_note=At this stage the status of the application for a provisional certificate (active) fire protection is ‘Inspected’. Co-organisation: Hellenic EMERGENCY Association: https://web.tee.gr/e-adeies/egkriseis-py/
 
|process_step_note=At this stage the status of the application for a provisional certificate (active) fire protection is ‘Inspected’. Co-organisation: Hellenic EMERGENCY Association: https://web.tee.gr/e-adeies/egkriseis-py/
|process_step_num_id=2
 
|process_step_official=Competent Department
 
|process_step_title=Appointment to an Auditor
 
 
}}
 
}}
 
{{process steps
 
{{process steps
 +
|process_step_num_id=3
 +
|process_step_exit=No
 
|process_step_child=Yes
 
|process_step_child=Yes
 +
|process_step_previous_child_selector=2
 +
|process_step_previous_child=2
 +
|process_step_title=Appropriate control result
 +
|process_step_official=Competent Directorate
 +
|process_step_implementation=Software action
 +
|process_step_duration_min=3600
 +
|process_step_duration_max=7200
 
|process_step_description=The result of all the checks required for the application ‘Edition of a provisional certificate (active) fire protection’ by the designated Auditor of the relevant Office or Local Safety and Preventive Fire Safety Branch shall be ‘Receptive’ as well as the result of the summary checks by the Head of the Office or Local Branch of Preventive and Repressive Fire Safety.
 
|process_step_description=The result of all the checks required for the application ‘Edition of a provisional certificate (active) fire protection’ by the designated Auditor of the relevant Office or Local Safety and Preventive Fire Safety Branch shall be ‘Receptive’ as well as the result of the summary checks by the Head of the Office or Local Branch of Preventive and Repressive Fire Safety.
|process_step_duration_max=7200
 
|process_step_duration_min=3600
 
|process_step_exit=No
 
|process_step_implementation=Software action
 
 
|process_step_note=Co-ordinating body: TECHNICAL CONTRIBUTION OF GREECE https://web.tee.gr/e-adeies/egkriseis-py/
 
|process_step_note=Co-ordinating body: TECHNICAL CONTRIBUTION OF GREECE https://web.tee.gr/e-adeies/egkriseis-py/
|process_step_num_id=3
 
|process_step_official=Competent Directorate
 
|process_step_previous_child=2
 
|process_step_previous_child_selector=2
 
|process_step_title=Appropriate control result
 
 
}}
 
}}
 
{{process steps
 
{{process steps
 +
|process_step_num_id=4
 +
|process_step_exit=No
 
|process_step_child=Yes
 
|process_step_child=Yes
 +
|process_step_previous_child_selector=2
 +
|process_step_previous_child=2
 +
|process_step_title=Check with shortcomings - omissions - requirements
 +
|process_step_official=Competent Directorate
 +
|process_step_implementation=Software action
 +
|process_step_duration_min=1800
 +
|process_step_duration_max=3600
 
|process_step_description=If, when checking the relevant supporting documents and particulars of the application ‘Edition of a provisional certificate (active) fire protection’, the designated auditor or Head of the competent Office or Local Safety and Preventive Firefighting Branch finds shortcomings, omissions or requirements, does not mark them as ‘Receptacles’ and chooses ‘Requires a change’, entering for each of these observations in a free text.
 
|process_step_description=If, when checking the relevant supporting documents and particulars of the application ‘Edition of a provisional certificate (active) fire protection’, the designated auditor or Head of the competent Office or Local Safety and Preventive Firefighting Branch finds shortcomings, omissions or requirements, does not mark them as ‘Receptacles’ and chooses ‘Requires a change’, entering for each of these observations in a free text.
|process_step_duration_max=3600
 
|process_step_duration_min=1800
 
|process_step_exit=No
 
|process_step_implementation=Software action
 
 
|process_step_note=Co-ordinating body: TECHNICAL CONTRIBUTION OF GREECE Link: https://web.tee.gr/e-adeies/egkriseis-py/
 
|process_step_note=Co-ordinating body: TECHNICAL CONTRIBUTION OF GREECE Link: https://web.tee.gr/e-adeies/egkriseis-py/
|process_step_num_id=4
 
