| Line 90: |
Line 90: |
| | |process_evidence_type=Notification/Announcement | | |process_evidence_type=Notification/Announcement |
| | |process_evidence_identification_type=Identification with TAXISnet codes | | |process_evidence_identification_type=Identification with TAXISnet codes |
| − | |process_evidence_description=Νotification of commencement of operation of a factory or winery for the manufacture of concentrated grape must through the ‘notify business’ site | + | |process_evidence_description=Νotification of commencement of operation of a factory or winery for the manufacture of concentrated grape must through the ‘notify business’ site. |
| | |process_evidence_submission_type=Submitted by the applicant (digital) | | |process_evidence_submission_type=Submitted by the applicant (digital) |
| | |process_evidence_related_url=https://notifybusiness.gov.gr/assets/index.html | | |process_evidence_related_url=https://notifybusiness.gov.gr/assets/index.html |
| Line 98: |
Line 98: |
| | |process_evidence_alternative=No | | |process_evidence_alternative=No |
| | |process_evidence_owner=Legal entities, Persons | | |process_evidence_owner=Legal entities, Persons |
| − | |process_evidence_type=Other | + | |process_evidence_type=Notification/Announcement |
| | |process_evidence_description=Proof of submission of the notification | | |process_evidence_description=Proof of submission of the notification |
| | |process_evidence_submission_type=Keep within business establishment | | |process_evidence_submission_type=Keep within business establishment |
| Line 116: |
Line 116: |
| | |process_evidence_type=Drawings/studies by an engineer/architect | | |process_evidence_type=Drawings/studies by an engineer/architect |
| | |process_evidence_description=Brief technical description of the installation, signed by the legally competent engineer, containing: | | |process_evidence_description=Brief technical description of the installation, signed by the legally competent engineer, containing: |
| − | - Land surveyor’s diagram showing the building installations and the necessary signalling and traffic regulation information within the plot. | + | - Land surveyor’s diagram showing the building installations and the necessary signalling and traffic regulation information within the plot. |
| − | - Description of the activity (production process, type of raw materials used and products produced, flow chart of work performed, etc.) | + | - Description of the activity (production process, type of raw materials used and products produced, flow chart of work performed, etc.) |
| − | - Floor plan with indicative placement of the machines on it and a list of the machines with the indication of their power. The place-ment information is to be provided in order to facilitate controls and any deviations in the presentation of their placement on the floor plan is not subject to sanction, as long as there is no safety issue. | + | - Floor plan with indicative placement of the machines on it and a list of the machines with the indication of their power. The place-ment information is to be provided in order to facilitate controls and any deviations in the presentation of their placement on the floor plan is not subject to sanction, as long as there is no safety issue. |
| | |process_evidence_submission_type=Keep within business establishment | | |process_evidence_submission_type=Keep within business establishment |
| | }} | | }} |
| Line 151: |
Line 151: |
| | |process_evidence_type=Other | | |process_evidence_type=Other |
| | |process_evidence_description=Special supporting documents (required on a case by case basis): | | |process_evidence_description=Special supporting documents (required on a case by case basis): |
| − | - Solemn declaration of undertaking the supervision, operation and maintenance of the unit by its owner and the legally competent engineer respectively, when the total driving power of the unit exceeds 59 kW (80HP), or a maintenance contract of the mechanical equipment by the manufacturer assuming the responsibility of the operation of the mechanical equipment. | + | - Solemn declaration of undertaking the supervision, operation and maintenance of the unit by its owner and the legally competent engineer respectively, when the total driving power of the unit exceeds 59 kW (80HP), or a maintenance contract of the mechanical equipment by the manufacturer assuming the responsibility of the operation of the mechanical equipment. |
