Approval of a Technical Environmental Study (TES)

From National Registry of Administrative Public Services



2bf459d6-421b-4dc1-bb85-19f5a005c23c 931421 Έγκριση Τεχνικής Περιβαλλοντικής Μελέτης (ΤΕΠΕΜ)

At a glance

Points of service

DIRECTORATE FOR ENVIRONMENTAL LICENSING (For projects/activities of Subcategory A1) DECENTRALISED ADMINISTRATION/DIRECTORATE FOR THE ENVIRONMENT AND SPATIAL PLANNING (for projects/activities of Subcategory A2), MINISTRY OF ENVIRONMENT AND ENERGY

Number of required documents

5

Fees

Provided without cost

Estimated Time

1 to 3 months

Description

The procedure concerns the approval of a Technical Environmental Study (TES) of a project or activity.

Basic information

Competent body

MINISTRY OF ENVIRONMENT AND ENERGY

Authority/Public body’s Unit responsible for the institutional framework of the procedure

Service / organizational unit of a authority entity

DIRECTORATE FOR ENVIRONMENTAL LICENSING (For projects/activities of Subcategory A1) DECENTRALISED ADMINISTRATION/DIRECTORATE FOR THE ENVIRONMENT AND SPATIAL PLANNING (for projects/activities of Subcategory A2)

Related links

Validity duration

Indefinite

Notes

Facilities and works resulting from the technical planning of projects or activities at a stage following the issuance of their Decisions Approving Technical Terms (AEPO), such as construction site facilities, dump sites, motorist service stations, service and maintenance centres for projects or activities, toll stations, anti-noise protection works, clarification of technical measures and terms of the project’s AEPO, are approved through the submission and assessment of a Technical Environmental Study (TES) to the authority responsible for environmental licensing. The TES is approved by decision of the Director General of Environmental Policy of the Ministry of Environment (projects/activities of Subcategory A1) and the Secretary General of the Decentralised Administration (of the project concerned) (projects/activities of Subcategory A2).

Last update

18/10/2024

Application

Application Type

Application

Submission by:

Submitted by the applicant (digital)

Submitted by:

Legal entities, Legal entities under private law, Persons, Public bodies, Public entities

Title

Submission of TES application for A1/A2 projects/activities

What you will need

Means of authentication, identification and signature

Digital signature, Identification with TAXISnet codes

    Print

    Requirements

      Fees

        Related


        Means of redress or appeal:

        Hierarchical appeal/recourse

        Application for review or administrative appeal in accordance with Section 24 of Law 2690/1999. Applicants may request either that the administrative authority which issued the act revoke or amend it (request for review), or that the authority having jurisdiction over the authority which issued the act annul it (appeal). The administrative authority to which the relevant application is submitted must notify the applicant of its decision on the application no later than within thirty (30) days, unless a different deadline is set under specific provisions.

        Output & Results

        Output

        Digital document production, Document Production

        Steps

          Digital steps

            Other information

            Alternative titles

            Procedure for the approval of TES

            Official title

            Procedure for assessment of the final study and the implementation study of a project or activity

            Languages supported

            Greek, English

            Registries updated

            Ειδικός διαδικτυακός τόπος aepo.ypeka.gr
            Ηλεκτρονικό Περιβαλλοντικό Μητρώο (ΗΠΜ)

            Legislation

              Categories

              Τype of procedure

              Trigger

              Applied for

              Trigger (submission method)

              Application (digital)

              Type

              Outgoing
              N1

              ,,


            • 1 Administrative Necessary conditions for the submission and approval of the TES are: (a) the general impact assessment and the provision of general and/or specific terms and restrictions for such facilities and works and operations in the Decision Approving Technical Terms (AEPO); and b) the explicit provision, in the AEPO of the project or activity, of the possibility to submit and approve a TES.


              No No

            • 2 Possession of passwords to enter software In order to digitally submit the relevant study, the operator of the project or activity should have Taxisnet codes.

              No No

            • 1 Technical description of the specific technical object dealt with Action / implementation plan

              Technical description of the specific technical object dealt with

              Submission by: Submitted by the applicant (digital)

              Submitted by: Legal entities, Legal entities under private law, Persons, Public bodies, Public entities


              Document submitted under requirements: No


              No 7230

            • 2 Specific technical calculations and simulation models where required for the detailed determination of emissions or levels of environmental modulation in relation to the existing state of the environment Other Document

              Specific technical calculations and simulation models where required for the detailed determination of emissions or levels of environmental modulation in relation to the existing state of the environment

              Submission by: Submitted by the applicant (digital)

              Submitted by: Legal entities, Legal entities under private law, Persons, Public bodies, Public entities


              Document submitted under requirements: No


              No 7475

            • 3 Clarification of the technical details of projects, measures and restrictions for the protection of the environment Other Document

              Clarification of the technical details of projects, measures and restrictions for the protection of the environment

              Submission by: Submitted by the applicant (digital)

              Submitted by: Legal entities, Legal entities under private law, Persons, Public bodies, Public entities


              Document submitted under requirements: No


              No 7475

            • 4 The compliance of the Technical Environmental Study with the Decision Approving Technical Terms (AEPO) of the project or activity Environmental Compliance Receipt

              The compliance of the Technical Environmental Study with the Decision Approving Technical Terms (AEPO) of the project or activity

              Submission by: Submitted by the applicant (digital)

              Submitted by: Legal entities, Legal entities under private law, Persons, Public bodies, Public entities


              Document submitted under requirements: No


              No 9681

            • 5 Topographic diagram and photographic documentation where applicable Topographical drawing

              Topographic diagram and photographic documentation where applicable

              Submission by: Submitted by the applicant (digital)

              Submitted by: Legal entities, Legal entities under private law, Public bodies, Public entities


              Document submitted under requirements: No


              No 6851

            • Law 11 4014/2011 2011 209 Α

              Description Technical environmental design file

              Legal references https://www.et.gr/api/DownloadFeksApi/?fek pdf=20110100209

            • 1 Receipt of the application of the Project Operator

              Responsible for Implementation Competent Directorate

              Μethod of Implementation Software action

              Description The Project Operator shall digitally submit the Technical Environmental Study (TES) and the necessary supporting documents.

              No No


            • 2 Checking and sending, where appropriate, to an Advisory Service for opinions

              Responsible for Implementation Competent Directorate

              Μethod of Implementation Inspection


              No No


            • 3 Approving the Technical Environmental Study (TES)

              Responsible for Implementation Competent Directorate

              Μethod of Implementation Software action


              No No


            • 4 Processing and updating the project file

              Responsible for Implementation Competent Employee

              Μethod of Implementation Software action


              No No


            • Cookies help us deliver our services. By using our services, you agree to our use of cookies.