|process_step_official=Competent Directorate
 
|process_step_previous_child=2
 
|process_step_previous_child_selector=2
 
|process_step_title=Check with shortcomings - omissions - requirements
 
 
}}
 
}}
 
{{process steps
 
{{process steps
 +
|process_step_num_id=5
 +
|process_step_exit=Yes
 
|process_step_child=Yes
 
|process_step_child=Yes
 +
|process_step_previous_child_selector=4
 +
|process_step_previous_child=4
 +
|process_step_title=Reimbursement for re-submission
 +
|process_step_official=Competent Directorate
 +
|process_step_implementation=Software action
 +
|process_step_duration_min=60
 +
|process_step_duration_max=120
 
|process_step_description=The designated Auditor or the Head of the Office or Local Branch of Preventive and Repressive Fire Safety shall select ‘Return to Refill from Engineer’ and the application ‘Edition of a Temporary Fire Protection Certificate’ shall return for supplementing or correcting its data by the Authorised Engineer.
 
|process_step_description=The designated Auditor or the Head of the Office or Local Branch of Preventive and Repressive Fire Safety shall select ‘Return to Refill from Engineer’ and the application ‘Edition of a Temporary Fire Protection Certificate’ shall return for supplementing or correcting its data by the Authorised Engineer.
|process_step_duration_max=120
 
|process_step_duration_min=60
 
|process_step_exit=Yes
 
|process_step_implementation=Software action
 
 
|process_step_note=Co-ordinating body: TECHNICAL CONTRIBUTION GREECE Link: https://web.tee.gr/e-adeies/egkriseis-py/
 
|process_step_note=Co-ordinating body: TECHNICAL CONTRIBUTION GREECE Link: https://web.tee.gr/e-adeies/egkriseis-py/
|process_step_num_id=5
 
|process_step_official=Competent Directorate
 
|process_step_previous_child=4
 
|process_step_previous_child_selector=4
 
|process_step_title=Reimbursement for re-submission
 
 
}}
 
}}
 
{{process steps
 
{{process steps
 +
|process_step_num_id=6
 +
|process_step_exit=No
 
|process_step_child=Yes
 
|process_step_child=Yes
 +
|process_step_previous_child_selector=3
 +
|process_step_previous_child=3
 +
|process_step_title=Constructing on-site autopsy
 +
|process_step_official=Competent Directorate
 +
|process_step_implementation=Software action
 +
|process_step_duration_min=3600
 +
|process_step_duration_max=7200
 
|process_step_description=The designated verifier shall carry out on-the-spot autopsy in the establishment and inform the competent Office or Local Safety and Preventive Fire Safety Annex of the results of its audit.
 
|process_step_description=The designated verifier shall carry out on-the-spot autopsy in the establishment and inform the competent Office or Local Safety and Preventive Fire Safety Annex of the results of its audit.
|process_step_duration_max=7200
 
|process_step_duration_min=3600
 
|process_step_exit=No
 
|process_step_implementation=Software action
 
 
|process_step_note=Co-ordinating body: TECHNICAL CONTROL GREECE Link: https://web.tee.gr/e-adeies/egkriseis-py/
 
|process_step_note=Co-ordinating body: TECHNICAL CONTROL GREECE Link: https://web.tee.gr/e-adeies/egkriseis-py/
|process_step_num_id=6
 
|process_step_official=Competent Directorate
 
|process_step_previous_child=3
 
|process_step_previous_child_selector=3
 
|process_step_title=Constructing on-site autopsy
 
 
}}
 
}}
 
{{process steps
 
{{process steps
 +
|process_step_num_id=7
 +
|process_step_exit=Yes
 
|process_step_child=Yes
 
|process_step_child=Yes
 +
|process_step_previous_child_selector=6
 +
|process_step_previous_child=6
 +
|process_step_title=Adoption of an Act
 +
|process_step_official=Competent Directorate
 +
|process_step_implementation=Software action
 +
|process_step_duration_min=60
 +
|process_step_duration_max=120
 
|process_step_description=Where the result of the on-the-spot check of the establishment by the designated verifier is unnecessarily or remarks, then the Head of the Office or the Local Branch of Preventive and Repressive Fire Safety Department shall approve in total the application ‘Edition of a provisional certificate (active) of fire protection’ and issue it by selecting a ‘Prevention’ which acquires a unique electronic key.
 