| − | - Fire Safety Certificate from the competent Fire Department in accordance with the joint ministerial decision F15/ oik.1589/ 104/2006 (B90), if required. If the unit includes an installation of liquid fuels or LPG for the operational needs of the units, the provisions of the joint ministerial decision of 28-6-1991 (GG 578B/ 1991) and the ministerial decision D3/ 14858/1993 (B 477) apply respectively. | + | - Fire Safety Certificate from the competent Fire Department in accordance with the joint ministerial decision F15/ oik.1589/ 104/2006 (B90), if required. If the unit includes an installation of liquid fuels or LPG for the operational needs of the units, the provisions of the joint ministerial decision of 28-6-1991 (GG 578B/ 1991) and the ministerial decision D3/ 14858/1993 (B 477) apply respectively. |
| − | - Valid certificate of control for the LPG tanks of the unit, according to the ministerial decision D3/ 14858/ 1993 (B 477), article 3.3.13, if required. | + | - Valid certificate of control for the LPG tanks of the unit, according to the ministerial decision D3/ 14858/ 1993 (B 477), article 3.3.13, if required. |
| − | - Valid acceptance certificate and control certificate for the boilers of the unit, according to articles 5 and 9 of the ministerial decision 10735/ 651/ 2012 (B 2656), if required. | + | - Valid acceptance certificate and control certificate for the boilers of the unit, according to articles 5 and 9 of the ministerial decision 10735/ 651/ 2012 (B 2656), if required. |
| − | - Water use permit, in case of use of water from a drilling for artisanal use, if required. | + | - Water use permit, in case of use of water from a drilling for artisanal use, if required. |
| − | - Solemn declaration according to the ministerial decision of paragraph 3 of article 3A of law 2244/1994 for the backup power generators of the unit, if required. | + | - Solemn declaration according to the ministerial decision of paragraph 3 of article 3A of law 2244/1994 for the backup power generators of the unit, if required. |
| − | - Authorisation to level or interrupt a section of sidewalk, or approval of traffic connection or approval of entry - exit by the competent Service for the maintenance of the road(s) in front of the unit, accompanied by a solemn declaration by a legally competent engineer that the traffic connection or entry - exit of the installation was performed according to the approved plans. | + | - Authorisation to level or interrupt a section of sidewalk, or approval of traffic connection or approval of entry - exit by the competent Service for the maintenance of the road(s) in front of the unit, accompanied by a solemn declaration by a legally competent engineer that the traffic connection or entry-exit of the installation was performed according to the approved plans. |
| − | - Licence to use natural gas, if required. | + | - Licence to use natural gas, if required. |
| − | - Authorisation for activities of processing food and other products of animal origin, pursuant to Regulations 853/ 2004 (L139) or 183/ 2005 (L35) or 1069/ 2009 (L300). | + | - Authorisation for activities of processing food and other products of animal origin, pursuant to Regulations 853/ 2004 (L139) or 183/ 2005 (L35) or 1069/ 2009 (L300). |
| − | - Permit for the construction of a port project and the use of the seashore and beach, if required. | + | - Permit for the construction of a port project and the use of the seashore and beach, if required. |
| | |process_evidence_submission_type=Keep within business establishment | | |process_evidence_submission_type=Keep within business establishment |
| | }} | | }} |
| Line 178: |
Line 178: |
| | |process_rule_article=71, 72, 79 | | |process_rule_article=71, 72, 79 |
| | |process_rule_description=Specifically : | | |process_rule_description=Specifically : |
| − | - Articles 71, 79 -Amending Law 4442/ 2016 (replacing article 17), | + | - Articles 71, 79 -Amending Law 4442/ 2016 (replacing article 17), |
| | - Article 72 -Amending Law 4442/2016 (amending article 18, about fees). | | - Article 72 -Amending Law 4442/2016 (amending article 18, about fees). |
| | |process_rule_gazette_doc_number=105 | | |process_rule_gazette_doc_number=105 |
| Line 264: |
Line 264: |
| | }} | | }} |
| | {{process provision digital locations | | {{process provision digital locations |
| − | |process_provision_digital_location_title=Notification | + | |process_provision_digital_location_title=Notify Business Portal |
| | |process_provision_digital_location_url=https://notifybusiness.gov.gr/assets/index.html | | |process_provision_digital_location_url=https://notifybusiness.gov.gr/assets/index.html |
| | }} | | }} |