|process_step_description=Where the result of the on-the-spot check of the establishment by the designated verifier is unnecessarily or remarks, then the Head of the Office or the Local Branch of Preventive and Repressive Fire Safety Department shall approve in total the application ‘Edition of a provisional certificate (active) of fire protection’ and issue it by selecting a ‘Prevention’ which acquires a unique electronic key.
|process_step_duration_max=120
 
|process_step_duration_min=60
 
|process_step_exit=Yes
 
|process_step_implementation=Software action
 
 
|process_step_note=Co-ordinator: TECHNICAL CONTACT: https://web.tee.gr/e-adeies/egkriseis-py/
 
|process_step_note=Co-ordinator: TECHNICAL CONTACT: https://web.tee.gr/e-adeies/egkriseis-py/
|process_step_num_id=7
+
}}
|process_step_official=Competent Directorate
+
{{process provision digital locations
|process_step_previous_child=6
+
|process_provision_digital_location_title=Approvals and certificates (active) of fire protection (e-licensing)
|process_step_previous_child_selector=6
+
|process_provision_digital_location_url=https://www.gov.gr/ipiresies/epikheirematike-drasterioteta/adeiodoteseis-kai-summorphose/egkriseis-kai-pistopoietika-energetikes-puroprostasias-e-adeies
|process_step_title=Adoption of an Act
 
 
}}
 
}}
 
{{process useful links
 
{{process useful links

Revision as of 11:39, 3 April 2023



7ab0ec9d-cb80-45c4-a650-76a96d34cf8f 709804 Προσωρινό πιστοποιητικό (ενεργητικής) πυροπροστασίας

At a glance

Points of service

Available only digitally

Number of required documents

4 to 9

Fees

35 €

Deadline of completion

50 days

Description

The procedure concerns the issue of a temporary (active) fire protection certificate.

Basic information

Competent body

MINISTRY FOR CLIMATE CRISIS AND CIVIL PROTECTION

Service / organizational unit of a authority entity

Fire safety offices, local (prevention and suppression) fire safety departments

Provided to

Related links

Notes

the competent fire service (offices or local fire safety prevention and suppression departments) may issue a one-time interim (active) fire protection certificate, after the submission of the respective application and supporting documents as indicated in Item 1 of Annex C to Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), accompanied by a reasoned report from the operator, to business undertakings and facilities that:

a) fall within the scope of Article 1(2) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but have not fully completed their obligation to install a permanent water-based fire suppression network or an automatic fire suppression system. b) fall within the scope of Article 1(2.1) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but for which deviations from the passive fire protection study description have been identified, which affect aspects of the active fire protection study (Annex B). c) fall within the scope of Article 1(2.2) and (2.3) of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), but which have not fully implemented their obligations with regard to integrated structural fire protection features. Unless otherwise stipulated by fire department or special fire protection provisions, the duration of the interim (active) fire protection certificate may not exceed six (6) months. Undertakings and facilities that have already been granted an interim (active) fire protection certificate do not have the right to seek reissue. A prerequisite for the granting of an interim (active) fire protection certificate is completion of the remaining fire protection measures and the installation of equipment provided for in the respective study. This certificate shall also specify any additional or increased fire protection measures and equipment required by the fire department and the deadlines by which they must be completed.

As of entry into force of Fire Service Regulation No 13/2021 (Government Gazette, Series II, No 5519), paragraph 63 of Joint Ministerial Decision No 3021/19/6/1986 ‘Limitation of certificates and other supporting documents required by the current provisions for the processing of citizens’ cases by public sector services’ is no longer applicable (Government Gazette, Series II, No 847).

Last update

13/03/2025

Application

Application Type

Application

Submission by:

Submitted by the applicant (digital)

Submitted by:

Persons

Title

Temporary certificate (active) of fire protection

Notes:

From the date of entry into force of the information system, in accordance with the accreditation act of the President of the TEI, provided for in the FPI No. PNEN/DACC/933111/3679/2021 Decision of the Secretary of State for Environment and Energy (B'4874), the procedure for the submission, verification, management and monitoring of the workflow for the adoption of this administrative fire protection acts shall be carried out electronically through the information system ‘E-Authorities’, upon request by an authorised engineer and the submission of the necessary documents and evidence. Access to the ‘E-Authorities’, with regard to the adoption of the administrative fire protection acts, shall be carried out through the Single Digital Portal of Public Administration (Gov.gr), which shall be used by all stakeholders in the procedures for the adoption of those acts, namely the competent Firefighting Services (Futures or Local DCFS).

What you will need

Means of authentication, identification and signature

Access Codes for My TEE.

    Print

    Requirements

      Fees

        Related


        In order to withdraw, amend or cancel the administrative act, the person concerned may lodge a request for treatment - hierarchical action as referred to in Article 24 of Law 2690/1999 (45 A) as applicable. The issue of a provisional certificate (active) fire protection as well as other administrative fire protection acts shall be governed by Law 2690/1999.

        Output & Results

        Output

        Administrative Act, Digital document production, Launch another procedure

        Steps

          Digital steps

            Other information

            Alternative titles

            Issue of an interim (active) fire protection certificate Issue of an interim fire safety certificate, Issue of an interim fire safety certificate

            Official title

            Interim (active) fire protection certificate

            Languages supported

            Greek, English

            Legislation

              ,,,,,,,,,


            • 1 Educational To hold a diploma in engineering corresponding to his specialty, higher education multi-technical schools on the national level.

              No No

            • 2 Educational To hold a diploma in engineering corresponding to his specialty in the multi-technical schools of higher education institutions of the national territory.

              Yes Yes

            • 3 Educational To hold a diploma in engineering corresponding to the specialty of equal foreign schools.

              Yes Yes

            • 4 Professional He has obtained permission to pursue a profession by the Technical Chamber of Greece to become a mandatory member and to hold the title of "Diplomatic Engineer - Members T.E.".

              No No

            • 5 Possession of passwords to enter software To obtain personal passwords for the electronic service 'My TEE'.

              No No

            • 1 Paradoxical for posting to the E-licence Information System of the Temporary Certificate (Energy) application.


              Method of Payment Digital (debit / credit card), Digital (web banking)

              Type of Cost Administrative Fee (not provided by e-paravolo webpage)

              No

            • 2 Deposit of the amount of 15 (15) euros in the Special Account of the Firehouse Clubs (040/54613247 - IBAN: GR54011004000000044613247) in the name of the owner - operator or legitimate representative of the company - installation or in the case of the deposit of the fee by e-banking, the Office will be included in the statement on the grounds, compulsory and by which the person concerned will receive the book. 15 €

              Cost Calculation One-off

              Method of Payment Bank cashier, Digital (web banking)

              Type of Cost Administrative Fee (not provided by e-paravolo webpage)

              No

            • 1 Responsible Statement of Article 8 of Law No 1599/1986 (75 A) of the supervisor or of the person responsible for the authentic signature, that: (a) Confidentiality has been obtained and installed as provided for in the approved study, passive/structural fire protection data having an effect on active fire protection means, all conditions and conditions laid down by the applicable provisions and the applicable fire protection law of the premises for the use of the establishment have been complied with; (b) Receivable and installed as required by the applicable approved fire protection plan and the applicable fire protection legislation for the use of the undertaking; (c) Confirmation measures and means of active fire protection have been complied with; (d) Confidentiality certificates for the use of fire-fighting equipment or fire-fighting equipment (B to 3149) have been received and installed as appropriate, and the approved technical descriptions of the conformity of the fire-fighting equipment and technical documentation of the fire-fighting equipment, as well as specified in the approved declaration of conformity assessment of the conformity assessment of the conformity of the conformity of the conformity of the fire-fighting equipment and technical documentation as required in the conformity of the conformity of the conformity of the conformity of the conformity of the conformity of the operations, as specified in respecting products and/applications in the approved under examinations in the approved in the approved under assessment bodies and/application of the approved in the approved under assessments. Solemn Declaration

              Responsible Statement of Article 8 of Law No 1599/1986 (75 A) of the supervisor or of the person responsible for the authentic signature, that: (a) Confidentiality has been obtained and installed as provided for in the approved study, passive/structural fire protection data having an effect on active fire protection means, all conditions and conditions laid down by the applicable provisions and the applicable fire protection law of the premises for the use of the establishment have been complied with; (b) Receivable and installed as required by the applicable approved fire protection plan and the applicable fire protection legislation for the use of the undertaking; (c) Confirmation measures and means of active fire protection have been complied with; (d) Confidentiality certificates for the use of fire-fighting equipment or fire-fighting equipment (B to 3149) have been received and installed as appropriate, and the approved technical descriptions of the conformity of the fire-fighting equipment and technical documentation of the fire-fighting equipment, as well as specified in the approved declaration of conformity assessment of the conformity assessment of the conformity of the conformity of the conformity of the fire-fighting equipment and technical documentation as required in the conformity of the conformity of the conformity of the conformity of the conformity of the conformity of the operations, as specified in respecting products and/applications in the approved under examinations in the approved in the approved under assessment bodies and/application of the approved in the approved under assessments.

              Relevant link: https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Relevant Procedure: ΔΔ:ΔΔ:Solemn declaration and electronic solemn declaration

              Notes: Υποχρεωτικό δικαιολογητικό της Περίπτωσης 1ης του Παραρτήματος Γ της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄), για την έκδοση προσωρινού πιστοποιητικού (ενεργητικής) πυροπροστασίας χωρίς ή με τη διενέργεια αυτοψίας. ΥΠΟΣΗΜΕΙΩΣΕΙΣ: 1. Στην περίπτωση χορήγησης προσωρινού πιστοποιητικού (ενεργητικής) πυροπροστασίας υποβάλλονται όλα τα υποχρεωτικά και λοιπά δικαιολογητικά, εφόσον απαιτούνται, για τα μέτρα και μέσα πυροπροστασίας παθητικής / δομικής και ενεργητικής πυροπροστασίας που έχουν εγκατασταθεί από τις μελέτες πυροπροστασίας, εξαιρουμένων αυτών που δεν έχουν υλοποιηθεί, τα οποία και θα αναγράφονται ρητά στις Υπεύθυνες Δηλώσεις. 2. Πιστοποιητικό ενεργητικής πυροπροστασίας χορηγείται στις περιπτώσεις επιχειρήσεων - εγκαταστάσεων που υπάγονται στο πεδίο εφαρμογής των κανονισμών πυροπροστασίας κτιρίων (π.δ. 41/2018 (Α΄ 80) ή π.δ. 71/1988 (Α΄ 32). Στις επιχειρήσεις - εγκαταστάσεις που υπάγονται στις λοιπές κανονιστικές διατάξεις πυροπροστασίας χορηγείται πιστοποιητικό πυροπροστασίας (Άρθρο 2 της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄) - Ορισμοί). 3. Σε περιπτώσεις επιχειρήσεων - εγκαταστάσεων, όπου υφίστανται πέραν της μίας (1) εγκεκριμένες μελέτες πυροπροστασίας (όπως βιομηχανική εγκατάσταση με πολλά κτίρια ή κτίρια με διαφορετικές χρήσεις ή που χρησιμοποιεί για τις λειτουργικές του ανάγκες υγραέριο ή εγκαταστάσεις πετρελαιοειδών προϊόντων κλπ.), η Υπεύθυνη Δήλωση αναφέρεται στο σύνολο των εγκεκριμένων μελετών πυροπροστασίας. 4. Η έννοια της παθητικής πυροπροστασίας αναφέρεται σε κτίρια που υπάγονται στο πεδίο εφαρμογής των κανονισμών πυροπροστασίας κτιρίων (π.δ. 41/2018 (Α΄ 80) ή π.δ. 71/1988 (Α΄ 32) (παρ. 2.1. του άρθρου 1 και άρθρου 2 - Ορισμοί της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄)). 5. Η έννοια της δομικής πυροπροστασίας αναφέρεται σε κτίρια που υπάγονται σε πυροσβεστικές ή ειδικές διατάξεις πυροπροστασίας (παρ. 2.2. και 2.3. του άρθρου 1 και άρθρου 2 - Ορισμοί της υπ΄ αριθμ. 13/2021 Πυροσβεστικής Διάταξης (5519 Β΄)). 6. Σύμφωνα με το άρθρο 8 του π.δ. 41/2018 (80 Α΄) «…..Ο κύριος του έργου οφείλει να τηρεί αρχείο με τα πιστοποιητικά υλικών και δομικών στοιχείων που εγκαταστάθηκαν στο κτίριο. Με την ενεργοποίηση της ηλεκτρονικής ταυτότητας των κτιρίων, τα ανωτέρω πιστοποιητικά αναρτώνται στον σχετικό ηλεκτρονικό φάκελο του κτιρίου και αποτελούν αναπόσπαστα μέρη αυτού.»

              Document submitted under requirements: No


              No 7320

            • 2 Responsible Statement of Article 8 of Law 1599/86 (75 A) of the owner-occupier, employer or legal representative of the company-installation, that: (a) They have been obtained, installed, well-established and operated in accordance with the requirements of the relevant national, European standards, manufacturers' manuals and 12/2012 Firearms Order (1794 B), as in force each time, and will be maintained, in accordance with the requirements of the relevant national, European standards, manufacturers' manuals and No 12/2012 Firearms Order (1794 B), as each time in force. Solemn Declaration

              Responsible Statement of Article 8 of Law 1599/86 (75 A) of the owner-occupier, employer or legal representative of the company-installation, that: (a) They have been obtained, installed, well-established and operated in accordance with the requirements of the relevant national, European standards, manufacturers' manuals and 12/2012 Firearms Order (1794 B), as in force each time, and will be maintained, in accordance with the requirements of the relevant national, European standards, manufacturers' manuals and No 12/2012 Firearms Order (1794 B), as each time in force.

              Relevant link: https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Relevant Procedure: ΔΔ:ΔΔ:Solemn declaration and electronic solemn declaration

              Notes: In the case of a provisional certificate (5519 B), for the purpose of issuing a provisional certificate (active) for fire protection without or having an autopsy. NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection certificate, all mandatory and other supporting documents, if required, shall be provided for measures and means of fire protection of passive/structural fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated in the responsible Declarations. 2.

              Document submitted under requirements: No


              No 7320

            • 3 Responsible Statement of Article 8 of Law 1599/86 (75 A) of the recognised company, considered for the authenticity of the signature, showing the number of fire extinguishers sold, maintained or reconstructed on behalf of the company - installation, according to C.I.A. 618/43/2005 (52 B), as amended, completed and valid. Solemn Declaration

              Responsible Statement of Article 8 of Law 1599/86 (75 A) of the recognised company, considered for the authenticity of the signature, showing the number of fire extinguishers sold, maintained or reconstructed on behalf of the company - installation, according to C.I.A. 618/43/2005 (52 B), as amended, completed and valid.

              Relevant link: https://www.gov.gr/ipiresies/polites-kai-kathemerinoteta/psephiaka-eggrapha-gov-gr/ekdose-upeuthunes-deloses

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Relevant Procedure: ΔΔ:ΔΔ:Solemn declaration and electronic solemn declaration

              Notes: In the case of a provisional certificate (5519 B), for the purpose of issuing a provisional certificate (active) without or carrying out autopsy. NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection certificate, all mandatory and other supporting documents, if required, shall be provided for measures and means of fire protection of passive/structural and active fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated in the responsible Statements. 2. An active fire protection certificate shall be issued in the cases of establishments falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or (A 32).

              Document submitted under requirements: No


              No 7320

            • 4 Proof of deposit to the "National Bank of Greece" for the award of the "Conservation and Good Operational Instruments of Active Fire Protection" in accordance with Fire Order No 12/2012 (1794 B) as applicable each time. Proof of payment / Receipt

              Proof of deposit to the "National Bank of Greece" for the award of the "Conservation and Good Operational Instruments of Active Fire Protection" in accordance with Fire Order No 12/2012 (1794 B) as applicable each time.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: In the case of a provisional certificate (5519-B), for the purpose of issuing a provisional certificate (active) for fire protection without or having an autopsy. NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection certificate, all mandatory and other supporting documents, if required, shall be provided for measures and means of fire protection of passive/structural fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated in the responsible Declarations. 2. An active fire protection certificate shall be issued in the cases of establishments falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or (A 32).

              Document submitted under requirements: No


              No 7053

            • 5 Firefighting Team Composition table, as defined in No 14/2014 Firefighting Order (2434 B) as applicable, where required. Table / Statement / Catalogue

              Firefighting Team Composition table, as defined in No 14/2014 Firefighting Order (2434 B) as applicable, where required.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).

              Document submitted under requirements: Yes

              Document’s requirement: Certification, Use

              No 8689

            • 6 A copy of a declaration submitted to the information system for the issuing of 'E-Authorisations' or the information system for the management of declarations of arbitrary buildings or a copy of the printed dossier of the competent building service, correct execution of the LPG installation study category I, II or III, in accordance with Article 3.1.2.4. of Article 3 of the HSF 31856/2003 (1257 B).

              A copy of a declaration submitted to the information system for the issuing of 'E-Authorisations' or the information system for the management of declarations of arbitrary buildings or a copy of the printed dossier of the competent building service, correct execution of the LPG installation study category I, II or III, in accordance with Article 3.1.2.4. of Article 3 of the HSF 31856/2003 (1257 B).

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).

              Document submitted under requirements: Yes

              Document’s requirement: Technical, Use

              No 6866

            • 7 Authorisation for use of natural gas on the basis of the existing legislative framework for the installation and use of natural gas, if applicable. License to use

              Authorisation for use of natural gas on the basis of the existing legislative framework for the installation and use of natural gas, if applicable.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).

              Document submitted under requirements: Yes

              Document’s requirement: Technical, Use

              No 9848

            • 8 Reasoned report by the installation organisation, together with any supporting documents for the reasons for the non-implementation of the measures and fire protection instruments, the duration of their implementation and proposed compensatory measures and fire protection instruments until they are implemented, in the event of a provisional certificate (active) fire protection being issued. Report

              Reasoned report by the installation organisation, together with any supporting documents for the reasons for the non-implementation of the measures and fire protection instruments, the duration of their implementation and proposed compensatory measures and fire protection instruments until they are implemented, in the event of a provisional certificate (active) fire protection being issued.

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)), for the purpose of issuing a provisional certificate (active fire protection without or having an automation): NOTICES: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be provided for the measures and means of fire protection of passive/structural and active fire protection installed by fire protection studies, except those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).

              Document submitted under requirements: Yes

              Document’s requirement: Technical, Use

              No 6631

            • 9 A company, showing the legal representative(s) of the company signing the declaration(s). Legal documents from legal entities

              A company, showing the legal representative(s) of the company signing the declaration(s).

              Submission by: Submitted by the applicant (digital)

              Submitted by: Persons

              Notes: In the case of a provisional certificate (as appropriate) in Annex C No 13/2021 to the Fire Protection Order (5519(b)) for the purpose of issuing a provisional certificate (active fire protection without or having a self-confidence). NOTE: 1. In the case of the issue of a provisional certificate (active) fire protection, all mandatory and other supporting documents, if necessary, shall be submitted for the purposes of measures and fire protection of passive/structural and active fire protection installed by fire protection studies, excluding those which have not been carried out, which shall be expressly indicated to the Heads of Statements. 2. An active fire protection certificate shall be issued in cases of undertakings - installations falling within the scope of the fire protection regulations (e.g. 41/2018 (A 80) or d.g. 71/1988 (A 32).

              Document submitted under requirements: Yes

              Document’s requirement: Certification, Identity

              No 9338

            • Ministerial Decision 69019 οικ. Φ.700.13 2021 5519 Β

              Description Approval of firearms order No 13/2021: ‘Definition of the procedure for the submission of required documentation, verification and adoption of administrative firearms in undertakings — installations pursuant to Article 167 of Law No 4662/2020 (27 A’)’

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20210205519

            • Ministerial Decision ΥΠΕΝ/ΔΑΟΚΑ/93311/3679 2021 4874 Β

              Description Add to RIS/RISP/48123/6983/2018 Decision of the Minister for the Environment and Energy ‘Electronic submission, verification and adoption of the administrative acts referred to in Article 29 of Law 4495/2017 and the establishment of electronic services in accordance with Article 33 of Law 4495/2017’ (3136 B’).

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20210204874

            • 1 Submission of an application

              Responsible for Implementation Competent Department

              Μethod of Implementation Software action

              Description The Head of the Office responsible for Preventive and Repressive Fire Safety, after entering with his personal codes in the E-empty Information System, with the help of the search tools, selects the category ‘In an unsolicited check-in procedure’ for the application ‘Edition of a temporary certificate (active) fire protection’. https://web.tee.gr/e-adeies/egkriseis-py/

              Notes At this stage the status of the application for a provisional certificate (active) fire protection is ‘In submission’ and one or more of its checks have not yet been assigned to auditors.

              No No


            • 2 Appointment to an Auditor

              Responsible for Implementation Competent Department

              Μethod of Implementation Software action

              Description The Head of the Office responsible for Preventive and Repressive Fire Safety Branch shall select the "Response for Control", where all necessary checks designated by the authorised engineer for the application for a "Edition of a Temporary Fire Safety Certificate". By selecting each individual check, he shall specify the name of the Controller from the list available, assigning all the required control data.

              Notes At this stage the status of the application for a provisional certificate (active) fire protection is ‘Inspected’. Co-organisation: Hellenic EMERGENCY Association: https://web.tee.gr/e-adeies/egkriseis-py/

              No No


            • 3 Appropriate control result

              Responsible for Implementation Competent Directorate

              Μethod of Implementation Software action

              Description The result of all the checks required for the application ‘Edition of a provisional certificate (active) fire protection’ by the designated Auditor of the relevant Office or Local Safety and Preventive Fire Safety Branch shall be ‘Receptive’ as well as the result of the summary checks by the Head of the Office or Local Branch of Preventive and Repressive Fire Safety.

              Notes Co-ordinating body: TECHNICAL CONTRIBUTION OF GREECE https://web.tee.gr/e-adeies/egkriseis-py/

              Yes No


            • 4 Check with shortcomings - omissions - requirements

              Responsible for Implementation Competent Directorate

              Μethod of Implementation Software action

              Description If, when checking the relevant supporting documents and particulars of the application ‘Edition of a provisional certificate (active) fire protection’, the designated auditor or Head of the competent Office or Local Safety and Preventive Firefighting Branch finds shortcomings, omissions or requirements, does not mark them as ‘Receptacles’ and chooses ‘Requires a change’, entering for each of these observations in a free text.

              Notes Co-ordinating body: TECHNICAL CONTRIBUTION OF GREECE Link: https://web.tee.gr/e-adeies/egkriseis-py/

              Yes No


            • 5 Reimbursement for re-submission

              Responsible for Implementation Competent Directorate

              Μethod of Implementation Software action

              Description The designated Auditor or the Head of the Office or Local Branch of Preventive and Repressive Fire Safety shall select ‘Return to Refill from Engineer’ and the application ‘Edition of a Temporary Fire Protection Certificate’ shall return for supplementing or correcting its data by the Authorised Engineer.

              Notes Co-ordinating body: TECHNICAL CONTRIBUTION GREECE Link: https://web.tee.gr/e-adeies/egkriseis-py/

              Yes Yes


            • 6 Constructing on-site autopsy

              Responsible for Implementation Competent Directorate

              Μethod of Implementation Software action

              Description The designated verifier shall carry out on-the-spot autopsy in the establishment and inform the competent Office or Local Safety and Preventive Fire Safety Annex of the results of its audit.

              Notes Co-ordinating body: TECHNICAL CONTROL GREECE Link: https://web.tee.gr/e-adeies/egkriseis-py/

              Yes No


            • 7 Adoption of an Act

              Responsible for Implementation Competent Directorate

              Μethod of Implementation Software action

              Description Where the result of the on-the-spot check of the establishment by the designated verifier is unnecessarily or remarks, then the Head of the Office or the Local Branch of Preventive and Repressive Fire Safety Department shall approve in total the application ‘Edition of a provisional certificate (active) of fire protection’ and issue it by selecting a ‘Prevention’ which acquires a unique electronic key.

              Notes Co-ordinator: TECHNICAL CONTACT: https://web.tee.gr/e-adeies/egkriseis-py/

              Yes Yes




            • Cookies help us deliver our services. By using our services, you agree to our use of cookies.